Freelance Interior Architect
Freelance
Total des années d'expérience :9 years, 9 Mois
• Led designs and directed project teams on multiple, complex projects through all phases from proposal through construction.
• Provided advice and consultation to clients on interior architectural matters.
• Coordinated with multiple disciplines, including base building architects, MEP Engineers and on-site construction personnel from start to finish.
• Executed the renovation of a 100-year-old religious building conserving its architectural style and history.
• Received an average 99% positive feedback from existing clients.
• Maintained a strict budget for each project and ensured timely completion without compromising on quality.
Achieved more than 5 villas for the royal family.
● Led and briefed 20+ design teams on concurrent live projects including
luxurious villas in UAE.
● Managed projects with the focus on staying on schedule, budget and
client/brand parameters.
● Mentored junior and intermediate designers.
● Built and grew existing client relationships.
● Networked and maintained good relationships with product vendors.
Executed a sport stadium and hall.
● Planned, developed, and implemented Urbanism and landscaping projects.
● Provided direction and support to the team in achieving the set targets and
objectives.
● Insured that activities implementation is on track, including developing and
implementing solutions as necessary.
Abdine - North Lebanon
Basic design plans for buildings, elevations and details, reflected ceiling
plans, millwork designs, furniture layouts, ergonomic dimensions, color
plans and schedules.
● Wedding events plans designed with fire retardant material used for walls,
ceilings and ground covers.
● Selection and preparation of materials and models for clients’ presentations.
● Assistance in information gathering relative to space plans and area
calculations.
Key Achievement: 6+ wedding events planned for the UAE royal family the Al
Nahyan at ICC ADNEC, Abu Dhabi.
1st Rank in class with an average of 86/100. ● Execution and Implementation, Mechanical and Electrical Systems. Industrial Design,
courses: 1st Rank in class with an average of 74/100. TRAININGS Safety and First Aid Training in the
Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.