Total years of experience :16 years, 10 Months

Planning Engineer at ALMUNIF HOLDING COMPANY
  • Saudi Arabia - Riyadh
  • My current job since June 2017

Responsible for all scheduling and planning activities as
Proficiency with planning and scheduling software (MS Project / Primavera) per contract requirements.
Translate the project scope of work into activities and prepare and update project progress.
Prepare and update project schedule based on the contract.
Set work program and target milestones for each phase based on the project plan.
Monitor critical activities based on the project schedule and advise project management.
Prepares and submit updated work program and cash flow curve showing actual progress and identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities.
Monitor day to day work progress and prepare the weekly and monthly program and report.
Maintain and record update of site work progress obtained from Project Manager.
Prepares monthly report reflecting work progress summary.
Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
Participate in project meetings and discussions with the Client as required.
Assists in preparing work program, cash flow and manpower histogram for tenders.
Performs other duties and responsibilities as may be assigned from time to time.
Externally communication with Client/Subcontractor/Supplier representatives.
Internally communication with the Project team in line with the requirements of the Company's IMS and PMM.

manager of contracting departmen at OFAZ
  • Saudi Arabia - Riyadh
  • August 2016 to March 2017

- Resources Coordinator.
- Ensure that all projects are delivered on time and within budget limits.
- Develop projects and goals ranges and the involvement of all stakeholders and to ensure the technical feasibility.
- Ensure the provision of resources.
- Action plans and drawings and pricing of projects and work estimates to the schedule and budget for projects.
- Develop detailed project plans to track progress.
- Use the appropriate technologies to manage changes along the scope of the projects, schedule and costs.
- manage work weekly reports and submit them to the Board.
- Customer relationship management and stakeholders.
- Risk management.
- Maintaining relationships with customers.
- Project documentation and project log.

Site Engineer at Mogbil Anzi Contracting
  • Saudi Arabia - Riyadh
  • July 2014 to June 2016

Follow-up to the project life cycle for the following stages
- Preparation of the project.
- Determine the overall objectives of the project.
- Determine the scope of the project.
- Follow-up and implementation of analysis and design.
- Follow-up and implementation of development.
- Follow-up and implementation of installation and operation.
- Delivery stages and the terms of the project according to the rules.
- Follow-up and maintenance after the delivery of the project.

Manager Department of Maintenance at Baraha Medical city
  • Sudan - Khartoum
  • May 2013 to July 2014

- Review daily reports and schedule maintenance work to the problems mentioned in the reports
- The distribution of the workforce in the maintenance department so that they cover all the other sections of the hospital
- Develop alerts to reduce the mistakes that lead to the occurrence of an emergency breakdowns
- Develop an action plan defiance of a repeat of the faults
- Management of available resources so as to reduce maintenance costs to the fullest extent
- Give technical advice of the Working Group in the case of some of the challenges faced
- Ongoing work to develop the hospital and make it at the top of her performance art
- Work with the best companies contracts to supply equipment and services ... etc. and at the lowest cost
- Meeting daily workers to advise them and make them aware of the importance of their work and its direct impact on the performance of the hospital and therefore the patients and it humanitarian work before everything, making them doing more of the tender for the work

Site Engineer at Zaid Elhussain and Brothers Group
  • Saudi Arabia - Riyadh
  • August 2012 to June 2013

- The company has been selected to implement sewage districts of Aziziyah - climate - Dirab - inspired Almansah in Riyadh
- League career is. Analysis the maps and participate with the engineers in the development of an action plan and timetable for the project. supervisor to Surveyors to plan and cut roads with attention to other service lines
- Checking the soil of the region to choose the right equipment for drilling depending on the nature of the land and soil classification if they comply with the specifications for use in reclamation
- Distribution of heavy equipment in a manner that ensures the highest possible production and supervision with the work schedule for maintenance and to provide all necessary for continued operation without interruption
- Daily and monthly report for performance and production of heavy equipment
- Study presentations of partnerships and factories to choose best pipes client to supply the project according to the timetable
- Follow up Client work and make sure to match the materials specifications
- Supervision of the team extension pipes (D 700 to 200 mm), and all necessary action to reach the highest production
- Daily and monthly reports for each team
- Write notes on obstacles to work and find solutions to the problems Active

Site Engineer at Forawi Engineering & Services
  • Sudan - Khartoum
  • October 2010 to November 2012

