أمير Humza, QA&QC Manager

أمير Humza

QA&QC Manager

Doha Petroleum Construction Company

البلد
قطر - الدوحة
التعليم
بكالوريوس, Gas Engineering
الخبرات
12 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 9 أشهر

QA&QC Manager في Doha Petroleum Construction Company
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ أكتوبر 2019

Workring in EPIC & Plant Maintenance & Shutdown Division

Lead QA&QC Engineer في ZADCO
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2015 إلى يوليو 2017

Develop and Implement Project Quality Plan and Procedures.
Manage and conduct the material inspection process prior to client’s inspection.
Coordinate with sub con for inspection & testing of RT/PT/MT/UT
Supervise and co-ordinate more than 28 multi-discipline QA/QC team (Mechanical/Piping / welding/Coating) Four Island based projects.
Evaluate quality trends and alert serious system & process failure to responsible man-agement and reporting items of non-conformance to site management and PSM accord-ingly escalate, monitor, follow up and close out of NCR.
Audit implementation of contractor’s quality program on site by review contractor’s site quality audit schedule, monitor contractor’s site audit program, and witness/observe some selected site audits.
Supervise inspection of existing offshore platform facility, piping and equipment and re-view the deterioration mechanism and recommend mitigation/repair activities.
Conduct periodic Quality Walks on each site/Island to check Heavy Structural, Mechanical Installation, Piping, Modules, Equipment’s, Painting, and Preservation Quality Walk etc., along with site construction management and client
management.

Manager QA&QC / Inspection في Emirates National Oil Company
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2015 إلى فبراير 2016

Coordination with site construction team for furnace work
Preparing WPS as per scope of work
Supervise all documents regarding static equipment’s for final Dossier.
Review Method Statement and ensure the Quality Control aspects are considered
Ensuring all NDE activities according to the procedure
Manage the equipment calibration program
Turnaround maintenance job including modification of existing piping & Equipment’s
(525 No’s) Inspection & cleaning
Responsible to plan and arrange available manpower and equipment’s to meet the pro-ject Quality and schedule. Engineering inputs for site resolution and also provide required resources as per the requirements. Co-ordinate and team build-up with site engineering, safety and quality personnel resources and promote Quality and safety at site.

Quality Manager في FATIMA Fertilizer
  • باكستان - ملتان
  • مايو 2015 إلى يوليو 2015

Liaison with senior management regarding QA/QC matters
Inspection of Static equipments as per API 510
Ensuring all NDE activities according to the procedure
Preparing QIP for static equipments & Piping according to client’s specifications.
Prepare work front plan for the static & piping activity with execution team

In charge QA&QC (Static equipment's) في QATAR Petroleum
  • قطر - الدوحة
  • مارس 2015 إلى مايو 2015

Preparing QIP, MS, PQR, WPS for submission to QP for approval
To follow the IAT system of QP
Prepare and conduct internal training programme prior to start of any activity.
Ensuring all NDE (RT, UT, PT, MT, IRIS) activities according to the procedure
To follow up with my team for Box-up & Reinstatement activities
Manage and conduct the material inspection process prior to client’s inspection.
To submit final dossiers/documents to FMI.
Coordinating with ASME inspector to replace the bottom shell course of Reactor.
Supervise company plant inspector/NDT inspectors and Mechanical inspectors to carry out inspection as per API 570, 510 and 653 requirements.

Lead QA&QC في QATAR Chemicals
  • قطر - الدوحة
  • يناير 2015 إلى مارس 2015

Preparing QIP & MS for submission to client w.r.t project
To follow the RFI protocol to proceed the Inspection
Conduct internal audit for QMS compliance
To inspect the vessels & columns as per work pack at QChem site.
Internal and external inspection of various columns, S&T Exchangers, horizontal & verti-cal vessels, Fin Fan, piping and recommend repair and follow up/ box up.
Coordinate issues with site Construction manager, Technical engineer, DC, QA&QC & Procurement
Supervise company/ 3rd party plant inspector/NDT inspectors and Mechanical inspectors to carry out integrity inspection of the facility during Turn around, which includes UT thickness inspection of piping, vessels & tanks as per API 570/ 510 and 653 require-ments. Including QA/QC supervision and NDT inspection (UT, MPI, DPI) of new fabrica-tion and installation

