ALRAED ALMOUKDAD, Project Manager

ALRAED ALMOUKDAD

Project Manager

العراب

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, الإدارة الهندسية
Experience
23 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 3 Months

Project Manager at العراب
  • Saudi Arabia - Riyadh
  • My current job since August 2015
Senior Construction Manager at Drake and Scull com
  • Saudi Arabia - Mecca
  • March 2012 to May 2015

• Coordinate internal resources and third parties/vendors for the flawless execution of projects
• Ensure that all projects are delivered on-time, within scope and within budget
• Developing project scopes and objectives, involving all relevant stakeholders and ensuring technical feasibility
• Ensure resource availability and allocation
• Develop a detailed project plan to track progress.
• Use appropriate verification techniques to manage changes in project scope, schedule and costs
• Measure project performance using appropriate systems, tools and techniques
• . organizing the various professional people working on a project
• Carrying out risk assessment.
• making sure that all the aims of the project are met
• Making sure the quality standards are met.
• recruiting specialists and sub-contractors
• monitoring contractors to ensure guidelines are maintained
• Manage the relationship with the client and all stakeholders

Special Projects head at Suleiman Abdulaziz Alrajhi Est Al-Watania.
  • Saudi Arabia - Riyadh
  • November 2009 to February 2012

• Draw up the strategy of the business lines with higher management and owner’s needs.
• Draft a charter of concept design and criteria of requirements to trigger the RFPs for designers Engineering Offices, and Contractors
• Prepare initial RFPs and solicit for Tendering, pre-tender agenda, Tender meetings, pre-wards meetings, and kick off meeting with winners
• Analysis the offers presented by Bidders and negotiate with shortlisted ones
• Monitor and overlook the consultant who won in tender for the Owner’s Projects
• Monitor, supervise, and control the contractors for Owner’s Projects.
• Writing reports periodically about consultant and contractors.
• Detect all deviation in time and budget and deal with them duly.
• Solve problem may occurred during life of projects.
• Review and verify payments of services provides.
• Facilitate all obstacles been found in projects.
• Risk assessment to the projects.
• Ensure resource availability and allocation
• Attend meetings with Owner and other stakeholders
• Manage the Changes Orders and claims for contractors and reach up amicable settlement as much possible.
• Developing project scopes and objectives, involving all relevant stakeholders and ensuring technical feasibility

Senior Zone manager at شركة إ ب ب
  • Saudi Arabia - Riyadh
  • October 2006 to September 2009

• Determine and define project scope and objectives
• Predict resources needed to reach objectives and manage resources in an effective and efficient manner
• Prepare budget based on scope of work and resource requirements
• Track project costs in order to meet budget
• Develop and manage a detailed project schedule and work plan
• Provide project updates on a consistent basis to various stakeholders about strategy, adjustments, and progress
• Manage contracts with vendors and suppliers by assigning tasks and communicating expected deliverables
• Utilize industry best practices, techniques, and standards throughout entire project execution
• Monitor progress and make adjustments as needed
• Measure project performance to identify areas for improvement

Site Project Manager at BARIKANSON Sweden AB
  • Saudi Arabia - Riyadh
  • November 2004 to September 2006

• Plan and monitor all activities with regard to activities.
• Co-ordinate and integer all concerned parties to deliver all project deliverables.
• Follow up the subcontractors and

Project manager: sub contracting Rafal tower (76 floor ) as skeleton works \{285 million\}-
• Fast track project, I performed crashing activities and deliver my goal ahead the schedule.
• By Value Engineering, we saved cost and accelerating the construction.
Project Manager Military Hospital in Riyadh (renovation and construction) \{168 Million\}-
• To prepare initial Contract allowable budgets, revised Contract forecast and monthly Cost Reports.
• monitor the project and ensure their compliance with the contract management procedure.

Corporate Project Manager: at electronics hall at king Khalid airport\{16.5million\} siporex panels installation.

Project Manager at king fahd printing press in KFSC /Riyadh\{38 million SR\}

|: BARIKANSON Sweden at Hemnsho Co
  • Syria - Dara
  • December 2002 to September 2004

Design checks
Verification the drawings
Site supervisor engineer.

Project cooperated trainee Engineer at Project cooperated trainee Engineer
  • Germany - Dortmund
  • July 2000 to July 2002

Project cooperated trainee Engineer

Education

Bachelor's degree, الإدارة الهندسية
  • at جامعة دمشق
  • July 2000

Construction and project management, with optimization of leveling resource .

Specialties & Skills

Comprehensive Planning
Construction Law
Interior Design
Architectural Design
Analytical Skills
العصف الذهني
بناء الفريق و تحفيزه
حل المشكلات

Languages

Arabic
Native Speaker
English
Expert

Memberships

الهيئة السعودية للمهندسين
  • عضو محترف
  • June 2008
جمعية قانون البناء البريطانية
  • عضو مشارك
  • May 2016
جمعية عقود الفيديك العالمية
  • زميل
  • February 2014
المعهد العالمي لإدارة المشاريع الاحترافية
  • عضو محترف
  • March 2013
المعهد العالمي لممارسي مطالبات الإنشاء
  • زميل
  • April 2017

Training and Certifications

الإدارة و مهارات القايدة (Training)
Training Institute:
النورس للاستشارات
Date Attended:
May 2009
Duration:
38 hours
التخطيط الفعال وهارات الإشراف (Training)
Training Institute:
المتحدة
Date Attended:
March 2009
Duration:
35 hours

Hobbies

  • Reading