Ali Khan  Mangwano, Project engineer

Ali Khan Mangwano

Project engineer

IIW-INDUSTRIAL ENGINEERS & CONTRACTORS

البلد
باكستان - كراتشي
التعليم
دبلوم عالي, familiarisation course
الخبرة
40 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :40 years, 3 أشهر

Project engineer في IIW-INDUSTRIAL ENGINEERS & CONTRACTORS
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ أغسطس 2011

Professional Trainings & Workshops
Skills Year Proficiency

Basic Electrical course 1984-85 Advance

Engineer في Tahir Engineers & Contractors
  • الهند
  • يناير 2007 إلى نوفمبر 2012

Tahir Engineers & Contractors
As Assist. Engineer From 2007-Till to date

*
Reporting to MD
*
Working & managing the team of Electricians as Assist. Engineer for the project work of Elect

(a) Chevron Kiamari Terminal Karachi
Installation of MS conduit, Explosion proof conduiting & wiring, Underground Cables laying,
Main Electrical panel installation Flood light pole installation etc.

(b) PSO LPG Plant Korangi Site Karachi
Electrical Earthing system net work installation, Flood light Pole installation, LV Armored
Cables Underground laying & installation, Main distribution panel installation.

(c) PSO LPG Plant Lahore
Installation of Earthing Net work for the instrument & all Electrical Equipment, Installation & Fabrication of flood light pole, Installation of flood light, Installation of main Distribution
Panel, Laying of LV Armored underground Electrical cables,

(d) PSO Lalpir Furnace Oil Terminal
Laying of LV Armored Electrical Cables, Construction of RCC main Cables Pit Underground, Under
ground RCC pipe laying, Main distribution Panel installation etc

(e) PSO Head Office Karachi
Installation of electrical Wiring, Pvc Coduiting, Split AC wiring & Installation as per Drawing
Installation of CCTV & PABAX system.

(f) PSO ZOT Terminal Karachi
Installation of 1000 kva DG set Laying of LV cables, Repair & installation of Flood Lights.

(g) PSO Lalpir Furnace Oil Terminal
Construction & installation of Electronic Weigh Bridge

(h) SSGC LPG Air Mix Plant Noshki
Erection all electrical System, Installation Building Wiring, Construction of flood light pole
foundation, installation of flood light pole & flood light 400w, Underground Cables Laying,
Installation of earthing net work system, Installation of 300 kva DG set, Main Distribution
Panel installation & Termination.

(i) SSGC LPG Air Mix Plant Sorab
Erection all electrical System, Installation Building Wiring, Construction of flood light pole
foundation, installation of flood light pole & flood light 400w, Underground Cables Laying,
Installation of earthing net work system, Installation of 300 kva DG set, Main Distribution
Panel installation & Termination.

(j) PPL Chachar Gas Field
Installation of F&G system, Installation of Explosion proof Flame detectors, Smoke detector
Axed type, Heat detectors Axed type, Gas detectors Axed type, Beacon sounder, Manuel
break glass, Laying of Instrument Cables, Installation Explosion proof conduit, Junction box,
Plc & scada system

(k) PSO Lalpir Furnace oil terminal
Construction of Heavy over Head Bridge crossing road Siam Nala Railway track for Gi cable Tray
Installation Laying Cables in Cable tray.

(l) Civil Aviation Pso Lahore Air port
Fault Tracing With Fault tracer of HT Cable, Excavation of Underground HT cable Rejoining With
Rhycuom joint, Back filling & termination.

* Develop BOQ on MS EXCEL, AS build Drawings on AutoCAD Software, Maintain daily
Progress sheet, Monitor safety tool meeting.
* Develop & monitor Daily Progress report.

tahir engineers & contractors في Advance
  • باكستان - كراتشي
  • فبراير 2007 إلى أغسطس 2011

AutoCAD Course With Tree d 2007 Advance

Saeed Associate في Advance
  • باكستان - كراتشي
  • يناير 1996 إلى فبراير 2007
Electrical technician في Advance
  • باكستان - كراتشي
  • ديسمبر 1984 إلى أغسطس 1996

Electrical Supervisory License 2003 Advance

manager في ali electric
  • باكستان - حيدر أباد
  • يناير 1994 إلى يناير 1996
electrician في Matiari Sugar Mills Limited
  • باكستان - حيدر أباد
  • يناير 1993 إلى يناير 1995

Matiari Sugar Mills Limited
As Wire man from 1993 to 1995
*
Reporting to electrical engineer
*
Laying & perdition LV Armored cables
*
Maintenance of Lt panels, Servicing of starters, Three Phase motors, flood lights etc

junior Technician في Pakistan Air Force
  • الإمارات العربية المتحدة
  • يناير 1984 إلى يناير 1993

Pakistan Air Force
As junior Technician from 1984 to 1993
*
Worked as electrical fitter on F-6 Air Craft flight line
*
Worked as electrical fitter in Aero space ground equipment section on power motors
Vehicles, Batteries. etc
*
Worked as an Electrical Fitter in Air Craft Electrical Equipment Maintenance shop on
F-7p, A-5, T- 33 air Craft equipment testing, Maintenance & Calibration of all Electrical
F-6, instrument.
*
Worked as an Electrical Fitter in Air Craft periodic Maintenance Section for the periodic
Inspection of F-6, F-7p air Craft.

الخلفية التعليمية

دبلوم عالي, familiarisation course
  • في School of Aeronautics Pakistan Air Force
  • أغسطس 1989

Specialties & Skills

Project Work
Project Reporting
Facilities
Equipment Installation
CALIBRATION
FLIGHT LINE
INSPECTION
MAINTENANCE
PLUMBING
ENGINEER
TESTING
EQUIPMENT MAINTENANCE
ASSOCIATE

اللغات

الأوردو
اللغة الأم
الانجليزية
متوسط

التدريب و الشهادات

Auto CAD 2D & 3D (الشهادة)
تاريخ الدورة:
September 2007

الهوايات

  • Watching movies