Ameer Humza, QA&QC Manager

Ameer Humza

QA&QC Manager

Doha Petroleum Construction Company

Lieu
Qatar - Doha
Éducation
Baccalauréat, Gas Engineering
Expérience
12 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 9 Mois

QA&QC Manager à Doha Petroleum Construction Company
  • Qatar - Doha
  • Je travaille ici depuis octobre 2019

Workring in EPIC & Plant Maintenance & Shutdown Division

Lead QA&QC Engineer à ZADCO
  • Émirats Arabes Unis - Abu Dhabi
  • mars 2015 à juillet 2017

Develop and Implement Project Quality Plan and Procedures.
Manage and conduct the material inspection process prior to client’s inspection.
Coordinate with sub con for inspection & testing of RT/PT/MT/UT
Supervise and co-ordinate more than 28 multi-discipline QA/QC team (Mechanical/Piping / welding/Coating) Four Island based projects.
Evaluate quality trends and alert serious system & process failure to responsible man-agement and reporting items of non-conformance to site management and PSM accord-ingly escalate, monitor, follow up and close out of NCR.
Audit implementation of contractor’s quality program on site by review contractor’s site quality audit schedule, monitor contractor’s site audit program, and witness/observe some selected site audits.
Supervise inspection of existing offshore platform facility, piping and equipment and re-view the deterioration mechanism and recommend mitigation/repair activities.
Conduct periodic Quality Walks on each site/Island to check Heavy Structural, Mechanical Installation, Piping, Modules, Equipment’s, Painting, and Preservation Quality Walk etc., along with site construction management and client
management.

Manager QA&QC / Inspection à Emirates National Oil Company
  • Émirats Arabes Unis - Dubaï
  • novembre 2015 à février 2016

Coordination with site construction team for furnace work
Preparing WPS as per scope of work
Supervise all documents regarding static equipment’s for final Dossier.
Review Method Statement and ensure the Quality Control aspects are considered
Ensuring all NDE activities according to the procedure
Manage the equipment calibration program
Turnaround maintenance job including modification of existing piping & Equipment’s
(525 No’s) Inspection & cleaning
Responsible to plan and arrange available manpower and equipment’s to meet the pro-ject Quality and schedule. Engineering inputs for site resolution and also provide required resources as per the requirements. Co-ordinate and team build-up with site engineering, safety and quality personnel resources and promote Quality and safety at site.

Quality Manager à FATIMA Fertilizer
  • Pakistan - Multan
  • mai 2015 à juillet 2015

Liaison with senior management regarding QA/QC matters
Inspection of Static equipments as per API 510
Ensuring all NDE activities according to the procedure
Preparing QIP for static equipments & Piping according to client’s specifications.
Prepare work front plan for the static & piping activity with execution team

In charge QA&QC (Static equipment's) à QATAR Petroleum
  • Qatar - Doha
  • mars 2015 à mai 2015

Preparing QIP, MS, PQR, WPS for submission to QP for approval
To follow the IAT system of QP
Prepare and conduct internal training programme prior to start of any activity.
Ensuring all NDE (RT, UT, PT, MT, IRIS) activities according to the procedure
To follow up with my team for Box-up & Reinstatement activities
Manage and conduct the material inspection process prior to client’s inspection.
To submit final dossiers/documents to FMI.
Coordinating with ASME inspector to replace the bottom shell course of Reactor.
Supervise company plant inspector/NDT inspectors and Mechanical inspectors to carry out inspection as per API 570, 510 and 653 requirements.

Lead QA&QC à QATAR Chemicals
  • Qatar - Doha
  • janvier 2015 à mars 2015

Preparing QIP & MS for submission to client w.r.t project
To follow the RFI protocol to proceed the Inspection
Conduct internal audit for QMS compliance
To inspect the vessels & columns as per work pack at QChem site.
Internal and external inspection of various columns, S&T Exchangers, horizontal & verti-cal vessels, Fin Fan, piping and recommend repair and follow up/ box up.
Coordinate issues with site Construction manager, Technical engineer, DC, QA&QC & Procurement
Supervise company/ 3rd party plant inspector/NDT inspectors and Mechanical inspectors to carry out integrity inspection of the facility during Turn around, which includes UT thickness inspection of piping, vessels & tanks as per API 570/ 510 and 653 require-ments. Including QA/QC supervision and NDT inspection (UT, MPI, DPI) of new fabrica-tion and installation

