Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Ibney Hasan

Sr mechanical engineer

Ruwais Marine Services

Location:
Qatar - Doha
Education:
Bachelor's degree, BE
Experience:
15 years, 10 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  15 Years, 10 Months   

October 2022 To Present

Sr mechanical engineer

at Ruwais Marine Services
Location : Qatar - Doha
 HeatloadcalculationbyusingHAP, Carriersheet&E20.
 Chilled water pipe design and head count for pump selection.
 DuctdesignandStaticpressurecountingforequipmentselectionbasedonASHRAE.
MechanicalVentilation&LiftlobbyStaircasePressurizationcalculation
 DomesticwaterpipedesignandwaterdemandcountingforwatertankcapacitybasedonIPC.
 FirewaterpipedesignandsprinklerspacingbasedonNFPA.
 Fire water tank capacity based on NFPA.
 Responsible for making safe Sequence of operation for complete mechanical including CO2, CO, and H2 sensors based on CFD analysis report for car park management system.
 VRF Piping design, gas calculation, Equipment selection, installation, Testing & Commissioning.
 Firefighting System(Sprinkler, FHR, FHC, LANDING VALVE, DRY RISER, WET RISER, DELUGE, NOVEC,
FM200 System) installation, Testing & Commissioning)
 Plumbing System (Domestic Water, Storm Water, Sewage Water, ) installation, Testing & Commissioning.
 Preparation/reviewofmethodstatementforHVAC/MEPsystem.
 Preparation/reviewofInspectiontestplanforHVAC/MEPsystem.
 Preparation/reviewofoperationsequenceforHVAC/MEPsystem.
 Preparation/reviewofscheduleandManualforOperation&Maintenance.
 Preparation/reviewofTesting&CommissioningchecklistforHVAC/MEPsystem.
 FamiliarwithBMS, BACS, SCADA, Systeminstallation, Testing&Commissioning.
 Time management to work within tight deadline to finish projects on time.
 Provide technical knowledge along with training to the concerned people for quality project completion within the time frame.
 Possesssoundknowledgeofworkingindustrystandards&CodessuchasNFPA, ASHRAE, Carrier, SMACNA, DW-144, IPC, API, UFC, UPC, ASTM, ASME, NBC & QCDD.
 Review of HVAC, FF, PP, C.A Design drawing, shop drawing, Coordination drawing, project specification & applicable standard.
 StrongUnderstandingofProjectSpecification&Clientrequirements.
 Site Survey as per design and reporting to project manager.
 Coordinationwithdesignteamfordesignandsiterelatedissues.
 Coordination with civil team for site relate dissues.
 Attending client & Consultant meeting weekly and monthly with all project status.
 Preparation PTW as per project requirement such as energized, tunnel & track area work permit.
 Preparation of bill of quantity as per site for cost evaluation.
 Preparation/reviewMAS, MR, MIR, WIR, RFIforHVAC/MEP System.
 Sendingsitematerialsrequestasperspecificationtoprocurementteamandprocurethesame for the sake of smooth execution.
 Preparationofworkschedule&mobilizationofengineerorsupervisorteamatsiteandensureall of them attend safety orientation and having proper PPE’s prior start activities at site.
 Attend the MIR, WIR inspection with consultant and comply the comments at any level. Which were got from the consultant and take the approvals same from the consultants.
 Motivate, manage and develop the projects engineering personnel resources assigned to his responsibility.
 Direct Interaction with the client and consultant regarding approval. Submittals and execution related issue.
 Closely monitor site activities to ensure quality of work and get daily progress report and update to Pm.
 Overall supervision of individual projects through the designated project engineering team. Planning of activities so that execution takes minimum time.
 EnsuringalwaysimplicationofISOnormsduringinstallationofProjectHandlingtheoverallproject as per specification.
 Quality Assurance - Responsible for working within the provisions and guidelines of the Quality Assurance system relevant to the BU, etc.
 Safety - Responsible for personal safety safe working practices. Procedures.
 Manage Sub Contractors, Their progress and monthly invoice.
 Assistthecommissioningteaminpre-commissioningandcommissioningstage.
 AssisttheTABteamontesting, adjusting&balancingstage.
 Correlatingthedrawingwithactualsiteconditions.
 PreparationofscheduleandManualforoperationandmaintenance.
July 2020 To October 2022

