Figuring out projects scope of work.
* Studying projects technical requirements through technical specifications, Design
philosophies, Drawings of single line diagrams, power risers, load studies& panel
schedules, architectural drawings, general layouts…. etc.
* Studying the necessary equipment for the projects.
* Estimating cables sizes, cable routing lengths, cable trays, conduits and any other
electrical or mechanical equipment’s sizes.
* Studying vendors offers technically & commercially.
* Preparing technical & commercial compliance studies.
* Preparing Commercial budgets.
* Preparing the required technical & commercial proposal documents such as
Technical Data sheets, Technical deviation forms, primary lay out, SLD, HSE Plan,
Construction Equipment utilization plans, man power tables, price schedules and
commercial pre-qualification documents such as financial capabilities & statements.
* Conducting meetings with the mechanical Engineering team, figuring
out preliminary designs and sizing for mechanical equipment based on a
preliminary vision proposed by tendering team.
* Conducting meetings with construction team for pricing of installation & erection
Works in terms of the required man power & necessary equipment required for
construction activities.
o Reference project
* EPC Projects:
* Bani suef combined cycle power plant 4800MW.
* Suez Gulf substation 500/220/22kV
* Kenya 66/11kV S/S& Transmission lines.
* Angola Camama, Cazenga and Vienna Power plants 100MW each.
* Attaka power plant 350MW simple cycle + Mahmoudia power plant 275MW simple
cycle.
(Scope: Identify the project scope, specifications and requirements. Preparation of all the
tender technical and commercial documents and conducting meetings with the customer to
fulfill all the technical clarifications. Conduct the meeting and calls with the equipment’s
vendors to ensure the tender specifications matching) and (procurement process of all the
equipment. Technical and commercial offers evaluations, negotiations with all the
approved vendors and purchase order preparation.
* Installation/testing& commissioning scope:
* KSA-Jadda South S/S 380/26/13.8kV - Installation for Electrical and Instrumentation Eq.
* KSA-PP13 380/132kV S/S - - Installation for Electrical Eq.
* Cairo south combined cycle rehabilitation works- Supply, installation and testing.
* KSA-As-Safa 380kV S/S - installation, testing and commissioning.
(Scope: Identify the project scope, time schedule and check the bill of materials.
Preparation of all the tender technical and commercial documents. Estimate all the
equipment utilization plan, manpower mobilization (direct& indirect) and price schedule.
Prepare all the project price summary and proposal letters.
- مجال الشركة:
- البناء والتشييد
- الدور الوظيفي:
-
الهندسة