 Develop or contribute to the development of the timetable for the implementation of the project according to the work for implementation of the project
Put tables showing the technical and regular and task forces labor, materials and equipment needed in each stage of the implementation and the harmonious and compatible with schedule
Access to the work site and notify the owner of the project for any obstacles impeding the implementation start
Truth about the nature of the soil and claim the work of tests required in the case of necessity and when there is no requirement of its work, particularly in the event that the soil supplied from outside the site and buried at the project site or in the case of a ground water or when soil is fragile and vulnerable significantly
Design and the adoption of concrete mix to be used
Securing samples of all the materials used and the project approved by the Owner
Alrfoat cadastral work for the entire site and draw his retina levels
Quantity drilling or filling according to the retina and the levels of design
Download the project facilities Messahaa accurately
Audit and verify the correct Altokis axes to buildings and sites columns (check the sow)
Alhvrelle follow-up to reach the desired level
Make sure the level of the rules and the removal of loose soil beneath it
Follow-up to oversee the implementation of ordinary concrete down the rules in terms of compliance with axes and Ofiqitha and integrity and ensure the cleanliness of site rules before casting
Follow-up valves manufacturing bases and columns in accordance with the plans and checking on the distribution of iron and install it in the form and place the correct
Formwork control and make sure class and specifications of concrete and the proportion of water and concrete filler well manually or by using a vibrator
Taking cubes of concrete for the necessary tests and work according to the terms of the contract
Sure to spray the concrete with water (Alcur)
Follow-up Dafan about rules and floors of buildings properly and suitable materials and the thickness of the layers 20 cm
Follow up the implementation Couvraj ceilings and beams and verification of the roof level and Astqamat edges and locations of beams and determine the dimensions and the stairs site
Monitor the implementation of arming and ceiling beams and the number of reinforcing bars and Tafridha Tkchrist and iron in the correct locations and raise Almaxh iron on iron chairs and make sure the work of holes in the ceiling and health for electrical installations and Exchange rain according to the schemes
Tosissat follow up the implementation of electrical and plumbing, air conditioning and other services
Bishop pour concrete follow-up and ensure the quality and levels and filling and sprinkled with water until the last ceiling
Follow-up to finishing (the white-paint-tile -.... etc.) in terms of matching Used materials and mixtures specifications and how to audit implementation in accordance with the "approved schemes and calculate quantities work carried out on the ground at every stage
Review item which will be implemented mathematically and executive schemes and work on the adoption of an amendment is necessary
Action statements and abstracts of the work done and submitted to the competent authorities to be disbursed payments of the value of those acts
Ensure compliance Ntniv business with the schedule in order to avoid delay and work to remedy any delay
Delivery of each stage of the work supervisor of the project engineer

Site Engineer at Forawi Engineering & Services
  • Sudan - Khartoum
  • June 2008 to November 2010

- Sanitation maps and documentation analysis
- Design and mapping of infrastructure and mechanical systems.
- Execute sewage works at site according to the drawings.
- Execute sewage works and water supply equipment on site and approved by the consultant.
- Execute civil works, and concrete.
- Weekly and monthly reports and evaluate the implementation of the sanitation and water supply.
-Supervision of public relations and select the appropriate companies to supply suitable materials such as pumps and tanks, seats, urinals, ... Etc with their accessories and their own spreadsheets.
- Execute and modify mechanical systems such as pumps, filters, and submersible pumps.
- final, handover for all executed works

Designer sewage systems and water Supply at Forawi Engineering & Services
  • Sudan - Khartoum
  • May 2010 to June 2010

Design and draw all the water sanitary works and mechanical systems for the following buildings:

- Tower Chancellery of national security.
- The building of the Ministry of Social Affairs.
- Based safe ÚŇÇáĎíä.
- Solidarity Bank Tower.
- Endowments Mansheya Complex (residential towers).
- Towers Complex Chinese company Zing (residential towers)

Site Technical Engineer at Forawi Engineering & Services
  • Sudan - Khartoum
  • October 2008 to May 2010

- Sanitation maps and documentation analysis
- Design and mapping of infrastructure and mechanical systems.
- Execute sewage works at site according to the drawings.
- Execute sewage works and water supply equipment on site and approved by the consultant.
- Execute civil works, and concrete.
- Weekly and monthly reports and evaluate the implementation of the sanitation and water supply.
-Supervision of public relations and select the appropriate companies to supply suitable materials such as pumps and tanks, seats, urinals, ... Etc with their accessories and their own spreadsheets.
- Execute and modify mechanical systems such as pumps, filters, and submersible pumps.
- final, handover for all executed works

Site Technical Engineer,Consulting at Sudanese Office for Engineering Consultancy
  • Sudan - Khartoum
  • February 2004 to March 2005

- Review and analyze business chart and health documents.
- Overseeing the implementation of on-site sanitary works according to the drawings.
- Inspection of sanitation and water supply and on-site equipment and approval.
- Inspection civil works, Khersana the armed Khersana.
- Participation in the weekly and monthly reports and evaluate the implementation of water supply and sanitation

Education

Diploma, MEP, Sanitation and water supply Engineering
  • at University of Khartoum
  • December 2003

Specialties & Skills

Primavera
Water Supply
Water Treatment
Drainage
Microsoft Office tools
Internet and management
Auto Cad
Franchise analytical ability to work and solve problems, communication skills, and the ability to wo
were courteous
Resource Management

Languages

English
Expert
Arabic
Expert

Training and Certifications

(PMP) Project Management Professional (Training)
Training Institute:
Milestone Training Center
Date Attended:
February 2015