Sr mechanical engineer

at Bilfinger
Location : Qatar - Doha
 HeatloadcalculationbyusingHAP, Carriersheet&E20.
 Chilled water pipe design and head count for pump selection.
 DuctdesignandStaticpressurecountingforequipmentselectionbasedonASHRAE.
MechanicalVentilation&LiftlobbyStaircasePressurizationcalculation
 DomesticwaterpipedesignandwaterdemandcountingforwatertankcapacitybasedonIPC.
 FirewaterpipedesignandsprinklerspacingbasedonNFPA.
 Fire water tank capacity based on NFPA.
 Responsible for making safe Sequence of operation for complete mechanical including CO2, CO, and H2 sensors based on CFD analysis report for car park management system.
 VRF Piping design, gas calculation, Equipment selection, installation, Testing & Commissioning.
 Firefighting System(Sprinkler, FHR, FHC, LANDING VALVE, DRY RISER, WET RISER, DELUGE, NOVEC,
FM200 System) installation, Testing & Commissioning)
 Plumbing System (Domestic Water, Storm Water, Sewage Water, ) installation, Testing & Commissioning.
 Preparation/reviewofmethodstatementforHVAC/MEPsystem.
 Preparation/reviewofInspectiontestplanforHVAC/MEPsystem.
 Preparation/reviewofoperationsequenceforHVAC/MEPsystem.
 Preparation/reviewofscheduleandManualforOperation&Maintenance.
 Preparation/reviewofTesting&CommissioningchecklistforHVAC/MEPsystem.
 FamiliarwithBMS, BACS, SCADA, Systeminstallation, Testing&Commissioning.
 Time management to work within tight deadline to finish projects on time.
 Provide technical knowledge along with training to the concerned people for quality project completion within the time frame.
 Possesssoundknowledgeofworkingindustrystandards&CodessuchasNFPA, ASHRAE, Carrier, SMACNA, DW-144, IPC, API, UFC, UPC, ASTM, ASME, NBC & QCDD.
 Review of HVAC, FF, PP, C.A Design drawing, shop drawing, Coordination drawing, project specification & applicable standard.
 StrongUnderstandingofProjectSpecification&Clientrequirements.
 Site Survey as per design and reporting to project manager.
 Coordinationwithdesignteamfordesignandsiterelatedissues.
 Coordination with civil team for site relate dissues.
 Attending client & Consultant meeting weekly and monthly with all project status.
 Preparation PTW as per project requirement such as energized, tunnel & track area work permit.
 Preparation of bill of quantity as per site for cost evaluation.
 Preparation/reviewMAS, MR, MIR, WIR, RFIforHVAC/MEP System.
 Sendingsitematerialsrequestasperspecificationtoprocurementteamandprocurethesame for the sake of smooth execution.
 Preparationofworkschedule&mobilizationofengineerorsupervisorteamatsiteandensureall of them attend safety orientation and having proper PPE’s prior start activities at site.
 Attend the MIR, WIR inspection with consultant and comply the comments at any level. Which were got from the consultant and take the approvals same from the consultants.
 Motivate, manage and develop the projects engineering personnel resources assigned to his responsibility.
 Direct Interaction with the client and consultant regarding approval. Submittals and execution related issue.
 Closely monitor site activities to ensure quality of work and get daily progress report and update to Pm.
 Overall supervision of individual projects through the designated project engineering team. Planning of activities so that execution takes minimum time.
 EnsuringalwaysimplicationofISOnormsduringinstallationofProjectHandlingtheoverallproject as per specification.
 Quality Assurance - Responsible for working within the provisions and guidelines of the Quality Assurance system relevant to the BU, etc.
 Safety - Responsible for personal safety safe working practices. Procedures.
 Manage Sub Contractors, Their progress and monthly invoice.
 Assistthecommissioningteaminpre-commissioningandcommissioningstage.
 AssisttheTABteamontesting, adjusting&balancingstage.
 Correlatingthedrawingwithactualsiteconditions.
 PreparationofscheduleandManualforoperationandmaintenance.
December 2018 To March 2020

