Asset Managment Expert
Qatar Railway company
Total years of experience :23 years, 3 Months
• Led weekly FRACAS Review Meetings, oversaw PCR data backlog, and ensured quality in Metro and Tram FRACAS Registers. Coordinated activities with maintenance contractors during this process.
• Reviewed and validated updates to FRACAS & Defect registers, aligning with the Asset Management plan (standard & Quality)
• Provided valuable inputs to the budget team and assessed Method Statements and Asset Management improvement plans based on lessons learned
• Collaborated with service providers to develop interface Civil & FM solutions, optimizing maintenance and construction processes
• Collaborated with project managers to identify potential interface issues and proactively implemented solutions.
• Overall in charge and providing required guidance on inspecting various civil assets, such as tunnels, stations (Under Ground, at-grade, and elevated), emergency exits, cross passages, drainage systems, utility pits, equipment rooms, tracks, and trackside drainages.
• Generated regular reports on interface progress, issues, and resolutions for project leadership and stakeholders.
• Led stakeholder interactions for Third-party construction & maintenance in Station area planning (SAP) & Railway protection Zone (RPZ), conducting dilapidation surveys near QR assets. Ensured compliance with permits to protect railway operations & assets.
• In Railway protection Zone, cross-verified third-party Permit to Work (PTW) applications, ensuring railway asset & operational safety
• Oversee all aspects of project construction management, including tunnels, stations, emergency exits, drainage, utility pits, and tracks. Review initial technical documents and ensure project completion from start to handover.
• Participating in weekly contractor meetings, bi-weekly real estate meetings, and regular interface sessions with clients and stakeholders to ensure project timelines
• Overseeing site construction in line with QCS 2010 & QCS 2014, addressing delays and discussing mitigation plans with the contractor.
• Reviewing diverse reports on monthly surveillance, progress, and weekly updates; observation logs, STKID reports, weekly MEP progress, weekly Arch. Progress (FIT OUT elements i.e. ACP panel, GRP panel, interior walls, plastering, electrical lightings, terrazzo flooring with decorations, decorative AC grills, mechanical make up grills, hexagonal stone walls including tiles, mosaic, decorative panels/meshirabia, decorative partitions/doors, paints, platform screen door, shelter glass panels with its steel structures, platform cubicles with eliminated signage, fire curtains and QCDD approval schedules.
• Assisting PM in reviewing technical documents, including Design, MES (Method Statement), ITP (Inspection and Test Plan), HSSE, QAQC plans, and risk assessments.
• Supervising diverse underground metro construction, ensuring methodical progress through TBM (Tunnel Boring Machine) and precast segment work. Managing station and crossover construction with detailed inspections, while addressing weekly project issues in client and contractor meetings.
• Compiling diverse reports, including monthly surveillance, progress narratives, weekly delay, manpower, MEP progress, and architectural progress (FIT OUT elements), such as ACP (Aluminum Cladding Panel) panels, GRP (Glass Reinforced Panel) panels, interior walls, electrical, flooring, decorative features, and more.
• Reviewed and interpreted contract documents, including drawings, specifications, and project manuals.
• Compiled and presented weekly reports and environmental impact statements to inform stakeholders, municipal officials and members of public about planned civil projects.
• Underground metro all construction activities (by TBM)/UG precast segment construction supervision/In Station & cross-over construction activities by bottom-up and top-down methods, cut n cover method work etc. detailed work inspection and progress monitoring with the work program. Meeting with clients and contractors for weekly project issues.
• Underground metro all construction activities (by TBM)/UG precast segment construction supervision/In Station & cross-over construction activities by bottom-up and top-down methods, cut n cover method work etc. detailed work inspection and progress monitoring with the work program. Meeting with clients and contractors for weekly project issues.
• Depot building and infrastructures development activities.
• Relocation of the existing substation.
• Preparing various reports like monthly surveillance, monthly progress (narrative), weekly delay, weekly manpower, weekly MEP progress, weekly Arch. Progress (FIT OUT elements i.e. ACP panel, GRP panel, interior walls, plastering, electrical lightings, terrazzo flooring with decorations, decorative AC grills, mechanical make up grills, hexagonal stone walls including tiles, mosaic, decorative panels/meshirabia, decorative partitions/doors, paints, platform screen door, shelter glass panels with its steel structures, platform cubicles with eliminated signage, fire curtains etc.
• Directed site activities to drive smooth operations and achieve quality assurance metrics.
• Employed cost management techniques to maintain budget and increase revenue.
• Held regular one-on-one meetings with employees to review performance and priorities and provide feedback.
• Recruited and trained new employees to meet job requirements.
• Managed site operations, tracked progress, identified delays, and prepared concise reports for head office submissions and consultant
• Enhanced methodologies for complex marine structures, resulting in a 15% efficiency boost and significant cost savings.
• Utilized cutting-edge software for comprehensive structural assessments, ensuring project viability and success.
• Fostered a collaborative environment, mentoring junior engineers, leading to enhanced team performance.
• Engaged proactively with clients, understanding project intricacies, and aligning deliverables with goals.
• Overall construction supervision (offshore and on-shore) of Main Bridge and Viaduct Bridge, including Pile, Pile cap, Pier. Main bridge and viaduct precast segment casting, stressing, and erecting. Land well bottom and top plugging, pylon casting etc. as per approved drawing/MS/ITP/quality and HSE plan etc.
• Regular Site & Lab test witnessing as per approved standards, quality, specifications & Methods.
• Oversaw two national highway structure projects (In 50 miles), achieving an average 12% cost savings through efficient resource allocation and optimization.
• Implemented measures reducing defects by 25%, ensuring a 100% defect-free record in the last three projects.
• Maintained a zero-accident record, reducing safety incidents by 30% compared to industry averages.
• Led a team of 15 engineers and technicians, achieving a 15% increase in productivity through targeted training.
• Construction supervision, Re-source administration, Preparation of BBS, daily & weekly progress report. Weekly Material balance sheet. Sub contractor's work measurement and preparing draft Quantity Survey sheets
• The building's height is 51 meters, and ongoing efforts focus on renovating and maintaining its current facilities.
• Executed investigation processes to examine or assess functionality and practicability of engineering structures and elements.
• Provided support during the installation, maintenance, repair, and calibration of equipment.
POST GRADUATIONPROGRAM IN CONSTRUCTION MANAGEMENT
THREE YEARS REGULAR COURSE