In charge QA&QC & Inspection في Pakistan Refinery
  • باكستان - كراتشي
  • سبتمبر 2014 إلى ديسمبر 2014

Supervise Quality Control department of including contractors & vendors.
Coordinate with head office marketing department for material clearance, purchasing order.
Ensure proper certifications are in place for production purposes.
Inspection of incoming material, online inspection (Shop floor).
Inspection during PQT (Process Qualification test) Operational activities / regular inspection
Check the in house calibration/verification of the instruments of quality control & Lab testing equipment’s.
Inspect Plant stationary equipment’s by entering into vessels, towers, columns, heat ex-changer during shutdowns/Turn around, to check the internal condition of equipment’s. Make interpretations of findings, analysis failure, prepare report according to API code and recommended practices

Lead Inspection Engineer في QATAR Petrochemical
  • قطر - الدوحة
  • فبراير 2014 إلى مارس 2014

Preparing QIP, MS, PQR, WPS for submission to QP for approval
To follow the IAT system of QP
Prepare and conduct internal training programme prior to start of any activity.
Ensuring all NDE (RT, UT, PT, MT, IRIS) activities according to the procedure
To follow up with my team for Box-up & Reinstatement activities
Manage and conduct the material inspection process prior to client’s inspection.
To submit final dossiers/documents to FMI.
Coordinating with ASME inspector to replace the bottom shell course of Reactor.
Lead and supervise inspection team to carry out QA/QC activities on various locations in QP which includes new facility expansion project and brown field area
Confirm that procurement procured materials is traceable and properly stacked and pre-served at site.

In charge QA&QC في UCH Gas
  • باكستان - كراتشي
  • أكتوبر 2013 إلى ديسمبر 2013

Inspection of Amine Stripper as per client scope & API 510
Inspection of Static equipments (Heat Exchanger, Vessels, Columns, re boiler)
Inspection of mechanical Valves
Liaison with senior management regarding QA/QC matters
Assess sub-contractor implementing the requirements of approved QCP and ITP inspec-tion intervention points and reports are maintained.
To attend Hydro test & soap filling test of static equipment’s
To follow up with my team for Box-up & Reinstatement activities.

In charge QA&QC في OMV
  • باكستان - كراتشي
  • مايو 2013 إلى سبتمبر 2013

Follow the PTW system & HSSE as per OMV standard
Set up the project logs and system for recording all the performed testing.
Ensure that all the QA/QC records are in place and traceability of documents is feasible.
Monitor all QA/QC & Inspection activities regarding Slug Catcher (Welding & NDE)
Manage the equipment calibration programme
Making MS regarding, welding procedure, repair procedure, PWHT, NDE & hydro test
Monitor the fabrication & erection of Slug Catcher (API 5L PSL-2- X60) material of 48” OD 41mm wt.

QA&QC Engineer في ENGRO Fertilizer
  • باكستان - كراتشي
  • مارس 2013 إلى أبريل 2013

Check NDE of column, heat exchanger, Drums, Vessels & their parts
To attend Box-Up activity of all static equipment’s (Pressure vessel, Column, Heat exchang-er)
To attend Hydro test & soap filling test of static equipment’s
Internal and external inspection of various columns, S& T Exchangers, horizontal & vertical vessels, strainers and piping and recommend repair and follow up/ box

Incharge QA&QC & Execution في PPL Adhi Gas Field
  • باكستان - روالبندي
  • أغسطس 2012 إلى مارس 2013

Monitoring all QA/QC & project activity & daily meeting with my team.
To review QC dossiers after completion of work.
To compile all quality documents for QC dossiers and final handover to PPL
Preparation of PQR/WPS and conduction welder qualification test at site
Inspection of incoming material, online inspection (Shop floor).
Inspection during PQT (Process Qualification test) Operational activities / regular inspection
Check the in house calibration/verification of the instruments of quality control & Lab testing equipment’s.
Responsible to ensure that Reject/Rework data is given to Planning for analysis, costing and record.
Inspect Plant stationary equipment’s by entering into vessels, towers, columns, heat ex-changer during shutdowns/Turn around, to check the internal condition of equipment’s. Make interpretations of findings, analysis failure, prepare report according to API code and recommended practices
Involved in inspection of foundation of Boiler supporting structure, pressure part inspection, ducting fan, boiler tubes, and burners according to the company stage inspection wise.

