Amr Elsayed, Reservoir Engineer. Management

Amr Elsayed

Reservoir Engineer. Management

AbuQir Petroleum Co. (Edison International JV)

Lieu
Egypte
Éducation
Baccalauréat, Petroleum and Mining Engineering
Expérience
13 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 0 Mois

Reservoir Engineer. Management à AbuQir Petroleum Co. (Edison International JV)
  • Egypte - Alexandrie
  • Je travaille ici depuis avril 2016

- Participate in well proposals and well Workovers justifications to upper management and partners.

- Preparing tenders documents, and participate in the evaluation committees.

- Production Analysis & Preparing company achievements in board and technical committee meetings on monthly, quarter yearly and yearly basis.

Reservoir Engineer, Simulation (On-Loan Basis) à Edison International
  • Egypte - Le Caire
  • octobre 2015 à avril 2016

- Building Simulation Models covering simple static models, rock, fluid models, up-scaling, grid design, and field production development strategies, using Petrel RE, and Eclipse simulation software.

- Build complete data base and OFM projects for all company fields ( AbuQir off-shore gas field, Rashid off-shore gas field, and West Wadi ElRayan on-shore oil Fields)

Reservoir Geologist Engineer / Production Engineer à AbuQir Petroleum Co.
  • Egypte - Alexandrie
  • janvier 2012 à octobre 2015

- Building Complete OFM projects from scratch for the company`s oil and gas fields.

- Production forecasting and reserve estimation using volumetric calculation, Material balance, Decline curve analysis, MBAL analytical models, and Numerical simulation models.

- Monitor production data parameters and taking remedial actions with reservoir engineering team.

- Formation damage studies in order to avoid sand production problems in gas wells.

- Conducting studies and market surveys for liquid loading solutions to restore gas wells maximum production capacity.

- PTA Interpretation using KAPPA Saphir Software.
- QA / QC full field simulation studies using Petrel RE.

- Running simulation models to determine optimal development plans to increase company profit.

- Open hole/Cased hole logs analysis and interpretation.

- Formation tester DH Pressure points fluid gradient interpretation.

- Conduct regular on-shore and off-shore site visits to witness LWD, slick line, E-line activities.

- Conduct regular lab visits to witness PVT analysis activities.

- Dealing with sucker rod pumps and its activities such as Dynacard, fluid level surveys, and operating Lufkin Well manager controller.

- Preparing Daily, weekly, and monthly production and activates reports.

Geophysicist à AbuQir Petroleum Co.
  • Egypte - Alexandrie
  • juin 2011 à janvier 2012

- 2D and 3D Seismic Interpretation of AQP gas fields in Mediterranean using Petrel SLB software.

Éducation

Baccalauréat, Petroleum and Mining Engineering
  • à Suez University.
  • juin 2010

BSc. Degree, Faculty of Petroleum and Mining Engineering, Suez Canal University General Grade: Good

Etudes secondaires ou équivalent, American Diploma
  • à Commission on International and Trans Regional Accreditation (CITA).
  • juin 2005

American Diploma, high school, Accredited by The Commission on International and Trans Regional Accreditation (CITA). Grade: A+

Specialties & Skills

Geology
Reservoir Engineering
Reservoir Simulation
Reservoir Management
Petroleum Engineering
OFM Software
Prosper
PTA - Kappa / Saphir
Power Point Presentation
eclipse

Langues

Arabe
Langue Maternelle
Anglais
Moyen

Formation et Diplômes

Train of Trainer "TOT" Diploma (Formation)
Institut de formation:
Cambridge International Accreditation
Date de la formation:
March 2015
Eclipse 100 Black Oil (Formation)
Institut de formation:
Schlumberger, NEXT
Date de la formation:
October 2012
Integrated Reservoir Studies (Formation)
Institut de formation:
EREX Petroleum Consultant Co.
Date de la formation:
April 2014
Durée:
50 heures
Petrel RE & Workshop (Formation)
Institut de formation:
Schlumberger, NEXT
Date de la formation:
October 2012
Technical Report Writing (Formation)
Institut de formation:
SPE Suez Canal University Student Chapter
Date de la formation:
March 2009
Fire Fighting Principles and Tactics (Formation)
Institut de formation:
Abu-Qir petroleum Company
Date de la formation:
March 2013
Communication, teamwork, and presentation Skills (Formation)
Institut de formation:
SPE Suez Canal University Student Chapter
Date de la formation:
May 2008
Durée:
12 heures
HEUT "Helicopter Underwater Escape training, offshore safety course (Formation)
Institut de formation:
Arab Academy for science and technology
Date de la formation:
June 2012
Merak Fundamentals of Petroleum Economics (Formation)
Institut de formation:
Schlumberger, NEXT
Date de la formation:
April 2015
Oil Field Manager "OFM" Software" (Formation)
Institut de formation:
Schlumberger, NEXT
Date de la formation:
May 2015
Practical Reservoir Simulation (Formation)
Institut de formation:
EREX Petroleum Consultant Co.
Date de la formation:
June 2015
Durée:
50 heures
Special Core Analysis SCAL (Formation)
Institut de formation:
Oil and Gas Skills EGPC Training Center
Date de la formation:
December 2012
Durée:
40 heures
Advanced Formation Evaluation (Formation)
Institut de formation:
Oil and Gas Skills EGPC Training Center
Date de la formation:
November 2012
Durée:
40 heures
Pipesim Software (Formation)
Institut de formation:
Schlumberger, NEXT
Date de la formation:
January 2015
Surface Network and de-bottlenecking (Formation)
Institut de formation:
Schlumberger, NEXT
Date de la formation:
March 2015

Loisirs

  • Running