Ali Aboelseoud Ali Elnaggar, Construction team leader

Ali Aboelseoud Ali Elnaggar

Construction team leader

GAMA construction

Lieu
Egypte - Ismaïlia
Éducation
Baccalauréat, CIVIL
Expérience
16 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 4 Mois

Construction team leader à GAMA construction
  • Egypte - Le Caire
  • juillet 2019 à février 2021

Create an inspiring team environment with an open communication culture
Delegating work to team members
Working to budgets and managing team finances efficiently
Briefing your team on targets and providing business updates
Monitoring team performance and carrying out appraisals
Ensuring work is completed on time, to a high standard and in line with health and safety guidelines
Listen to team members’ feedback and resolve any issues or conflicts Showing new and inexperienced construction workers how to do the job
Ensuring workers follow company policy and procedures Checking and internal audit of work
Working with technical drawings and plans.

Construction Manager à GRANTECH constructions
  • Egypte - Ismaïlia
  • septembre 2018 à juillet 2019

Planning and coordinating site daily different works (civil, architecture and electro-mechanic).
Managing site resources to achieve project goals (quality, cost, time).
Quantity Surveying works.
Page 3 of 5
Conduct on -site investigations and analyse data (maps, reports, tests, drawings and other).
Assess potential risks, materials and costs.
Provide advice and resolve creatively any emerging problems /deficiencies.
Handle over the resulting structures and services for use.
Monitor progress and compile reports in project status.
Comply with guidelines and regulations including permits, safety etc. and deliver technical files and other technical documentation as required

Project Manager à Benaa for real state
  • Qatar
  • avril 2017 à janvier 2019

Complete Building from Foundation to complete Finishing works
Contains Activities
- All concrete works, Finishing works
- Firefighting, Fire alarm, Fire safety systems, Ventilation works
-Main electrical works (substation, mv panels, generator
, inside studios electrical works etc…), Elevators
- Aluminum works ( windows, panels ), G R C for Interfaces
-Epoxy works for car parking floors
-Isolation works for water tank, wet areas, Roof
Main contractor
BENAA FOR Real Estate DEVELOPMENT

Section Manager à HASSAN ALLAM CONSRTUCTION
  • Egypte
  • juillet 2016 à octobre 2016

Complete factory all industrial works Silos, Preheater
&crasher & lime stone storage & substations, Cooler, tunnels, landscape, roads, and etc.
Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works & ready mix concrete.
Applied industrial safety in all the phases of the project

Area manager ( slip form manager ) à Industrial Construction &Engineering Company
  • Qatar
  • septembre 2015 à juin 2016

Complete factory all industrial works silos, Preheater
&crasher & lime stone storage & substations and etc.
Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works &ready mix concrete.
Applied industrial safety in all the phases of the project

Consulting construction Manager à OKOPLAN CONSULTING Engineers
  • Egypte - Le Caire
  • janvier 2015 à septembre 2015

670 villas ( concrete and finishing ) contain swimming pools, lakes, roads, landscaping, stone bridges, water tank, irrigation tank

Construction manager à Engineering company and integrated projects
  • Egypte - Le Caire
  • avril 2012 à octobre 2014

Building a factory to produce milk products and have all civil works \[production building -boiler - (water - gas and treatment tanks\]
And have terms:
Post tension concrete and high finishing works
-floors (ceramic-granite…etc.)
-doors (France metal - Hormann -Delta )
- False celling.
-Roads (R c slabs - interlock )
-Ready mix concrete (with fiber steel and with fiber glass)
-central air conditioning and firefighting works
-Exterior paints (saveto …etc)
-Interior paints ( acrylic )
- Epoxy paints for (walls and floors )
-Isolation against (sound -water -heat) for roofs and tanks
-Make lines of feeding and drainage and test this lines

Site Engineer( senior ) then Slip form manager à Esaco Manufacturing Engineering & Contracting S. A. E
  • Egypte - Alexandrie
  • août 2008 à février 2012

Complete factory all industrial works silos & packing and etc. Using systems like (slip form system & Pre-stress cables for Silos & using scaffolding design on heavy works &ready mix concrete

Site Manager à Al Islamic company FOR General Contracting
  • Egypte - Le Caire
  • février 2008 à août 2008

Scope of work is concrete works.
Building 14 Floors (Concrete) (raft -2 basements and 4 floors).

Site Manager (Slip Form Engineer) à Lift Slab Company
  • Arabie Saoudite - Rabigh
  • octobre 2006 à février 2008

Use slipfom techniques to achieve Silos works (formwork, steel reinforcement, embedded parts, openings, post tension cables, and concreting and finishing).

Project Engineer à Primes International Company
  • Arabie Saoudite - Taëf
  • juillet 2005 à octobre 2005

32 Floors with plan runway (concretes), swimming pool, steel form works (acrow misr scaffolding systems), automatic car parking system and placing concrete using stationary pump.

Site Engineer à Al Rehab Company for General Contracting
  • Egypte - Ismaïlia
  • juillet 2003 à février 2004

High rise building 12 floor (concrete works, finishing works).

Army Consultant à Army General Contracting
  • Egypte - Ismaïlia
  • avril 2002 à juin 2003

Excavation works, steel reinforcement works, RC concrete work, parking cars steel structures

Site Engineer à AL Dawllia Company (General Contracting)
  • Egypte - Ismaïlia
  • décembre 2001 à mars 2002

Every Unit 5 Floors (Concrete works, finishing works).

Éducation

Baccalauréat, CIVIL
  • à Zagazig University , College of Engineerning
  • octobre 2001

Specialties & Skills

AutoCAD
Microsoft Office
Microsoft office
internet
motivated
project management
Microsoft project
Autocad 2019

Langues

Anglais
Expert

Adhésions

Egyptian Engineers syndicate.
  • Member
  • January 2001

Formation et Diplômes

PMP (Certificat)
Date de la formation:
November 2020
Valide jusqu'à:
November 2026

Loisirs

  • Related works
    quantity survey using ( MS office2013 –AutoCAD 2015) Documentation and submittals. Planning and scheduling using Microsoft MS project 2013 Work-Shop drawings. Safety control Surveying works. Design for acromisr scaffolding system