Sr. Construction Manager
Larsen & Toubro Ltd
Total years of experience :23 years, 7 Months
In- Charge for the execution of Under Ground Metro Station with all Structural, MEP till handover to Client and TBM Lining for 980 RM on either side of Metro Station.
to L&T SUCG JV (MTD)
for Independent Engineer services for Rehabilitation, Strengthening and 4- laning ofJammu - Udhampur section of NH-1A, from km 15.00 (on Jammu Bypass) to 67.00 on BOT(Annuity) basis in the State of Jammu & Kashmir.
The job involved construction supervision and design of 102.00Sqm cross section and 2.80KM length 4 no. twin bored tunnels using NATM for four lanes road project 65.00KM for Jammu to Udhampur section. The job responsibilities are review of tunnel designs, design development, Geotechnical investigation, preparation of monthly progress report of Tunnels, monthly progress review meeting, review of Feasibility Study report, review of method statements of shotcreting, Rock-bolting and tunnel excavation and regular co-ordination with NHAI and Concessionaire
TBM (EPB) for Delhi Metro Rail Project. The job involved construction supervision of 6.52 m diameter and 2.10Km underground bored tunnel using EPB shield TBM (Robbins) from Jorbagh station to Udyog Bhavan under consultancy of (PCI-PBI-JARTS-TONICHI-RITES). The job responsibilities of construction supervision of underground bored Tunnels and underground launching and receiving shafts. Liaise with site personnel to monitoring of tunnel activities and assist the technical queries related of TBM, and supports to provide spare parts from time to time as required. Liaise with site account, purchasing and document control departments for submission and receiving of Invoices, PO and Quotations and carryout monthly inventory check. Daily updating of all reports to Robbins Asia Pacific office, Hong Kong
Tunnel expert for construction of underground station and bored tunnels and Diaphragm wall for station shaft for Underground Delhi Metro Rail Corporation. The Contractors are JT METRO JV (Mitsubishi, Obyashi Corporation, Kazima Corporation & Yepi Markezi) and Soletanche Bachy. The job involved construction supervision of Underground double track railway bored tunnels 9.56m diameter and 3.50 Km length using Mitsubishi shield TBM in EPB system from Kashmere Gate to Rajiv Chowk Station and Underground station shaft of Rajiv Chowk station The job responsibilities involved design development, design review, quality inspection of station activities, review of Diaphragm wall design, method statements of Diaphragm wall and station excavation, bored tunnels including construction supervision of Diaphragm wall, underground station shaft and underground bored tunnels. Preparation of monthly progress report
CIVIL
The Job responsibilities include the Layout, Supervision, Costing and Construction of Heterogeneous Rock Fill Dam in the Rihand Reserviour at Anpara Dist. Sonebhadra (U.P) for their Anpara Thermal Power Project. The job contains construction of Rock fill dam of 1.6 K.M. Long with approved design with their Decantation Well, Spillway, Piling, Grouting and 7 km long 6.30 mtr. Dia. Water carrying tunnel with it’s CIFA gantry lining.
NATM with Alpine HCC JV for Airport Metro Express Line- C6 project cost INR3000 million for Delhi Metro Rail Project Corporation under consultancy of (PCI-PBI-JARTS-TONICHI-RITES) and Tunnel
for the Underground station 3F1
for underground bored tunnels for line 6 &7 for Delhi Metro Rail Corporation from Mandi House to Jama Masjid corridor including TBM launching shafts. The job responsibilities are review of construction drawings, review of method statements of TBM and review of progress reports. Regular site inspections related progress, quality and safety. Weekly site inspection at Casting yards, Mundka related quality of segments and safety. Regular coordination with Team Leader related quality and safety issues. Attending progress review meetings with DMRC and contractors