عامر الموسى, Construction Manager

عامر الموسى

Construction Manager

Arabian International Company

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Mechanical Engineering Technician
الخبرات
18 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 6 أشهر

Construction Manager في Arabian International Company
  • المملكة العربية السعودية - الخبر
  • أشغل هذه الوظيفة منذ مايو 2021

Erection of SWCC 5 Tanks incloding Dia Up 106 Mtr with Aluminum dome roof

Construction Manager في Arabian International Company
  • المملكة العربية السعودية - ضبا
  • أكتوبر 2020 إلى أبريل 2021

Erection of SWCC 2 Tanks incloding Dia Up 45 Mtr with Aluminum dome roof

Construction Manager /Site In charge at Power Plant - PP12 Riyadh, KSA في HIDADA
  • المملكة العربية السعودية - الرياض
  • فبراير 2019 إلى سبتمبر 2020

Erection of Demi tank water of 30 meters DIA with a jacking system.

Power Plant 12 Project - PP12 Riyadh, KSA
1. Overall Site In Charge From Mechanical to Civil Works.
2. Managing and Leading the Team For Safe and Productive Work Site
3. Supervise the Team To Gain The Project Target Schedule
4. Building High-Quality Standards In The Project.
5. Motivating the prospective Members of the team.
6. Giving High Scholastic Standards to client
7. Following All Standards In Erection And Installation Of Equipment.
8. Planning activities for site work
9. Attends management meetings for giving solutions on open issues
10. Assures project target date be accomplished accordingly

Construction Manager / Site In charge at في Power Plant 13 Project - PP13 Riyadh, KSA
  • المملكة العربية السعودية - الرياض
  • نوفمبر 2016 إلى يناير 2019

Erection activities for steel structural 17000 tons of columns, rafters, crane girders, beams, side girts, Cladding Installation Works, as per the erection schedule and contractual scope.

Power Plant 13 Project - PP13 Riyadh, KSA
1. Overall Site In Charge From Mechanical to Civil Works.
2. Managing and Leading the Team For Safe and Productive Work Site
3. Supervise the Team To Gain The Project Target Schedule
4. Building High-Quality Standards In The Project.
5. Motivating the prospective Members of the team.
6. Giving High Scholastic Standards to client
7. Following All Standards In Erection And Installation Of Equipment.
8. Planning activities for site work
9. Attends management meetings for giving solutions on open issues
10. Assures project target date be accomplished accordingly

Construction Manager/ Site In charge RABIGH PHASE II PETROCHEMICAL PROJECT في Hidada Contracting Company Ltd.
  • المملكة العربية السعودية - رابغ
  • أكتوبر 2014 إلى أكتوبر 2016

Erection of 14 SS.Tanks including Dia Up to 61 meters and 10-meter S.S ( Cone Roof Column Supported / Dome Roof Self Supported / Internal Floating Roof)

Project: RABIGH PHASE II PETROCHEMICAL PROJECT
1. Overall Site In Charge From Mechanical to Civil Works.
2. Managing and Leading the Team For Safe and Productive Work Site
3. Supervise the Team To Gain The Project Target Schedule
4. Building High-Quality Standards In The Project.
5. Motivating the prospective Members of the team.
6. Giving High Scholastic Standards to client
7. Following All Standards In Erection And Installation Of Equipment.

Site Engineer/ Site In Charge في HIDADA CONTRACTING COMPANY LTD
  • المملكة العربية السعودية - ينبع
  • مايو 2013 إلى سبتمبر 2014

Erection and installation of structural steel materials and silo assembly and fabrication for Plants that will provide gypsum powder with machinery.


1. Overall Site In Charge From Mechanical to Civil Works.
2. Managing and Leading the Team For Safe and Productive Work Site
3. Supervise the Team To Gain The Project Target Schedule
4. Building High-Quality Standards In The Project.
5. Motivating the prospective Members of the team.
6. Giving High Scholastic Standards to client
7. Following All Standards In Erection And Installation Of Equipment.

Site Engineer / Site In-Charge في HIDADA CONTRACTING COMPANY
  • المملكة العربية السعودية - ينبع
  • يناير 2013 إلى أبريل 2014

Erection and installation of structural steel materials and silo assembly and fabrication for 2 plants that will provide gypsum powder.
In charge of the providing workers what ever is needed for the Attend weekly meetings with clients and subcontractor regarding . site activities and progress.
Submit reports to main office for records and references.
Attend monthly coordination meeting with other site managers and in-charge for project ideas on more productivity.

Site Engineer في Hidada contracting co .Ltd
  • المملكة العربية السعودية - الخرج
  • أبريل 2012 إلى أبريل 2013

Erection of Steel Structure, Dryer machinery, Rail Installation, Silo tanks, Kiln refractory machinery, rail cars, concrete casting of foundations. apart from controlling of manpower, efficiency and their moilization.

Site Engineer في Hidada Contracting Company Ltd.
  • المملكة العربية السعودية - ينبع
  • يوليو 2011 إلى مارس 2012

Site engineer for installation of machinery, erection of silo tanks and steel structure and ducts, dryer, belt conveyors, knife machines

Site Engineer في Doosan Ltd
  • المملكة العربية السعودية
  • فبراير 2011 إلى يونيو 2011

Erection of 8 storage tanks of 80 metres DIA and Structural erection and Oil pipeline

Site Engineer في Petro Rabigh
  • المملكة العربية السعودية - جدة
  • سبتمبر 2010 إلى يناير 2011

Erection and installation of Storage tank and pipelines for oil and gas . Planning and controlling of all works and workers.

Site Engineer في Hidada Company Ltd.
  • المملكة العربية السعودية - ينبع
  • يناير 2010 إلى أغسطس 2010

Project : Erection of complete Gypsum Powder Plant including Crushing, Grinding, Calcining and Bagging Plant along with related Mechanical, Structure, Insulation and Piping work .

Site Engineer في NCC Rabigh Power Plant extension
  • المملكة العربية السعودية - جدة
  • يناير 2008 إلى يناير 2009

Project : Erection of Twelve Tanks including Dia Up to 61 meter Carbon Steel and Dia Up to 10 meter S.S ( Cone Roof Column Supported / Dome Roof Self Supported / Internal Floating Roof)

Site Engineer في Aramco ( Khurais KSA)
  • المملكة العربية السعودية - الشرقية
  • يناير 2007 إلى يناير 2008

Project : Erection of Eighteen Tanks including Dia 36 meter Carbon Steel Doom Roof and Cone Roofs Self Supported

Site Engineer في Khurasaniya Aramco ( Khurasiniya KSA)
  • المملكة العربية السعودية - الشرقية
  • يناير 2006 إلى يناير 2007

Project : Erection of Thirteen Tanks Different Types Of Roofs Self Supported Cone and Dome, External Floating

Site Engineer في Aramco ( Duba and Tabuk KSA)
  • المملكة العربية السعودية - تبوك
  • يناير 2005 إلى يناير 2006

Project : Erection of Three Tanks Dia 31 meter Carbon Steel External Floating Roof

الخلفية التعليمية

بكالوريوس, Mechanical Engineering Technician
  • في Engineering Technical Institute
  • سبتمبر 2004

Mechanical Engineering Technician

Specialties & Skills

Project Work
General Construction
Site Engineer

اللغات

العربية
متمرّس
الانجليزية
متمرّس