CONSTRUCTION AND EXECUTION OF
REINFORCEMENT WORKS FOR TAIF CITY SEWAGE
NETWORK
CONTRACT 10T, STAGE 1
Project Engineer
Aug 2021 -To date
Location: Al-Taif, KSA
Client: National Water Company (NWC)
Project Value: SAR 176 million
Project Details: Construction & Execution of Reinforcement Works for
TAIF CITY Sewage Network 20 km included 7 km Micro-Tunneling
line with (Herrenknecht AVN 1800mm & 1400mm & 1200mm)
------------------------------
(ROLES AND RESPONSIBILITIES)
• Certified Engineer from the National Water Company.
• Execution and Supervision of Micro-Tunneling line
with (Herrenknecht AVN 1800mm & 1400mm & 1200mm RCJP).
• Studying project contract, the scope of work, specifications,
drawings, safety policy & quality plan.
• Work with an emphasis on SH&E.
• Planning the necessary resources needed for the project.
• Coordinating with subcontractors for requiring manpower and
equipment.
• Material request, Site store monitoring, receiving and issuance.
• Checking material, equipment and manpower availability.
• Leading a team of Engineers, Foremen, Charge hands and Labors.
• Following guidelines and targets according to the project plan.
• Coordination with consultants for works inspection.
• Assisting with project delivery strategy and job plan, QA plan,
securing resources, establishing work briefs and budgets.
• Preparing daily, weekly and monthly Reports for submitting to
management.
RIYADH METRO PROJECT - WET UTILITY DIVERSION TO FACILITATE THE CONSTRUCTION
Client: BACS
Consultant: NWC, RMTC
Project Value: $22.5 billion
Project Details: Diversion and executing to sewer, potable and storm water lines.
ROLES AND RESPONSIBILITIES:
• Certified Engineer from BACS & FAST with certificate of appreciation for my performance and contributions to health, safety and environment.
• Site manager of Line 1 (1B2, 1C1 & 1B3) &
Line 6 ( Section 9 & 12 ):
o Contribution to accomplishment:
4 shutdowns for potable water main lines(800mm)
2 shutdowns for potable water lines(300mm, 150mm)
Sewer line in Line 1. (1.3Km)
Stormwater Line (1000mm, 800mm, 700mm, 600mm, 500mm & 400mm) & Catch basins.
Execution of chambers and thrust blocks relating to potable lines.
• Work with an emphasis on SH&E.
• Studying the scope of work, specifications, drawings, safety policy & quality plan.
• Checking material, equipment and manpower availability.
• Leading a team of Engineers, Foremen, Charge hands and Labors.
• Following guidelines and targets according to the project plan.
• Coordination with consultants for works inspection.
----------------------------------------------------------------
CONSTRUCTION OF THE SEWER NETWORK
IN PART OF TUWAIQ
Client: National Water Company (NWC)
Consultant: FKEEC
Project Value: SAR 41 million
Project Details:
Construction of sewerage network 31km,
House connections for 1300 houses.
ROLES AND RESPONSIBILITIES:
• Certified Engineer from the National Water Company.
• Planning and construction engineering of wastewater(Main Line, House Connections)
• Studying project contract, the scope of work, specifications, drawings, safety policy & quality plan.
• Planning the necessary resources needed for the project.
• Coordinating with subcontractors for requiring manpower and equipment.
• Checking material availability by 2 weeks look ahead to schedule and prepare
• Material request, Site store monitoring, receiving and issuance.
• Assisting with project delivery strategy and job plan, QA plan, securing resources, establishing work briefs and budgets.
• Preparing daily, weekly and monthly Reports for submitting to management.
• Supervision of Micro-Tunneling line and provide the necessary for the conduct of work.
Project name: RAFAL SKY GARDENS
April 2016 - Jun 2017
Location: Riyadh, KSA
Client: Rafal Real Estate Development Company
Consultant: ERGA Saudi
Designer: Promontorio
Project Value: SAR 510 million
Project Details :
Tower 1 = 3 basements + Ground + 60 floors
Tower 2 = Office building 3 basements + 8 floors
-------------------------------------------------------------------------
Project name: RAFAL RESIDENCE
November 2014 - March 2016
Location: Riyadh, KSA
Client: Rafal Real Estate Development Company
Consultant: ERGA Saudi
Designer: ERGA Progress
Project Value: SAR 335 million
Project Details : 3 Basements + Ground + 28 Floors + Roof
-------------------------------------------------------------------------
Project name: BURJ RAFAL
September 2012 - October 2014
Location: Riyadh, KSA
Client: Rafal Real Estate Development Company
Consultant: P&T Architects and Engineers Limited
Designer: P&T Architects and Engineers Limited
Project Value: SAR 810 million
Project Details : 2 Basements + Ground + 6 Floors Podium + 64 floor
-------------------------------------------------------------------------
ROLES AND RESPONSIBILITIES:
• Responsible and executing of all kind of civil works from
structural foundation to complete finishes works
• Supervising of multi-strand post-tensioned concrete slabs
• Supervising of composite construction (deck slab + steel beams)
• Executing structural works (reinforcement + formworks)
• Preparation and execution of waterproofing works
• Supervision and coordination with multi-disciplinary trades of
finishes work with electromechanical installations
• Handling sub-contractors of various finishes works
• Supervision of Façade works
• Coordinating with complete metal, Joinery and fit-out works
• Allocating and arranging of Tools and Machinery
• Leading a team of foreman, charge hands and labors
• Working on inspection and approvals with QAQC team
• Instructing and guiding the team with site safety procedures
• Following guidelines and targets according to the project plan
• Specialized in basements of the building, especially to execute and
coordinate with MEP team / Sub-contractor
• Attending site progress meetings and technical meetings
• Encountering the risks and problems at the site
• Assisting QS team in valuing the works
• Assisting planning team to ensure the performance/targets
of the projects are met on time
• Attending the checklists for handing over of the project including
snagging and de-snagging of works and maintenance/repair
• Ensuring the smooth conduct of the company procedures
Final year project: Architectural and Structural design for 30 floors a residential tower.