Projects Mechanical Engineer

at Trags electrical engineering & air conditioning co.
Location : Qatar - Doha
 HeatloadcalculationbyusingHAP, Carriersheet&E20.
 Chilled water pipe design and head count for pump selection.
 DuctdesignandStaticpressurecountingforequipmentselectionbasedonASHRAE.
MechanicalVentilation&LiftlobbyStaircasePressurizationcalculation
 DomesticwaterpipedesignandwaterdemandcountingforwatertankcapacitybasedonIPC.
 FirewaterpipedesignandsprinklerspacingbasedonNFPA.
 Fire water tank capacity based on NFPA.
 Responsible for making safe Sequence of operation for complete mechanical including CO2, CO, and H2 sensors based on CFD analysis report for car park management system.
 VRF Piping design, gas calculation, Equipment selection, installation, Testing & Commissioning.
 Firefighting System(Sprinkler, FHR, FHC, LANDING VALVE, DRY RISER, WET RISER, DELUGE, NOVEC,
FM200 System) installation, Testing & Commissioning)
 Plumbing System (Domestic Water, Storm Water, Sewage Water, ) installation, Testing & Commissioning.
 Preparation/reviewofmethodstatementforHVAC/MEPsystem.
 Preparation/reviewofInspectiontestplanforHVAC/MEPsystem.
 Preparation/reviewofoperationsequenceforHVAC/MEPsystem.
 Preparation/reviewofscheduleandManualforOperation&Maintenance.
 Preparation/reviewofTesting&CommissioningchecklistforHVAC/MEPsystem.
 FamiliarwithBMS, BACS, SCADA, Systeminstallation, Testing&Commissioning.
 Time management to work within tight deadline to finish projects on time.
 Provide technical knowledge along with training to the concerned people for quality project completion within the time frame.
 Possesssoundknowledgeofworkingindustrystandards&CodessuchasNFPA, ASHRAE, Carrier, SMACNA, DW-144, IPC, API, UFC, UPC, ASTM, ASME, NBC & QCDD.
 Review of HVAC, FF, PP, C.A Design drawing, shop drawing, Coordination drawing, project specification & applicable standard.
 StrongUnderstandingofProjectSpecification&Clientrequirements.
 Site Survey as per design and reporting to project manager.
 Coordinationwithdesignteamfordesignandsiterelatedissues.
 Coordination with civil team for site relate dissues.
 Attending client & Consultant meeting weekly and monthly with all project status.
 Preparation PTW as per project requirement such as energized, tunnel & track area work permit.
 Preparation of bill of quantity as per site for cost evaluation.
 Preparation/reviewMAS, MR, MIR, WIR, RFIforHVAC/MEP System.
 Sendingsitematerialsrequestasperspecificationtoprocurementteamandprocurethesame for the sake of smooth execution.
 Preparationofworkschedule&mobilizationofengineerorsupervisorteamatsiteandensureall of them attend safety orientation and having proper PPE’s prior start activities at site.
 Attend the MIR, WIR inspection with consultant and comply the comments at any level. Which were got from the consultant and take the approvals same from the consultants.
 Motivate, manage and develop the projects engineering personnel resources assigned to his responsibility.
 Direct Interaction with the client and consultant regarding approval. Submittals and execution related issue.
 Closely monitor site activities to ensure quality of work and get daily progress report and update to Pm.
 Overall supervision of individual projects through the designated project engineering team. Planning of activities so that execution takes minimum time.
 EnsuringalwaysimplicationofISOnormsduringinstallationofProjectHandlingtheoverallproject as per specification.
 Quality Assurance - Responsible for working within the provisions and guidelines of the Quality Assurance system relevant to the BU, etc.
 Safety - Responsible for personal safety safe working practices. Procedures.
 Manage Sub Contractors, Their progress and monthly invoice.
 Assistthecommissioningteaminpre-commissioningandcommissioningstage.
 AssisttheTABteamontesting, adjusting&balancingstage.
 Correlatingthedrawingwithactualsiteconditions.
 PreparationofscheduleandManualforoperationandmaintenance.
July 2016 To December 2018

