Lead Engineer
Fluor Daniel India Pvt Ltd
Total des années d'expérience :32 years, 8 Mois
Versatile experience in leading mega projects of Oil & Gas (Green field, 3rd generation modularization
projects, Brown field) in Instrumentation and Control.
Worked in different phases of projects as Design & Detailed Engineering, Technical Proposals, costing /
estimation for Oil & Gas projects, Supervision of installation & pre-commissioning of field Instruments, DCS
& PLC for Refineries and Petrochemical Plants.
Worked on Instrument Index, I/O listing, P&ID reviews, Instrument Datasheets, Material requisitions and PO,
Cable schedule, Wiring & Loop diagrams, Logic Diagram, Layouts, Level sketches, MTO, review Technical
offers, TBA etc.
Having good exposure in Field Instrumentation, Mechanical Packages etc.
Conversant with International codes (API, IEC, ISA, DEP Shell and Indian Standards etc.). Familiar with SPI,
Intrucal and lead projects team working on SPI, Sizing software, 3D Modeling and 2D software.
Worked with world renowned companies like Engineers India Ltd. (EIL), L&T Ltd. and SK E&C in India.
Worked as Instrument Design Engineer at Kuwait National Petroleum Company (KNPC) at Kuwait in Middle
East.
Planned and executed Instrumentation activities as per schedule and budget. Resource management to meet
the project schedule and budget requirements
for one proposal of Refinery having CDU/VDU, FCC, NSU, DCU Unit of
Petrochemical complex having 12 Units and OSBL
Responsible for study the ITT requirement, scope, applicable specifications, standard, Deliverable
requirement, format and schedule, prepare the estimate & staffing plan to execute the scope in stipulated
time.
Department Manager - Control System
FLUOR, Gurgaon
of CS in TCO. TCO is huge project (Approx. 1 million Man-hours for Control System,
ND scope and a team of total 150 Engineers and Designers (peaked staffing was 240).
Tengizchevroil (TCO) is Future Growth Project & Wellhead Pressure Management Project (FGP - WPMP)
located at Tengiz, Kazakhstan. The project entails the design and construction for major expansion of
Tengizchevroil (TCO) existing facilities in Tengiz. Whole construction work is being done in modularization
concept (approx 60 modules). All modules are being prefabricated in Daewoo’s workshop in South Korea and
then transported through sea and brought to Kazakhstan.
The project is unique in nature because of extreme cold climate. Winterization on each single instrument was
a must. F&G system was also made very exhaustive being a totally unmanned and fully automatic plant.
Project is in workshare with Fluor, Farnborough.
TCO Control System work was divided into 6 sub-Areas (Four Process areas, Telecom and HVAC C&I), for
which there are dedicated Area Lead and Design Lead.
My responsibilities include supervision of Detailed Engineering activities like Instrument Index in SPI, MAC
Data Exchange, Data Sheets preparation for field Instruments and F&G Instruments, Procurement support,
Cause & Effects diagrams, Cable Schedule, Termination Schedule, Layouts and modelling of Instruments in
SP 3D, Mechanical Packages.
I am responsible to study the Project scope, analyze Progress, Productivity, Schedule, Budget, ensure
Quality, resolve technical queries and manage change orders. I assure that Quality plan is followed as per
project requirement.
I am conducting weekly project review meeting with all Area Leads to keep track on all project constraints and
mitigate the same by escalating the same with other Disciplines, Project Managers and Lead Offices.
Tracking Project status, Progress and Productivity, budget hours and managing change orders for the
changes happening in technical requirement of the project.
Analyzing resource requirement based on dynamic changes happening in the project and plan manpower
accordingly. Also arranging trainings as per skill set requirement for the project.
Clean Fuel Projects (CFP), KNPC, Kuwait
My responsibilities were as follows:
ITB study & understand SHELL specifications.
Preparation of Engineering schedule and manpower planning as per Project requirement.
Supervision of team of Engineers and Designers preparing various deliverables like Instrument Index, I/O list
preparation, Data sheets of Field Instruments (in SPI INtools), Layouts, MTO for Bulk material, Loop Diagram
etc.
Review of P&IDs, Technical Specification, Data Sheets, Vendor offers & prints (Flow / Level / Temp / Pressure
/ Diff. Pressure Instruments / Control Valve / On-Off Valves / PSV / Local Indicators / F&G Detectors etc).
Review of Layouts (Instrument Trench/Instrument & JB Location Plan/Instrument Air Location Layout/F&G
Detectors Layout), Process Hook up, Pneumatic Hook up, Review of 3 D Model (SP 3D modelling) for
Instrumentation scope.
To keep track on Progress, schedule, budget, variance in progress, ensure corrective action, change orders
etc.
Interfacing with other consortium partners (overseas) and other disciplines
Engineering proposals and FEED
My responsibilities were to submit the Technical Proposal including MR for Field Instruments, preparation of
MTO for Bulk material etc for following proposals / FEED:
Engineering Proposals
HOU (KOC) - Central Processing Facilities, GC (KOC) - Gas gathering station, Kuwait
RAPID PKG # 4 (PETRONAS) - ARU, SRU, SWS, LSSU, Malaysia
SOHAR REP PROPOSAL, OMAN (ORPIC) - Refinery, Oman
FEED
Uintah Project (Uintah Partners Gateway upgrader project), USA
Lucadia (Lake Charles Clean Energy Lake Charles, Louisiana)
Replacement of Existing Uniflux Heaters, KNPC
My responsibilities were:
To prepare FEED document indicating complete Instrumentation and Controls for the new Heater including
Specification of modification of DCS, ESD, Field Instruments etc., review of Specification of BMS, Analyzer
etc.
To integrate controls of Heater with the existing DCS & ESD system
Study of Instrument cable route, power requirement, Instrumentation demolition scope
To provide BOQ for Cost Estimate
Midyan Processing Facilities - Saudi Armaco
My responsibilities were to submit Technical Proposal for Instrumentation item comprising of Specification
and BOQ for all Field Instruments, RTG, CCS, VMS, PCS (DCS / ESD) etc.
Engineering Manager and E&I cordinator
Additional Gas Processing Facilities, ONGC
Additional Gas Processing Facilities - ONGC Hazira, India (
Mangla Process Terminal (MPT) - CAIRN, India
Rageshwari Gas Field (RGF) - CAIRN, India
Sonatrach New LNG Train Project SKIDA, KBR
I worked as mentor to monitor & check the Instrumentation activities. My responsibility was to review the
Engineering document of Instrumentation and to ensure the schedule and to ensure the quality of
Instrumentation related documents for Sonatrach LNG job
Mina Abdulla Refinery, KNPC, Kuwait
Panipat Naphtha Cracker Project, IOCL, Panipat
I worked in
Refinery at VIZAG: CDU/VDU
.