Refurbishment Lead Engineer - Mechanical في BYCO Oil Refinery
  • باكستان - كراتشي
  • مايو 2010 إلى أغسطس 2012

Preparing ITP for static equipment’s & Piping according to client’s specifications.
Conducting inspections as per ITP and offering inspection to client’s inspection Engineer.
Preparing Work Instructions and Method Statements as required.
Liaison with senior management regarding QA/QC matters.
Developing training modules for QA/QC Department.
Responsible for reviewing the project specification and preparation of Inspection Test Plans
Preparing all QA/QC documentation and inspection reports for submission to client.
Conducts periodic internal Quality Audit of project activities.
Preparing punch list after completion of Static & Piping activities.
Involved in Pre-commissioning activities like reinstatement, flushing etc.
Prepare work front plan for the static & piping activity
Inspection according to Milford Haven Refinery isometric piping &static equipment’s details.
Inspection of incoming material of piping & static equipment’s.
Attend PQR & making WPS
Maintain all documents regarding static equipment’s for final Dossier.
Visit the KMW at Karachi for inspection of heat exchanger parts.
Inspection of crude column & its parts as per API 510
Attend WQT & making welder cards as per ASME Sec IX
To attend Hydro test & soap filling test of static equipment’s
To follow up with my team for Box-up & Reinstatement activity.
Use Asset Master Software (UK based) to check spool no’s & connections as per P&ID & Isometric

QA&QC Engineer في Engro Fertilizer
  • باكستان - كراتشي
  • يناير 2009 إلى يناير 2010

To Inspect Piping activity accordance to MS & Client’s specifications.
Responsible for ensuring all NDE activities according to the procedure.
Inspection according to Snamprogetti’s isometric piping details.
Inspection the joints of hairpins & pigtails as well as furnace & waste heat boiler.
Lines walk down & prepare construction punch list.
Carry out Spool handling, Hydro testing, Pneumatic Testing and other testing methods as per method statements and project specifications
Responsible to ensure that Reject/Rework data is given to Planning for analysis, costing and record.
Preparing & overall monitoring of the Test Packs
Line walking and punch listing of RMC (Ready for Mechanical Completion) test packs of pip-ing and verification inspection of punch killing

QA&QC Engineer في Fauji Fertilizer
  • باكستان - كراتشي
  • أكتوبر 2008 إلى ديسمبر 2008

To learn about QHSE protocol
Cutting/Installation/Welding of Furnace pigtail tubes
Replacement of Urea Stripper & Ejector
To learn about ASME standards/Codes
To follow senior instructions regarding QA&QC activities
To attend hydro test activities of Heat exchangers
To attend Box-Up activity of all static equipment’s (Pressure vessel, Column, Heat exchang-er)
To attend Hydro test & soap filling test of static equipment’s

الخلفية التعليمية

بكالوريوس, Gas Engineering
  • في UET Lahore
  • أكتوبر 2008

Motivate the Personnel. Best Compere in Descon functions & sports. President of blood donor society in University. Worked as an internee in FFC Mirpur Mathelo in 2007

Specialties & Skills

Inspection
Commissioning
Refinery
Refurbishment
Documentation
Process Improvement
Open Communication
Team Building & Leadership
Planning
Quality Assurance
Welding
Quality Engineering
Quality Auditing

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس
البنجابية
متمرّس

العضويات

Pakistan Engineering council
  • Engineer
  • December 2010

التدريب و الشهادات

API 510 (الشهادة)
تاريخ الدورة:
June 2014
صالحة لغاية:
December 2023
ISO 9001:2008 (الشهادة)
تاريخ الدورة:
February 2014
صالحة لغاية:
February 2024

الهوايات

  • Playing Ping Pong, Travelling, Cooking, adopt New technology