عمرو أنور, PROPOSED POSITION		Sr. Land Surveyor

عمرو أنور

PROPOSED POSITION Sr. Land Surveyor

هيل انتيرناشونال

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Etudes secondaires ou équivalent, المساحة
Expérience
27 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :27 years, 4 Mois

PROPOSED POSITION Sr. Land Surveyor à هيل انتيرناشونال
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis novembre 2002
Construction Management à Hill International –
  • Je travaille ici depuis septembre 2013
Surveyor à Hill International
  • Émirats Arabes Unis
  • Je travaille ici depuis septembre 2013

Project Description:
The Abu Dhabi International Airport Midfield Terminal Complex (MTC) is being constructed to cope with increasing passenger traffic
The MTC is located between the airport's two runways, which also gives the terminal its name. The new complex will provide a full terminal building, passenger and cargo facilities, and duty­ free shops and restaurants for a total capacity of 27-40 million people a year. Piers will accommodate up to 65 aircraft, including the Airbus A-380. 49 Gate Houses and 106 Passenger Boarding Bridges. Baggage Belt is over 28 km and Baggage Delivery Time is 15-20 mints. 150 Check in counters and First and Business Class dedicated Check in and Lounges
The MTC terminal building will be one of the region's largest and most architecturally iconic structures. It will be 742, 000 square meters in size. The central space of the terminal building will be large enough to hold three full-sized football pitches while the check-in hall features a ceiling 52 meters tall at its highest point. 74, 000 t of Steel Structure with Roof Span is 319 m at widest point. 672, 000 m3 of concrete, 23, 000 External glazing panels, it will be with Total cooling load 146MW by 309 AHUs and with connected load 115 MW by (22KV) 36 Substations The complex will include up to 31, 384 square meters of retail and food and beverage outlets. These are set around a 1, 000 square meter indoor garden, another first for the region, which will host a wide variety of landscapes and species from region and beyond.
All the works for airside include all necessary items including Earthworks, Pavements, markings, drainage, general utilities, Airfield Ground Lighting (AGL), Gate Service such as Flood lighting, VDGS and 400 HZ and structural works/ systems for the airside tunnel, aircraft fuel hydrant system and apron utilities including potable water distribution, chilled water distribution, 22kv medium voltage and low voltage distribution, sub-stations, communications distribution and fire main distribution, Traffic Tunnel, Automated People Mover (APM) Tunnel, Automated People Mover (APM) Head House Building.
Responsibilities/Tasks:
•Perform survey work and survey work the direction and guidance for the Supervision surveyors.
•Checked Survey Shop Drawings.
•Checked all setting out work at field.
•Supervise survey party staff.
•Rotate staff assignments to develop the skills and qualifications of the Supervision Staff.
•Record all measurements, road readings, and calculation neatly and accurately in field books as the work progresses.
•Coordinate with the contractor’s surveyor Engineers on work priorities and schedules.
•Report discrepancies or technical problems to the Resident Engineer.
•With the contractor, perform joint measurements of the completed work for payment.
•Check completed work for conformance to the line and grade required by the project plans in coordination with the inspectors assigned to the item of work.
Reconstruction of Mafraq Interchange.

à Hyder Consulting ME Ltd
  • Autre
  • juin 2010 à septembre 2013
à Hyder Consulting ME Ltd
  • Autre
  • février 2008 à juin 2010
Inspector à Hyder Consulting ME Ltd
  • Émirats Arabes Unis
  • février 2008 à juin 2010

Project Description: Abu Dhabi - Al Ain Road
Construction of about 5 km on both sides of the interchange dual c/w 4-lane & 2 shoulders 3 m each; (total width 21 m each direction), median width 6-8 m.
The exiting road is 4-lane each direction on Abu Dhabi side of the interchange and 3 lane each direction on Al Ain side of the interchange (total width 17m each direction).

