BIM Manager
Dar Al-Handasah
Total years of experience :13 years, 9 Months
Job Responsibility:
-Develop and implement BIM strategies aligned with company goals and project requirements.
-Define BIM standards, protocols, and best practices for project teams.
-Providing hands-on training to internal disciplines i.e. Revit, Naviswork, BIM360 and Aconex.
-Utilize BIM data to generate reports, analyses, and visualizations for project optimization and stakeholder communication.
-Supporting, mentoring all Aconex workflow and ensuring the BIM coordinator closing it before the overdue.
-Conducting onboard (BIM kick-off) meetings with client and contractors, either leading or attending as necessary.
-Reviewing and approving the BIM Execution Plan (BEP) along with all appendices for all projects within its scope. And ensuring that the contractor has implemented BIM processes, data quality measures, and completeness tools.
-Assure that all Assets Information data had been integrated clearly and embedded within the BIM models starting from the Shop drawing phase up to the Handing-over phase.
-Supporting, mentoring and coaching team members to further develop proficiencies and provide opportunities to learn and develop. and support project teams on BIM software and workflows.
-Monitoring and maintaining project-level CDE and associated workflow (i.e., model coordination, collaboration, model federation, model health, LOD compliance, and clash management) in alignment with project scope and EIR, including routine CDE validation checks for compliance to BEP and project standards
-Reviewing BIM360 issues and ensuring that BIM coordinators have assigned issues for all disciplines before contractors submit the models.
-Keeping track of open and answered BIM360 issues, ensuring that these issues are closed before the due date.
-Creating and organizing all weekly BIM coordination and progress meetings for the entire project.
Project:
Site Supervission for Shura Island Program 7 includes all trades, while Program 6 and 8 include all piles scope. Client (Red sea global)
Job Responsibility:
-Participate in Coordination meetings and workshops held with site team (Project team) to solve all pending issues with off-site (BIM team), Also supervising and coordinate with the subcontractors to ensure the BIM deliverable are within the project time schedule and quality.
-Provide construction top management team Power bi report according to models information.
-Develop, lead and assist project teams in BIM project set up.
-Support/Solve Technical issues in design.
-Ensure that the implementation of BIM aligns with the client’s CAD-BIM strategy and links appropriately with winder business.
-Comply with the requirements of all discipline QA/QC.
-Review preliminary designs, working drawings, specifications and cost estimates according to the client’s brief.
-Coordinate Navis clash report for each discipline and distributes to the necessary discipline members.
-Utilize BIM models for quantities extraction, Shop drawings creation & As-Builts.
-Working as a team leader for the engineers/modelers and assisting on site engineers.
-Following up the BIM workflow, and required standards to ensure that the contractors and sub-contractors are following them.
-Coordinate between on site (Project team) and off site (BIM team) by transfer all the required data and information from both sides.
-Coordination between different disciplines as (Electrical, Plumbing, Fire Fighting & HVAC).
-Creating from Navis search set and appearance profile to submitted to the client.
Shop drawing Project:
- Cyprus (Limassol)
o City of Dreams Mediterranean Resort (COD)
Job Responsibility:
- Following up the BIM workflow, and required standards to ensure that the contractors and sub-contractors are following them.
- Develop, lead and assist project teams in BIM project set up.
- Ensure that the implementation of BIM aligns with the client’s CAD-BIM strategy and links appropriately with winder business.
- Coordinate Navis clash report for each discipline and distributes to the necessary discipline members.
- Integrating my programming experience by Dynamo with BIM to enhance the processes.
- Lead Electrical and Low Current BIM modelers in the Project and solve/assist them to solve any issue in Revit template, families, modeling and creating shop drawings.
- Prepare the Shop Drawing as per specs and Egyptian code.
- Distribute the modelers per discipline and a sign them according to the work follow.
- Coordination between different disciplines such as (Arch, Str, Plumbing, Fire Fighting & HVAC).
- Participate in Coordination meetings and workshops held with the main contractor.
- Creating a documents and guidelines for the Electrical and Low Current BIM modelers to follow it.
- Help to identify congested areas to solve it with all disciplines.
- Creating the shared parameters, project template & families need it in the project.
Shop drawing Project:
- Egypt (Cairo)
o Central Business District (CBD) of the New Administrative Capital.
Job Responsibility:
- Following up the BIM workflow, and required standards to ensure that the contractors and sub-contractors are following them.
- Developing the BIM execution plan (BEP) from Design phase to construction phase.
- Develop, lead and assist project teams in BIM project set up.
- Coordinate between on site (Project team) and off site (BIM team) by transfer all the required data and information from both sides.
- Ensure that the implementation of BIM aligns with the client’s CAD-BIM strategy and links appropriately with winder business.
- Comply with the requirements of all discipline QA/QC.
- Review preliminary designs, working drawings, specifications and cost estimates according to the client’s brief.
- Coordinate Navis clash report for each discipline and distributes to the necessary discipline members.
