Project Engineer
Dorar Tammam Construction Company
Total years of experience :7 years, 9 Months
• Manage and support the field operations on projects. Report to the Project Manager,
• Ensure the foreman and crew have the materials, equipment, and information necessary to complete the job.
• Responsible for LPG tanks installation as the GASCO approval,
• Mechanical work includes piping, installation of regulators and valves based on the AS built drawings.
• Electrical work includes: LPG main and sub control panel design and installation. LPG detectors installation as Boldrin requirements, cabling, and interfacing with fire alarm system and BMS system,
• Testing and commission.
Playing a key role as a connector between Lab and Customers starting from providing the lab services for the customers throw the lab accredited, scope and capability, advice the customers for the quality required, inspecting equipment before calibration and translate the quality required to type of calibration. Scheduling the on-site calibration according to customer’s request. Coordinate with the technical manager and QC for the lab standards calibration throw the workload, coordinate and schedule with third part and Sours calibration companies for the out of scope calibrations and re-Accreditation.
• Good communication with all departments in KFSH & CCC hospitals
• Hospitals starting from arranging the working area of receiving new machines,
• Pre-installation Test for the devices and handling go live in the hospital.
• Supporting the sales team by demonstrating pumps’ operating system and after sales
• Maintain and lead service in King Faisal Specialized Hospital, and supporting the service team in ( National Guard, ARAMCO) Hospitals.
• Calibration and configuration all kind of pumps .
• Follow up the consumption of Infusion sets after installation in KFSH.
Work as a service engineer (Installation, Maintenance, and Preventive Maintenance)
• Area of experience;
• Hitachi X-ray, Ultrasound and MRI,
• Topcon eye imaging system and Tonometer