•Dubai - Tarif Road
Construction of twin two span post tensioned box girder bridge total length about 75m, and (total width 27m each direction), (4 lanes + 2 shoulders 3 m each + Acc/Dec lane + 1.5 m F.P.) and 8 m wide median.
Construction of 5.2 km Road on both sides of the interchange dual C/W 4-lane & 2-shoulder 3.0 each; (total width 21m each direction), median of varies width 20 m at Dubai end, 8 m at main bridge and 13 m at Tarif end.
The existing bridge is 11 m in width each direction (2 lanes + 2 shoulders 2 m each). The road is dual C/W road 2- lane each direction on Tarif side, and 2-lane expanding to 4-lane each direction on Dubai side. Currently trucks are not allowed to use the bridge except with permit.
• Flyover from Abu Dhabi to Dubai
Construction of flyover from Abu Dhabi to Dubai - length about 1728 m and width 17m (2 lanes + 2 shoulders and foot path). Total No. of spans 16, max span length 84m & max pier height about 18 m.
Existing road from Abu Dhabi to Dubai is loop road about 7m in width.
• Flyover from Al Ain to Tarif
Construction of flyover from Abu Dhabi to Dubai - length about 1728 m and width 17m (2 lanes + 2 shoulders and foot path). Total No. of spans 17, max span length 70m & max pier height about 16.6 m.
Existing road from Abu Dhabi to Dubai is loop road about 7m in width.
Responsibilities/Tasks:
•Perform survey work and the direction and guidance for the surveyors.
•Establish primary horizontal and vertical control point including reference ties for re-establishing the points in the field.
•Checked all setting out drawing.
•Checked all setting out work at field.
•Supervise survey party staff.
•Rotate staff assignments to develop the skills and qualifications of the surveyors.
•Record all measurements, road readings, and calculation neatly and accurately in field books as the work progresses.
•Coordinate with the contractor’s surveyor on work priorities and schedules.
•Report discrepancies or technical problems to the Resident Engineer.
•With the contractor, perform joint measurements of the completed work for payment.
•Check completed work for conformance to the line and grade required by the project plans in coordination with the inspectors assigned to the item of work.
Maintain equipment in proper condition and perform calibration checks.

à Hyder Consulting ME Ltd
  • Émirats Arabes Unis
  • janvier 2006 à janvier 2008

Consulting ME Ltd -UAE- Contract No.238, Internal Roads for Sectors E-19/02, E-25 & E-48.

Civil inspector à Najmat Abu Dhabi Reem Island
  • Émirats Arabes Unis
  • janvier 2006 à janvier 2008

Project Description:
Marine Works, Infrastructures, and Roads
Road Grading Works: Construction of Internal Roads-Grading/Earthworks
Responsibilities/Tasks:
•Prepared Construction drawings
•Established survey reference control network
•Supervised the setting-out of required points, leveling and all surveyor work
•Downloading, editing and sorting of data collected on site with computer aided Design, LISCAD and other related software.
•Checking of Shop drawings and As-built drawings.
•Marina and Canal Walls (Quay wall pre-cast blocks), Borrow area-deep Excavation, Reclamation-filling, and Rock revetment works.

Contract No.238, Internal Roads for Sectors E-19/02, E-25 & E-48.

à Hyder Consulting ME Ltd
  • Émirats Arabes Unis
  • janvier 2005 à janvier 2006
à Hyder Consulting ME Ltd
  • Émirats Arabes Unis
  • janvier 2005 à janvier 2006

Project Description:
•Roads in Sector E-19/02: The Construction of 13.3 Km of single carriageway 7.30m wide asphalt road in addition to 6.00m wide parking and 2.0m foot path including street lighting, road marking, road signs and lateral storm water network511 No of Parking for entrances to houses.
•Roads in Sector E-25: The construction of 3.3 Km of single carriageway 7.30m wide asphalt road with to 5.5m wide parking and 2.0m foot path including street lighting, road marking, and road sings and lateral storm water networks.
•Roads in Sector E-48: The construction of 7.2 Km of single carriageway 7.30m wide asphalt road with to 2.5m wide parking and 2.0m foot path including street lighting, road marking, and road sings and lateral storm water networks.
Responsibilities/Tasks:
All Setting out and survey work:
•Single carriageway7.3m width asphalt Road.
•Parking 6.00 wide and service road.
•Storm water drainage.
•Street lighting system.
•Road marking and traffic signs.
•Services and Utilities (ducts).
•Checking Shop drawings of contractors.
•Preparation of as built drawings.
•Coordination and arrangement with the government municipality department.


