Deputy Manager (Electrical, O&M)
ACB (Inida) Ltd.
Total years of experience :15 years, 9 Months
1. Operation:- Turbine desk operation and field inspection
2. Survey Work: - 400 KV & 132 KV transmission line survey work
3. Civil Work: - Supervision of 400 KV & 132 KV switchyard & transmission line, boiler and TG building & TG Deck foundations works
4. Erection: -
a. Generator stator installation, rotor insertion
b. 400 KV and 132 KV switchyard equipment, structure and tower erection
5. Testing & Commissioning:
a. 135 MW Generator testing
b. 6.6 KV switchgear breaker Timing, CRM & IR testing
c. MICOM- Relay testing
d. 11/0.440 KV 750 KVA transformer installation, VCB & relay testing, and commissioning
e. 400 KV and 132 KV Breaker Timing & CRM testing, CT- IR & WR test
f. CHP 6.6 KV MCC and 415 Volt PMCC panels and drives testing
g. 200 MVA ICT installations, testing & commissioning
h. 2X500 KVA DG Installation, testing, commissioning and operation
1. Civil work supervision
2. Electrical work supervision.
3. 400 & 132 KV switchyard maintenance.
4. 6.6 KV PMCC O&M.
Of 2x135 MW CFBC Boiler power plant.
• Dy. Manager (Electrical) at 2x135 MW Thermal Power Plant of Aryan Coal Benefication (India) Ltd.