In charge QA&QC & Inspection à Pakistan Refinery
  • Pakistan - Karachi
  • septembre 2014 à décembre 2014

Supervise Quality Control department of including contractors & vendors.
Coordinate with head office marketing department for material clearance, purchasing order.
Ensure proper certifications are in place for production purposes.
Inspection of incoming material, online inspection (Shop floor).
Inspection during PQT (Process Qualification test) Operational activities / regular inspection
Check the in house calibration/verification of the instruments of quality control & Lab testing equipment’s.
Inspect Plant stationary equipment’s by entering into vessels, towers, columns, heat ex-changer during shutdowns/Turn around, to check the internal condition of equipment’s. Make interpretations of findings, analysis failure, prepare report according to API code and recommended practices

Lead Inspection Engineer à QATAR Petrochemical
  • Qatar - Doha
  • février 2014 à mars 2014

Preparing QIP, MS, PQR, WPS for submission to QP for approval
To follow the IAT system of QP
Prepare and conduct internal training programme prior to start of any activity.
Ensuring all NDE (RT, UT, PT, MT, IRIS) activities according to the procedure
To follow up with my team for Box-up & Reinstatement activities
Manage and conduct the material inspection process prior to client’s inspection.
To submit final dossiers/documents to FMI.
Coordinating with ASME inspector to replace the bottom shell course of Reactor.
Lead and supervise inspection team to carry out QA/QC activities on various locations in QP which includes new facility expansion project and brown field area
Confirm that procurement procured materials is traceable and properly stacked and pre-served at site.

In charge QA&QC à UCH Gas
  • Pakistan - Karachi
  • octobre 2013 à décembre 2013

Inspection of Amine Stripper as per client scope & API 510
Inspection of Static equipments (Heat Exchanger, Vessels, Columns, re boiler)
Inspection of mechanical Valves
Liaison with senior management regarding QA/QC matters
Assess sub-contractor implementing the requirements of approved QCP and ITP inspec-tion intervention points and reports are maintained.
To attend Hydro test & soap filling test of static equipment’s
To follow up with my team for Box-up & Reinstatement activities.

In charge QA&QC à OMV
  • Pakistan - Karachi
  • mai 2013 à septembre 2013

Follow the PTW system & HSSE as per OMV standard
Set up the project logs and system for recording all the performed testing.
Ensure that all the QA/QC records are in place and traceability of documents is feasible.
Monitor all QA/QC & Inspection activities regarding Slug Catcher (Welding & NDE)
Manage the equipment calibration programme
Making MS regarding, welding procedure, repair procedure, PWHT, NDE & hydro test
Monitor the fabrication & erection of Slug Catcher (API 5L PSL-2- X60) material of 48” OD 41mm wt.

QA&QC Engineer à ENGRO Fertilizer
  • Pakistan - Karachi
  • mars 2013 à avril 2013

Check NDE of column, heat exchanger, Drums, Vessels & their parts
To attend Box-Up activity of all static equipment’s (Pressure vessel, Column, Heat exchang-er)
To attend Hydro test & soap filling test of static equipment’s
Internal and external inspection of various columns, S& T Exchangers, horizontal & vertical vessels, strainers and piping and recommend repair and follow up/ box

Incharge QA&QC & Execution à PPL Adhi Gas Field
  • Pakistan - Rawalpindi
  • août 2012 à mars 2013

Monitoring all QA/QC & project activity & daily meeting with my team.
To review QC dossiers after completion of work.
To compile all quality documents for QC dossiers and final handover to PPL
Preparation of PQR/WPS and conduction welder qualification test at site
Inspection of incoming material, online inspection (Shop floor).
Inspection during PQT (Process Qualification test) Operational activities / regular inspection
Check the in house calibration/verification of the instruments of quality control & Lab testing equipment’s.
Responsible to ensure that Reject/Rework data is given to Planning for analysis, costing and record.
Inspect Plant stationary equipment’s by entering into vessels, towers, columns, heat ex-changer during shutdowns/Turn around, to check the internal condition of equipment’s. Make interpretations of findings, analysis failure, prepare report according to API code and recommended practices
Involved in inspection of foundation of Boiler supporting structure, pressure part inspection, ducting fan, boiler tubes, and burners according to the company stage inspection wise.