Internal Roads for 200 low cost Houses in Delma Island

à Internal Roads
  • janvier 2004 à janvier 2005

for 200 low cost Houses in Delma Island (

à Hyder Consulting ME Ltd
  • Émirats Arabes Unis
  • janvier 2004 à janvier 2005

Project Description:
•Internal Roads for 200 low cost Houses in Delma Island.
Setting out, leveling and checking work for 8.2Km of Single carriageway7.3m width asphalt Road, 0.9Km of Dual carriageway 8.0 width asphalt Road Ring Roads Network of Delma Island

à DIWI CONSULT
  • Émirats Arabes Unis
  • janvier 2002 à janvier 2004

(EMIRATES) Abu Dhabi, UAE Al Falah Area Roads (Houses). (

à Al Falah Area Roads
  • Émirats Arabes Unis
  • janvier 2002 à janvier 2004

Project Description:
•Al Falah Area Roads (Houses).
Setting out, leveling and checking work for Single c/w of width 11m and dual c/w of width 22m, 511 No of Parking for entrances to houses, Parking and service road to mosques, Roundabouts, Storm water drainage, Street lighting system, Road marking and traffic signs, Services and Utilities (ducts), Checking Shop drawings of contractors, Preparation of as built drawings

Responsibilities/Tasks:
All Setting out and survey work:


Construction of the International Health Centre and the establishment of Military Airport Fayed

Sawyer à AL SALAM ENGINEERING Egyp
  • janvier 2000 à janvier 2002

Project Description:
•Construction of the International Health Centre and Signed draft and the establishment of Military Airport Fayed.

Responsibilities/Tasks: Site preparation and mobilization, Setting out and leveling of roadwork's, Setting out and leveling of building works, Setting out and leveling of waterworks, Monitoring and checking execution of electrical works, Monitoring and checking execution of sewerage works, Excavation, Filling and Leveling.


Renewal Project and Restoring Abu

المساحة à AL SALAM ENGINEERING
  • Egypte - Le Caire
  • janvier 2000 à janvier 2002

Egypt- Construction of the International Health Centre and the establishment of Military Airport Fayed.

Sawyer à CONTRACTING COMPANY Egypt Renewal Project and Restoring Abu
  • janvier 1997 à janvier 2000
Surveyor à AJYAD CONTRACTING COMPANY
  • Egypte
  • janvier 1997 à janvier 2000

Project Description:
Renewal Project and Restoring Abu Sawyer Military Airport and Construction of Al Abid Demestic Factory.

Responsibilities/Tasks:
•Taking cross section levels, Taking longitudinal levels, Estimation and calculation of quantities, checking setting out and leveling of internal road works, Setting out and leveling of structural and concrete works, setting out of main storage area of 10, 000m2.








It is Hill International’s policy to verify all candidates’ degrees and certifications. Verification for this candidate is currently under process.

Éducation

Etudes secondaires ou équivalent, المساحة
  • à معهد المساحة
  • juillet 1997

courses: - DIPLOMA FROM CIVIL ENGINEER &SURVEY INSTITUTE CAIRO - EGYPT

Specialties & Skills

Marketing
Parking
DIRECTING
ENGINEERING
LIGHTING
MICROSOFT WORKS
PROJECT PLANNING
UTILITIES
ACCREDITED PROJECT MANAGER
BRIDGES
DELIVERY