Amr Ali Ali Sultan, Project Manager

Amr Ali Ali Sultan

Project Manager

MEPCO

Location
Egypt
Education
Master's degree, Risk Engineering Mangements
Experience
25 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 4 Months

Project Manager at MEPCO
  • Egypt - Cairo
  • March 2017 to July 2020

Project Manager for Integrated Construction for INFRA-STRUCTURE Networks: SEAWARAGE/WATER/IRRIGATION & ELECTRICAL MV/LV & Light Current/Telephone NW.

Construction Project Manager at ABC
  • Saudi Arabia - Riyadh
  • January 2014 to April 2016

As Project-Manager/ Main-Contractor responsibilities’ involves: Civil/Mechanical/Electrical-Power/ Electro-Mechanical/Automation; that includes nevertheless exclusively: Establishment of the project execution plan.
To include definition on project objectives and strategies, work scope, risk and opportunities, overall work plan and schedule, financial plan, quality and safety requirements, etc.
This will be consistent with the terms of the respective contract between CLIENT and ABC project execution plan mandatory contents.
• The administering of the contract agreements between CLIENT and ABC and its subcontractors whereby ABC and Client interests are protected and costs are managed.
• The maintaining of close contact with respective Clients throughout the project to ensure satisfactory reaction to client's needs or criticisms.
• The monitoring and control of project performance against budget, schedule, and quality and safety requirements using appropriate control tools and reporting of same to Client.
• Preparation of regular project progress and cost reports.
• Cost report to include the Earned Value Analysis with Forecast on completion.
• The identification of changes in the scope of work and ensuring that appropriate change requests are current and adequate.
•Promoting of quality and safety on the project in consultation with quality and safety representatives.
•Issuing of directions for Job close-out and the securing of the final project acceptance and contract release from client.
•Commitment to and promotion of CLIENT values and ensuring the realization of company and project health, safety, environmental, quality and ethics, systems, policies and procedures.

Senior consultant at ESBI
  • Bahrain - Manama
  • May 2012 to August 2013

As Senior Automation Engineer; for consultancy services to clients: (BanaGas- GPIC- Bapco- EWA- Tatweer- PDO), Job duties’ were:
Design & Review the specification for new Instrument/Automation systems.
Witness/Inspect testing for new upgrading SCADA/DCS/ESD systems.
Inspect & diagnosis for Plant/Systems technical problems.
Approve Method-Of-Statement for systems Handing-Over.
Check and Approve vendors’ standards with the universal standards.
Provide technical reports and studies for best performance operating condition and accidents if any.

Project Systems Engineer at Atlas Services
  • Egypt - Cairo
  • October 2012 to July 2013

ط Control (SCADA/DCS/PLC) in the field of Configuration/ Maintenance/ Implementation/ Administration support for Power-Station & Generation plants as Project-Team member for SCADA/EMS/PLC/DCS.
ط Participated in 5 systems as Control/Automation Engineer for the following SCADA/DCS/PLC systems:
I. ABB- Sweden: SCADA/SPIDER7.3; DCS/Freelance400; PLC/AC31/Midsize.
II. PML- Canada: PMS3.1; PEGASYS/PLC3720.
III. VALMET-USA- OASYS: SCADA/PLC:VER 5.3.1.
IV. AEG-Austria: GEATRANS, VER 2100.
V. AREVA-France: SCAD/EMP2.1.1/Habitat5.2.1; DCS/PACiS; PLC5000.
ط Participated in Design and Implementation as Internal Consultant in the companies, that I worked for in 3 projects for:
RFP: Request for Proposal.
FSD: Functional Specification Document.
CTD: Contractual technical document.
COTS: Commercial of the Shelf.
FAT: Factory acceptance Test
SPV: Signal point verification
SAT: Site acceptance test
CAD: Certificate Acceptance Document.
COMMISSIONING--AVAILABILITY.
ط SCADA/EMS/PLC/DCS Implementation and maintenance for a variety of international systems as applications, programs, OPC, Platforms, Protocols.
as System/Project engineer in control/Automation for various phase of SCADA/DCS/PLC Projects/Systems covering Installation/Modeling/Testing/Pre-commissioning/Commissioning, Pre-Startup test with administrative management with consultants and contractors and other sections internally.
ط Configuring SCADA/EMS/PLC/DCS Design/Utilizing the supplier Contractors packages and Consultants Specifications.
Practical-Technical experience in SCADA/EMS/PLC/DCS Maintenance of RTU/SCMS/MTU/FPGA; SDH/PDH in GS-US for Centers and plants while dealing with Operation and Maintenance Sections for the Process and Site/Field.
Technical Skills:
·Routers/Gateways/Switches/HUBS/FPGA: Setup/Installation/Configuration in the LON: Local Operation Network, PCN: Process Control Network.
·Industrial Ethernet Protocols: Analyze/Tracking/Configuring for MODBUS, PROFIBUS, FIELDBUS.

Water Control/Automation Engineer at KAHRAMAA
  • Qatar - Doha
  • July 2007 to February 2011

Water National Control Center; The responsibilities and accountabilities but not exclusively that was assigned to systemize & Automate the Proces Control of:
1- Water Desalination (Techniques/Methods) & Process Generation of potable water from sea.
2- Municipal Water Treatment.
3- Treatment of Water for Industrial Use.
4- Sewage Water Treatment.
5- Industrial Wastewater Treatment.

