على النجار, Construction team leader

على النجار

Construction team leader

GAMA construction

البلد
مصر - الإسماعيلية‎
التعليم
بكالوريوس, CIVIL
الخبرات
16 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 4 أشهر

Construction team leader في GAMA construction
  • مصر - القاهرة
  • يوليو 2019 إلى فبراير 2021

Create an inspiring team environment with an open communication culture
Delegating work to team members
Working to budgets and managing team finances efficiently
Briefing your team on targets and providing business updates
Monitoring team performance and carrying out appraisals
Ensuring work is completed on time, to a high standard and in line with health and safety guidelines
Listen to team members’ feedback and resolve any issues or conflicts Showing new and inexperienced construction workers how to do the job
Ensuring workers follow company policy and procedures Checking and internal audit of work
Working with technical drawings and plans.

Construction Manager في GRANTECH constructions
  • مصر - الإسماعيلية‎
  • سبتمبر 2018 إلى يوليو 2019

Planning and coordinating site daily different works (civil, architecture and electro-mechanic).
Managing site resources to achieve project goals (quality, cost, time).
Quantity Surveying works.
Page 3 of 5
Conduct on -site investigations and analyse data (maps, reports, tests, drawings and other).
Assess potential risks, materials and costs.
Provide advice and resolve creatively any emerging problems /deficiencies.
Handle over the resulting structures and services for use.
Monitor progress and compile reports in project status.
Comply with guidelines and regulations including permits, safety etc. and deliver technical files and other technical documentation as required

Project Manager في Benaa for real state
  • قطر
  • أبريل 2017 إلى يناير 2019

Complete Building from Foundation to complete Finishing works
Contains Activities
- All concrete works, Finishing works
- Firefighting, Fire alarm, Fire safety systems, Ventilation works
-Main electrical works (substation, mv panels, generator
, inside studios electrical works etc…), Elevators
- Aluminum works ( windows, panels ), G R C for Interfaces
-Epoxy works for car parking floors
-Isolation works for water tank, wet areas, Roof
Main contractor
BENAA FOR Real Estate DEVELOPMENT

Section Manager في HASSAN ALLAM CONSRTUCTION
  • مصر
  • يوليو 2016 إلى أكتوبر 2016

Complete factory all industrial works Silos, Preheater
&crasher & lime stone storage & substations, Cooler, tunnels, landscape, roads, and etc.
Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works & ready mix concrete.
Applied industrial safety in all the phases of the project

Area manager ( slip form manager ) في Industrial Construction &Engineering Company
  • قطر
  • سبتمبر 2015 إلى يونيو 2016

Complete factory all industrial works silos, Preheater
&crasher & lime stone storage & substations and etc.
Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works &ready mix concrete.
Applied industrial safety in all the phases of the project

Consulting construction Manager في OKOPLAN CONSULTING Engineers
  • مصر - القاهرة
  • يناير 2015 إلى سبتمبر 2015

670 villas ( concrete and finishing ) contain swimming pools, lakes, roads, landscaping, stone bridges, water tank, irrigation tank

Construction manager في Engineering company and integrated projects
  • مصر - القاهرة
  • أبريل 2012 إلى أكتوبر 2014

Building a factory to produce milk products and have all civil works \[production building -boiler - (water - gas and treatment tanks\]
And have terms:
Post tension concrete and high finishing works
-floors (ceramic-granite…etc.)
-doors (France metal - Hormann -Delta )
- False celling.
-Roads (R c slabs - interlock )
-Ready mix concrete (with fiber steel and with fiber glass)
-central air conditioning and firefighting works
-Exterior paints (saveto …etc)
-Interior paints ( acrylic )
- Epoxy paints for (walls and floors )
-Isolation against (sound -water -heat) for roofs and tanks
-Make lines of feeding and drainage and test this lines

Site Engineer( senior ) then Slip form manager في Esaco Manufacturing Engineering & Contracting S. A. E
  • مصر - الإسكندرية
  • أغسطس 2008 إلى فبراير 2012

Complete factory all industrial works silos & packing and etc. Using systems like (slip form system & Pre-stress cables for Silos & using scaffolding design on heavy works &ready mix concrete

Site Manager في Al Islamic company FOR General Contracting
  • مصر - القاهرة
  • فبراير 2008 إلى أغسطس 2008

Scope of work is concrete works.
Building 14 Floors (Concrete) (raft -2 basements and 4 floors).

Site Manager (Slip Form Engineer) في Lift Slab Company
  • المملكة العربية السعودية - رابغ
  • أكتوبر 2006 إلى فبراير 2008

Use slipfom techniques to achieve Silos works (formwork, steel reinforcement, embedded parts, openings, post tension cables, and concreting and finishing).

Project Engineer في Primes International Company
  • المملكة العربية السعودية - الطائف
  • يوليو 2005 إلى أكتوبر 2005

32 Floors with plan runway (concretes), swimming pool, steel form works (acrow misr scaffolding systems), automatic car parking system and placing concrete using stationary pump.

Site Engineer في Al Rehab Company for General Contracting
  • مصر - الإسماعيلية‎
  • يوليو 2003 إلى فبراير 2004

High rise building 12 floor (concrete works, finishing works).

Army Consultant في Army General Contracting
  • مصر - الإسماعيلية‎
  • أبريل 2002 إلى يونيو 2003

Excavation works, steel reinforcement works, RC concrete work, parking cars steel structures

Site Engineer في AL Dawllia Company (General Contracting)
  • مصر - الإسماعيلية‎
  • ديسمبر 2001 إلى مارس 2002

Every Unit 5 Floors (Concrete works, finishing works).

الخلفية التعليمية

بكالوريوس, CIVIL
  • في Zagazig University , College of Engineerning
  • أكتوبر 2001

Specialties & Skills

AutoCAD
Microsoft Office
Microsoft office
internet
motivated
project management
Microsoft project
Autocad 2019

اللغات

الانجليزية
متمرّس

العضويات

Egyptian Engineers syndicate.
  • Member
  • January 2001

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
November 2020
صالحة لغاية:
November 2026

الهوايات

  • Related works
    quantity survey using ( MS office2013 –AutoCAD 2015) Documentation and submittals. Planning and scheduling using Microsoft MS project 2013 Work-Shop drawings. Safety control Surveying works. Design for acromisr scaffolding system