RESPONSIBILITIES
•Review and convey Engineer’s consent to the Contractors Baseline program of works in line with Contract conditions.
•Validation of compatibility of assigned resources for timely completion of the project.
•Generation of monthly Cash projection and resources histograms.
•Arranging coordination meetings with Employer’s representatives to demonstrate Contractor’s program, Engineer’s observations, if any.
•Assist Resident Engineer & Quantity Surveyor in tracking the project against its baseline schedule.
•Identify the potential areas of delay, highlight the critical events & suggest / provide mitigation measures to minimize those delays during progress meetings.
•Revise the internal schedule as per conclusions, design modifications or other alternatives to be taken.
•Exercising alternative to assess their time impacts of any variations / omissions / instructions to demonstrate the Employer prior to finalizing/issuing such variation to the contractor. (have assessed 52 Delay Claims by the Contractor

Planning Engineer في Parsons - United Arab Emirates
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ نوفمبر 2018
Planning Engineer في Ghantoot transport & general contracting Co
  • الإمارات العربية المتحدة
  • مارس 2017 إلى نوفمبر 2018

and Resident Engineer in responding to contractor’s notices.
•Compilation of correspondences, drawings, and other contemporaneous records with coordination of site staff and contractor personnel to analyze Contractor’s Extension of Time claim.
•Preparation of Engineer’s initial report, impacted programs using suitable delay analyzing techniques to support/substantiate the Engineer’s recommendations on contractor’s claims.
•Preparation of presentation of Engineer’s determination on Contractor’s claims to demonstrate the Employer’s representatives.
•Attending meeting with Employer’s representative to demonstrate contractor’s claims and

PLANNING ENGINEER في Nael & Bin Harmal Hydroexport Est. (NBHH)
  • الإمارات العربية المتحدة
  • ديسمبر 2014 إلى ديسمبر 2016

Project: Infrastructure, Buildings, Structural (PEB’s), Underground piping & utilities including water lines, Substations, Roads, Sea water intake works for Central Island & West island in Upper Zakum (UZ750), Abu Dhabi
Consultant / PMC: Petrofac
Client: ZADCO
Contract Value: AED 800 Million

Project Brief:
Construction of Infrastructure, Buildings, Structural (PEB’s), Underground piping & utilities including water lines, Substations, Roads, Sea water intake works for Central Island & West island in Upper Zakum (UZ750) oil field. (Offshore)

RESPONSIBILITIES

•Preparation of Baseline program in Primavera (P6), track and update of progress in the master schedule on monthly basis.
•Revision of the baseline program on client approval.
•Preparation of Weekly/ Monthly look ahead.
•Preparation of resource schedules for the shipment.
•Updating the Weekly, Monthly Reports.
•Interaction with the team on the critical activities.
•Review of the sub-contractor’s schedule / status reports.
•Follow-up of work performed by

PLANNING ENGINEER في Al Wataniya united engineering & contracting co
  • الإمارات العربية المتحدة
  • نوفمبر 2012 إلى نوفمبر 2014

Construction of Asphalt road to Wadi Al Sahtan in Rustaq, Oman
Consultant: NEO
Client: DoT, Oman
Contract Value: USD 100 Million


Project Brief

Construction of bridges, culverts, retaining wall and Asphalt road (32 km)

RESPONSIBILITIES

•Preparation of Baseline schedule, revision & updating schedule In P6
•Preparation of overall construction program, monitoring project progress against Planned Schedules, earned value analysis, Cost control, analysis in the change of contract scope / delay if any, etc.
•Preparation of daily, weekly & monthly progress reports and presentations.
•Preparing Cost curve based on Cash flow (Cost control) and budget preparation for the projects.
•Preparing & presenting project status reports for weekly internal review meeting, Consultant meeting & Sub contractor meeting.
•Proactively anticipate potential schedule issues and advise management.
•Preparing extension of time (EOT) & other claims.
•Preparation of various types of MIS reports for Top Management.
•Tender program preparations.

PROJECT ENGINEER في Synergy Property Development Services Pvt. Ltd
  • الهند
  • يوليو 2011 إلى أكتوبر 2012

Project: TCS Campus (Buildings, MEP, Finishes & Infrastructure)
Client: TCS
Contractor: L&T
Contract Value: USD 97 Million

Project Brief
Construction of buildings including MEP, finishes and infrastructure works for TCS campus.

RESPONSIBILITIES

•Site Management & co-ordination.
•Review / approve contractor's work program submissions
•Giving inputs in updating progress in Primavera 6 & MS Project.
•Monitor construction work schedules.
•Coordination with various service agencies of MEP & Fit-out.
•Site inspection with respect to IFC drawing & quality standards.

الخلفية التعليمية

ماجستير, Construction Technology and Management
  • في NITK
  • يونيو 2011
بكالوريوس, Civil Engineering
  • في College of Engineering
  • يونيو 2009

Specialties & Skills

Infrastructure
Civil Engineering
Scheduling
Planning
Primavera P6
CUSTOMER RELATIONS
MICROSOFT WORKS
PROGRESS
BRIDGES
BUDGET PREPARATION
CASH FLOW
CONSULTING
COST CONTROL
DECISION MAKING

اللغات

الانجليزية
متمرّس
الهندية
متمرّس