Refurbishment Lead Engineer - Mechanical à BYCO Oil Refinery
  • Pakistan - Karachi
  • mai 2010 à août 2012

Preparing ITP for static equipment’s & Piping according to client’s specifications.
Conducting inspections as per ITP and offering inspection to client’s inspection Engineer.
Preparing Work Instructions and Method Statements as required.
Liaison with senior management regarding QA/QC matters.
Developing training modules for QA/QC Department.
Responsible for reviewing the project specification and preparation of Inspection Test Plans
Preparing all QA/QC documentation and inspection reports for submission to client.
Conducts periodic internal Quality Audit of project activities.
Preparing punch list after completion of Static & Piping activities.
Involved in Pre-commissioning activities like reinstatement, flushing etc.
Prepare work front plan for the static & piping activity
Inspection according to Milford Haven Refinery isometric piping &static equipment’s details.
Inspection of incoming material of piping & static equipment’s.
Attend PQR & making WPS
Maintain all documents regarding static equipment’s for final Dossier.
Visit the KMW at Karachi for inspection of heat exchanger parts.
Inspection of crude column & its parts as per API 510
Attend WQT & making welder cards as per ASME Sec IX
To attend Hydro test & soap filling test of static equipment’s
To follow up with my team for Box-up & Reinstatement activity.
Use Asset Master Software (UK based) to check spool no’s & connections as per P&ID & Isometric

QA&QC Engineer à Engro Fertilizer
  • Pakistan - Karachi
  • janvier 2009 à janvier 2010

To Inspect Piping activity accordance to MS & Client’s specifications.
Responsible for ensuring all NDE activities according to the procedure.
Inspection according to Snamprogetti’s isometric piping details.
Inspection the joints of hairpins & pigtails as well as furnace & waste heat boiler.
Lines walk down & prepare construction punch list.
Carry out Spool handling, Hydro testing, Pneumatic Testing and other testing methods as per method statements and project specifications
Responsible to ensure that Reject/Rework data is given to Planning for analysis, costing and record.
Preparing & overall monitoring of the Test Packs
Line walking and punch listing of RMC (Ready for Mechanical Completion) test packs of pip-ing and verification inspection of punch killing

QA&QC Engineer à Fauji Fertilizer
  • Pakistan - Karachi
  • octobre 2008 à décembre 2008

To learn about QHSE protocol
Cutting/Installation/Welding of Furnace pigtail tubes
Replacement of Urea Stripper & Ejector
To learn about ASME standards/Codes
To follow senior instructions regarding QA&QC activities
To attend hydro test activities of Heat exchangers
To attend Box-Up activity of all static equipment’s (Pressure vessel, Column, Heat exchang-er)
To attend Hydro test & soap filling test of static equipment’s

Éducation

Baccalauréat, Gas Engineering
  • à UET Lahore
  • octobre 2008

Motivate the Personnel. Best Compere in Descon functions & sports. President of blood donor society in University. Worked as an internee in FFC Mirpur Mathelo in 2007

Specialties & Skills

Inspection
Commissioning
Refinery
Refurbishment
Documentation
Process Improvement
Open Communication
Team Building & Leadership
Planning
Quality Assurance
Welding
Quality Engineering
Quality Auditing

Langues

Anglais
Expert
Hindi
Expert
Urdu
Expert
Punjabi
Expert

Adhésions

Pakistan Engineering council
  • Engineer
  • December 2010

Formation et Diplômes

API 510 (Certificat)
Date de la formation:
June 2014
Valide jusqu'à:
December 2023
ISO 9001:2008 (Certificat)
Date de la formation:
February 2014
Valide jusqu'à:
February 2024

Loisirs

  • Playing Ping Pong, Travelling, Cooking, adopt New technology