MEP Construction Manager / MEP Coordinator
Al Futtaim Carillion,
مجموع سنوات الخبرة :18 years, 5 أشهر
-MEP Construction Manager for the two floors of VIP Patient Rooms, Cleveland Clinic
(Al Mafraq Hospital): started on Aug 2012 to Jan 2013,
-MEP Coordinator with Architectural work, Sr. Electrical Engineer for Electrical Installation and layout design
-Structured Cabling (Design & Installation), as per (SYSTIMAX, ND3361).
(Al Bustan Mix Used Complex): started on Oct 2009 till Aug 2012
-Coordination of engineering issues (resolves and follows up).
-Coordinator - MEP provision sums (Hotel kitchens and restaurants)-(garbage shoot and compactor system).
-ELV systems package manager (car park system, CCTV and access control system) (structured cabling).
-Drawings reviewing, MEP issues proposing and MEP installation solutions.
-Electrical inspector, Electrical Engineer for Electrical Work Installation.
-MEP coordinator to ensure services installed properly as of the approved coordinated drawings, resolve and get approved.
(Al Sa’deyyat Island Project): period of work included in total employment period
-Electrical Engineer for project mobilization & temporary services.
-Leading emergency team.
(In Head Office): started on Jan 2007 to Jan 2008
-Junior Elect. Eng, worked as one of the tendering team as of Quantity Surveyor, defining related scope, analyzing of project requirements.
(In Project’s sites): Discontinued of two years
-Electrical work supervision and installation in pump station projects in Gantoot, Sih Sdeira, and Al Jarf.
-Electrical work supervision and installation in different places of Oil Fields such Takreer, Borouge and ADCO/ for projects of Wash Oil Tank Borouge, Snamprojetti’s subcontractor in ADCO Factory.