- Implement BIM training modules for key staff and maintain training courseware.
- Utilize BIM models for quantities extraction, Shop drawings creation, As-Builts creation, Asset parameters, Visualization, 4D & 5D
- Leading BIM meetings with the client and the consultant that resulted in resolving many issues of the project clashes prior to construction.
- Integrating my programming experience by Dynamo with BIM to enhance the processes.
- Working as a team leader for the modelers and assisting on site engineers.
- Coordinating on submittals and gathering all close-out documents such as drawings, Warranties, Operating and Maintenance manuals.
- Participate in Coordination meetings and workshops held with site team (Project team) to solve all pending issues with off-site (BIM team), Also supervising and coordinate with the subcontractors to ensure the BIM deliverable are within the project time schedule and quality.
As-Build Drawing Project:
- United Arab of Emirates (UAE)
o Al Maktoum International Airport Expansion
Shop drawing Project:
- United Arab of Emirates (UAE)
o EXPO2020
Job Responsibility:
-Lead ELE/FRD/BACS BIM modelers in the Project.
-Prepare the Model standard according to the Qatar Rail BIM Guidelines (QRBG).
-Assist all ELE/FRD/BACS modelers in the project and solve any problem they have it in Revit.
-Response model (DRS) Design review sheet from the main contractor (ALYSJ) joint venture (Aktor-L&T-Yapi-STFA-AlJaber).
-Response model (DRS) Design review sheet from the main contractor consultant (DVE) design verification engineers (Mott MacDonald).
-Response model (ERS) Engineering review sheet from the (PMC) Project management consultancy (Jacobs-French JV).
-Distribute the modelers per discipline and a sign them according to the work follow.
-Submit the model Minor submission and Major submission according to the submission standard folder structure.
-Coordination between different disciplines as (Electrical, Plumbing, Fire Fighting & HVAC).
-Checking the Markup from the technical team before the modelers implemented.
-Checking the modeling progress and give instruction to the modelers to fix any problem in the model.
-Participate in Coordination meetings and workshops held with the main contractor.
-Performing clash detection between different disciplines using Revit & Navisworks.
-Creating View Points from Navis to help technical team to check the problems.
-Creating a documents and guidelines for the ELE/FRD/BACS BIM modelers to follow it.
-Help to identify congested areas to solve it with all disciplines.
-Follow up with the BIM manger and attend meetings to improve the models.
-Assist all station managers in the project to submit as schedule time frame.
-Responsible about the assessment for ELE/FRD/BACS BIM modelers.
Design and Modeling Projects:
-Qatar (QTR)
o Gold Line Metro (Qatar Rail)
Job Responsibility:
-Developing the model for the approved design works and according to the specifications, BOQ’s and submittals.
-Coordination between different disciplines as (Electrical, IT, Plumbing, Fire Fighting, Architecture & Structure.
-Developing the 3D modeling for the shop drawings of the project & export them on file AutoCAD files as (Power, Lighting, Feeder routing, Earthing, Lightining, BMS, IT, Security System, Disable System, Fire Alarm).
-Performing clash detection between different disciplines using Revit & Navisworks.
-Revising the design works & sending requests for information (RFI’s) to the consultants & redesign if necessary for any conflicts existed in design works.
-Creating 2D sections & 3D snapshots for the site engineers helping them in the insulation stage.
Design and Modeling Projects:
-Saudi Arabia (KSA)
o El-Qurayat Airport
o Yanbo Airport
Shop drawing Projects:
-Qatar (QTR)
o Doha Oasis
Job Responsibility:
-Assisting in the preparation of design specifications, computation and drawings.
-Performing calculations and studies such as voltage drop, load flow, short circuit etc.
-Interfaces with team members, other discipline members and clients.
-Prepare Estidama Calculation such as Light Power density (LPD) and Electricity meters.
-Review vendor and subcontractor’s quotations, drawings and specifications for technical adequacy and conformance with project requirements.
-Maintain awareness of code regulation changes and evaluates impact on design.
-Check all models and coordination for all MEP discipline.
-Coordinating between MEP and Structural/Architectural teams.
-Review construction documents to ensure adherence to established specifications and standards.
-Help to identify construct-ability problems and propose solutions.
-Assist with identifying design change challenges and coordination of changes.
-Supervise and checking drafter and junior engineer Model process cable tray, Power, Lighting and Light current to produce Electrical layout drawings and provide a bill of material
Design Projects:
-Saudi Arabia (KSA)
o Alkhair Mall Riyadh
o Park Mall Tabuk
-United Arab Emirates (UAE)
o Abu Dhabi Disable Club
o Grand Marina Intercontinental Hotel
o Link Tower
o Villa Mummar El Hadidi
Job Responsibility:
-Lead MEP team and check all models and coordination for all discipline
-Prepare and Raising RFIs to consultant.
-Coordinating between MEP and Structural/Architectural teams.