MEP Coordinator

at Marine Air conditioning & refrigeration co
Location : Qatar - Doha
Supervision and coordination of all MEP activities and design calculation too. I was involved from starting the project up to handover the client (Preparation the RFI, MS, MAS, SD review, MIR, IR etc till testing, Commissioning and OnM manual.) I have done several project like residential and commercial projects, Villas, high rise buildings). Air cooled & water filled chiller, district cooling system, CRAC unit in data center, Plumbing, FF (wet, dry, gas FM200, NOVEC 1230, deluge system, ) Compressed air system, Fuel system etc).
November 2014 To June 2016

Mechanical engineer

at Al Jafr Trading and contracting co
Location : Saudi Arabia - Dammam
Coordinate & monitor all MEP activities (Mechanical, Electrical, Water, Plumbing, Drainage, Irrigation and Fire Fighting) HVAC DESIGNING, with their program schedule for proper flow of work on site which concerns the structural and architectural services.
Coordinate other issues with our Site Construction Manager, Technical Engineer, Document Controller, QA/QC, QS and Procurement.
Prepares and conducts (partly) MEP Weekly Progress Meeting with the Subcontractors.
Attends Consultant’s Technical Meeting with our PM, SCM, Co-staff and Subcontractors.
March 2013 To November 2014

MEP ENGINEER

at JAIPRAKASH ASSOCIATES LTD
Location : India - Delhi
Coordinate & monitor all MEP activities (Mechanical, Electrical, Water, Plumbing, Drainage, Irrigation and Fire Fighting) with their program schedule for proper flow of work on site which concerns the structural and architectural services.
Coordinate other issues with our Site Construction Manager, Technical Engineer, Document Controller, QA/QC, QS and Procurement.
Prepares and conducts (partly) MEP Weekly Progress Meeting with the Subcontractors.
Attends Consultant’s Technical Meeting with our PM, SCM, Co-staff and Subcontractors.
October 2010 To March 2013

PROJECT ENGINEER

at VOLTAS LTD
Location : India - Delhi
Handles complete installation of Variable Refrigerant Volume System. 38 FLOORS (WALL MOUNTED; Duct able unit Type and Ceiling Suspended cassette, HRV unit).
In-charge for the complete installation such as Smoke Exhaust System, Stair Pressurization and Toilet Exhaust System and Fan coil Units (Split type).
Other operations include installation of Ventilation System of Fans, Blowers, Air Washer, Kitchen Exhaust and Supply Duct as well as Toilet Exhaust Duct Prepares and conducts (partly) MEP Weekly Progress Meeting with the Subcontractors.
Attends Consultant’s Technical Meeting with our PM, Co-staff and Subcontractors.
May 2008 To October 2010

SITE ENGINEER

at ATMOS AIRCON
Location : India - Delhi
Handles complete installation of Variable Refrigerant Volume System.
Handling the execution at site as per specification.
Measurement of installed Qty Billing.
Making RA Bill as per tender and certify the same from client.
Coordination with civil, Electrical & plumbing agencies.
Checking the contractor bill and certify the same.
Making Heat load Sheet & Quotation.
Ensuring always implication of ISO norms during installation of project.
Make sure all the execution work completed with proper implementation of all kind of safety measures related to work.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
May 2008

Bachelor's degree, BE

at MDU ROHTAK
Location : India - Faridabad

Specialties & Skills

BASICS OF COMPUTER AND NET

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Intermediate

Arabic

Intermediate

Hindi

Expert

Urdu

Expert

Training and Certifications

HVAC DESIGN & DRAFTING ( Training )

Dhanush engg services india pvt.ltd
March 2014 (90 hours)

UPDA ( Certificate )

Issued in: September 2018

Saudi council of Engineering ( Certificate )

Issued in: September 2015

Loading
Loading...
Loading...