anuraj pusushothaman, INSTRUMENT FIELD ENGINEER

anuraj pusushothaman

INSTRUMENT FIELD ENGINEER

SHELL

البلد
الهند
التعليم
بكالوريوس, INSTRUMENTATION
الخبرات
6 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 6 أشهر

INSTRUMENT FIELD ENGINEER في SHELL
  • بروناي دار السلام
  • نوفمبر 2011 إلى مايو 2015

Projects: Danau Bubut gas field development project phase1, Bulan Bulan project,
B2/3 Water flood project comprising of five well head platforms & two topsides production modules.
Seria Crude Oil Terminal (SCOT) & BLNG (Green field & Brown field)
Supervise and carry out the pre-commissioning and commissioning checks on C & A systems for Oil & Gas offshore and onshore facilities. In addition involve in verifying construction and mechanical completions of various subsystems and strictly adhering to construction & completions management systems (GO- CCMS)
QA/QC System knowledge, good understanding of QA/QC requirements for final documentation on oil and gas related construction projects
Involved in CTP development (commissioning test procedure)
Factory acceptance testing and Site acceptance testing on C & A systems
Participate in all the HSE inductions and trainings including HAZID/HAZOP
Witness pre-commissioning tests carried out by vendor’s packages like Biocide injection skid, OP corrosion inhibitor skid, OP demulsifier skid, OP scale inhibitor skid, WI scale inhibitor skid, MEG skid MPFM, PDHG, Corrosion monitoring system, Wellhead control panel, CO2 snuffing system and Orga solar systems.
Involved in CPRA and well tie-in activities
Functional test of process and safeguarding system and fire and gas system as per cause and effect matrix (ESD, PSD)
Control system Emerson Delta V (FFDCS, SIS & IPS) and SCADA

PROJECT ENGINEER في DOPET
  • قطر - الدوحة
  • أكتوبر 2010 إلى سبتمبر 2011

lInstallation & Commissioning of RTU (DATAC) well head control panel (PETRONASH), choke valves (Master Flow), 24V UPS and accessory Instruments in PS - 2. Wireless
Transmitters (Emerson) Installation & commissioning in PS-4 process platform. Interface with
the existing system and commissioning of the same. Ensure work is performed in
Accordance with project scheduled requirement, site survey, Coordinate with in -house
Engineering team for the preparation of engineering documents. Preparation of SPIR, close
out report and as built

SR . MANAGER في punjlloyd
  • الهند
  • أكتوبر 2008 إلى أغسطس 2010

Managing and leading team members, allocating resources among team members and implementing project as per scheduled deadlines. Team organization, role of each staff. Ensuring the material & manpower availability, advising in advance about any material short-falls and reporting to Project Manager. Monitoring work progress and ensuring quality work.

الخلفية التعليمية

بكالوريوس, INSTRUMENTATION
  • في IIME
  • يونيو 2010

INSTRUMENTATION

Specialties & Skills

Engineering
Commissioning
Instrumentation
Instrument Control
Pre-commissioning, commissioning and maintenance

اللغات

الانجليزية
متمرّس

الهوايات

  • Travelling, watching tv, cooking