-Participate in Coordination meetings and workshops held with the consultant.
-Review construction documents to ensure adherence to established specifications and standards
-Help to identify construct-ability problems and propose solutions
-Assist with identifying design change challenges and coordination of changes.
-Model process cable tray, Power, Lighting and Light current to produce Electrical layout drawings and provide a bill of material for procurement and dimensions for installation
-Act as a resource for field coordination. Create data-rich models to aid in the coordination process
BIM Projects:
-Abu Dhabi Louvre Museum
The Abu Dhabi Louvre Museum is located in the culture-focused neighborhood of Saadiyat Island, which aims to concentrate the largest number of cultural institutions in the world. The design comprises a series of galleries below a 180m diameter dome which is designed to shade the majority of the public area.
Surface area of 24, 000 m²/project cost 500 million euro.
Owner: Tourism Development and Investment Company (TDIC)
Consultant: Jean Nouvel & Buro Happold (Ltd)
MEP contractor: Arabtec, ASO and Sanjose
MEP subcontractor: Drake & Scull, Al Habtoor (HLS)
Job Responsibility:
-Review construction documents to ensure adherence to established specifications and standards.
-Help to identify construct-ability problems and propose solutions.
-Assist with identifying design change challenges and coordination of changes.
-Model process cable tray, Power, Lighting and Light current to produce Electrical layout drawings and provide a bill of material for procurement and dimensions for installation.
-Act as a resource for field coordination. Create data-rich models to aid in the coordination process.
BIM Projects:
-Holy Mosque Expansion in Mecca (Multi Projects)
It is the third and the biggest expansion in the history for the biggest mosque in the world it is one of the most difficult projects in middle east as it expand while all prayers doing their pray. And it will cost 80 billion SR.
Consultant: Dar Al-Handasah (shair and partners)
Main contractor: Saudi Binladin Group
-Electrical BIM and coordination for Shamiyah Expansion
-Electrical BIM and coordination Service Building Expansion
-Electrical BIM and coordination Mecca Hospital
Job Responsibility:
-Designing distribution systems, Power, Lighting, Light current (Fire Alarm, CCTV, Data and voice, Public address, IPTV, Access Control, Master Clock & Nurse Call), single line diagram, Risers and electrical system calculations (Phase balance, Voltage drop and Short circuit)
-Develop designs from project specifications
-Allocate, prioritize and check work of a team of draftsman.
-Check and evaluate design and material specifications for tender
-Prepare and check material data sheets and coordinate with procurement engineer to select materials
-Document, record and report on meetings, progress of jobs and construction completions from design & validation reports from Project Engineers
-Incorporate feedback from projects and customers for design clarification and modifications during the development and construction project phases
-Electrical Design Review and drawings
-Supervises construction of several electrical engineering projects
-Site Survey
-Review and revision technical design submittals
-Check specifications / requisition
-Check / review design calculations, drawings and bill of quantity
-Designing, shop drawing, as built and check it
-Shop Drawing coordination
-Lead and coach junior technical officers
-Re-calculation / check of substation distribution and all below it as (selection of low voltage and medium switchgear, cables, transformers and generators)
-Substation equipment inspection.
-Check and revision of MIR (Martial inspection request).
-Check and revision of IR (inspection request).
-Check and revision invoices and BOQ.
*Designed Projects and Supervision:
-As-Salam International Hospital (ASSIH) renovation project
o Electrical design for day care floor
o Electrical design for management floor
o Electrical redesign and as built for E.R (Emergency room)
o Electrical design for O.R (Operation Room)
o Electrical design for OPD (Outpatient department)
o Electrical design for Archiving floor
o Electrical design and shop drawing for Single, double and suit patient room
- El-AKKAD Hospital (VIVA EL-AKKAD) renovation project
o Electrical Riser and SLD As-built for whole hospital
o Electrical design for O.R (Operation Room)
o Electrical design for OPD (Outpatient department)
o Electrical design for management floor
o Electrical design for kitchen and cafeteria floor
o Electrical design for single, double and suit patient design
o Electrical design for X-ray and CT-scan room
o Electrical design for cath lab and recovery floor
- Other Projects
o Electrical design and site supervision for TKG and Nagi Administration office in el-Salam towers
o Electrical design and site supervision for Viva Seha Office
o Electrical design, as-built and site supervision for Nagi and associates new office in el Maadi
o Lighting design for El Borg Hospital
o Electrical design, as-built and site supervision for TKG new office in el Maadi
o Electrical design and site supervision for several villas as ex.(Alex west villa, El-Naseem compound villa, El-Sheikh Zayed villa and Marasi compound villa)
o Electrical design and site supervision for several apartment
- Tendering handling:
o Prepare priced BOQ for Porto Cairo project (Medical Center A&B) tender and prepare project submittals
o Prepare priced BOQ for Golf Porto Marina (Golf Bay Buildings) tender and prepare project submittals