Instrument Automation Engineer at SEWA
  • United Arab Emirates - Sharjah
  • May 2004 to August 2007

SCADA/EMS- DCS/ESD for Main Control Center that Supervise/Control: Water Desalination Plants & Power Generation Stations. Include TFE from End2End via S/S and NCC.

Systems Engineer at UAE/ADWEA/TRANSCO
  • United Arab Emirates
  • June 1998 to October 2003

*Experience gained in the practical application Electrical/Water
/LNG Control Systems for Design/Operation/Maintenance phases.
*Strong & convenient know-how in Digital Instrumentation and
Control Equipments; Sensors/Transducers/Relays, control
Modeling/ Design.
*Burly sensible experience in Automation-Systems techniques from Universal-Station (US) to Global-Station (GS) Site/Field and Control techniques for Electrical Generators that are used Gas Turbines & Steam Turbines as supply:
*SMS: Safety Management Systems.
*ESD: Emergency Shutdown Systems.
*PSD: Process Shutdown Systems.
* Work as Project-Team member “Internal Consultant” in 3 projects that gain me 17000hrs Projects experience.
Work Qualities:
· Highly qualified Control/Automation Project-System Engineer for the Control Centers.
· Capable of doing many versatile jobs/tasks: SCADA/DCS/EMS/PLC: Maintenance &Development under Various platforms (e.g. UNIX/WINN2K/LINUX).
· Capable of Performing DBA role for Sybase & Oracle.
· Ability to do developing over SCADA/DCS/EMS/PLC using the standard Protocols IEC: FIELDBUS, PROFIBUS, MODBUS…etc.
· Ready to gain knowledge, absorb any new application and make use of such knowledge in achieving missions/tasks for different technologies in few weeks with aptitude of breaking the license time agreement of SCADA/PLC/EMS/DCS jobs/tasks.

Control Engineer at CETDC
  • Egypt
  • June 1992 to June 1998

SCADA/DCS/PLC Control Systems Engineer: I would like to apply for job: SCADA/DCS/EMS/PLC Senior Control/ Automation-System/Sytems Engineer.
*I’m Electrical Engineer specialized in Control Systems for Administration/Operation by using sophisticated S/W tools and Advanced H/W Equipments; currently working in NWCC/Kahramaa/Doha/Qatar as: Water Control Engineer; National Water Control Center using: (SCADA/DCS/PLC)
SCADA: Supervisory Control and Data Acquisition.
DCS: Distributed Control System.
EMS: Enterprise Management Systems.
ESD/LNG: Emergency Shutdown System/Liquefied Natural Gas. SIS: Safety Instrument System.
SMS: Safety Management System.
* I’ve received - Superior Trainings for: Automation Systems in:
- ABB Automation University, Vaster-as, Sweden- March 2000.
- VALMET Automation Company, Houston, Texas, USA- 1996.
- AREVA- Habitat/EMP -AREVA-France-Massy- 2005.
*I had been worked in:
SEWA: SHARJA GAS AUTHORITY as Control System Engineer for National Control Center of Gas (Transmission& Distribution)
ADWEA: Abu Dhabi Water Electricity Authority; National control center in TRANSCO.
CETDC: Cairo Electricity Transmission& Distribution Control Center for Electricity & Utilization; in similar position in Egypt I had worked in.
*My work experience ranges from the Maintenance/Operation&
Administration for the Control Networks (LON-GS-US) and its
Attached Devices and Equipment, in charge of Keeping up and
Managing the S/W Programs in the Control Center and the
Administration & Maintenance for SCADA/DCS/EMS/PLC
*ASIC: Application Specific Integrated Circuit.
*Strong practical experience in the RTU/SCMS/MTU/ SDH/PDH/F.O& Industrial Ethernet Protocols.
*My role involving providing knowledge specialist the
Development of Electrical Systems Applications in
Design/Operation and Specifications for New build Plants and
Support when the sites are in Project phases and after that.

Education

Master's degree, Risk Engineering Mangements
  • at Cairo University Faculty of Engineering
  • July 2013

Industrial Risk Engineering Management in Petrochemical Plants

Specialties & Skills

Controls
Windows 7
UNIX- WINNT (98:2003)- Oracle7- Sybase/Sql11
Modeling/Design/Programming
INFRASTRUCTURE Construction
Project Management

Languages

English
Expert
Arabic
Native Speaker

Training and Certifications

Experience- ESBI (Certificate)
Date Attended:
August 2012
Experience- Transco (Certificate)
Date Attended:
June 2004
Experience- CEDC (Certificate)
Date Attended:
June 1998
FAT (Certificate)
Date Attended:
March 2008
FAT (Certificate)
SCADA/EMS (Training)
Training Institute:
AREVA T&D
Date Attended:
June 2005
Duration:
300 hours
Certified (Certificate)
Date Attended:
March 1996
Valid Until:
July 1996

Hobbies

  • Swimming & Cyclying
    Local Ex-Champ in Egypt in 1991