Site Quantity Surveyor
NIRMAN CONSTRUCTIONS ,INDIA
Total years of experience :5 years, 11 Months
I have 5 year of experience in quantity surveyor and
Site engineer with NIRMAN CONSTRUCTIONS and
ARYACON CONTRACTORS AND ENGINEERS-INDIA.
Capable of doing Bill of Quantities and cost -estimation, Estimation of material quantities,
Calculate quantities of each major work items,
prepare quantity of concrete and steel, Calculate
quantity of road and railways.
Capable of doing Execution of work as per both
structural and architectural drawing, Experienced
in various projects such as Building work, Multi storey
Structures, Proper management of materials and
Workmanship, coordination with consultant and
Project manager regarding works and inspection,
prepare cross sectional and longitudinal section
of roads.
Capable of doing execution of work as per both
structural and architectural drawing,
Ensure quality of building materials concrete etc
through various tests.
Ensure that all the works are going with out wastage
of materials, Super vision for frame structures form-
work, steel work. Levelling survey of road prepare
cross sectional and typical drawing, experienced in
Construction activities like under grond tunnel-
Excavation, penstock pipe fabrication, construction
of power house. etc..