PIPING DESIGN ENGINEER
Keppel offshore and marine
Total years of experience :8 years, 7 Months
Project: GOLAR GIMMI FLNG (Floating liquefied natural gas )
• Piping routing in S3D.
• Piping in main deck area of Ship.
• Updating comments from production yard.
• Comment closure.
• MTO extraction, Weight CG report extraction, Preparation of customization list .
• Resolving design queries related from production yard.
• Interdisciplinary coordination for conflict resolution.
• Resolving clashes from clash report.
• Equipment arrangement and equipment VCD checking for piping .
• Support design and support modelling in S3D in Sponson area, aft utility area, maindeck area.
• Vendor drawing commenting as per layout requirement.
• Piping isometrics extraction and material take off.
• Delivery of IFC Isometrics.
• updating of layout drawings and section drawing.
• Updating stress comments.
Project :Dupont flowmo
• Resolving of 30% and 60% and 90% review comments .
• Equipment modeling of reactors, Heat Exchangers, Column, Pump, Tanks, Reboilers, tanks .
• Modeling of piping, Heat Exchanges, Pumps, Reboilers and Condensers.
Project:R125 AND P35 ( Chemical Plant Project)
• Resolving of 30% and 60% review comments .
• Equipment modeling of reactors, Heat Exchangers, Column, Pump, Tanks, Reboilers.
• Modeling of piping for Reactors, Heat Exchanges, Pumps, Reboilers and Condensers.
• updating of layout drawings and section drawing.
• Updating stress and checker comments
• Comment on vendor drawings as received.
• Isometric Extraction in plant 3D.
CAESAR II/CHEMCAD
•Prepared piping study on basis of P&ID and equipment layout.
•Preparation load cases.
• Responsible for isometric extraction from CAESAR II C2 files.
• Responsible for checking of modeling, process parameters, stress parameters.
• Performed nozzle load Calculations.
• Performed Flange leakage calculation.
• Performed support tagging on equipment drawings.
• Report generation of final systems.
• Final generation of stress report.
•Preparation of support sketch and type of support arrangement.
•Preparation of Input sketch for other discipline and vendors.
•Vendor drawing and other discipline drawing review.
•Checking Interference of Equipment 3D models, piping 3D models, etc. with using Smart Plant Review
Smart Plant 3D, Auto CAD
•Updating 30%, 60% & 90% model review comments.
•Design and detailing of piping systems .
•Modeling and Updation of equipments as per latest vendor drawing.
•Providing Piping loads for structures.
•Updating of stress lines as per stress mark up.
•Vendor drawing commenting as per layout requirement.
•Preparation of Nozzle orientation drawings.
•Piping isometrics extraction and material take off.
•Isometric Extraction in SP3D.
•Updating Stress & Checker Comments.
•Extraction of IFC Isometrics.
•Resolving IDF Errors.
SUBSTITUTE NATURAL GAS- J3 PROJECT
• Bachelor of Chemical Engineering (B.E) from VTU Belgaum Karnataka in Aug 2014 with First Class. • International project paper published on adsorption of dye in Arabian Journal for Science and Engineering • Secured 1st place in the state level collegiate power point presentation competition held on 9/9/2011 at G.S.S. College, Karnataka.