Apolinario Bonilla Pau, Senior Electrical Engineer

Apolinario Bonilla Pau

Senior Electrical Engineer

ERGA Qatar

البلد
قطر - الدوحة
التعليم
بكالوريوس, Electrical and Systems Engineering
الخبرات
30 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :30 years, 3 أشهر

Senior Electrical Engineer في ERGA Qatar
  • قطر - الدوحة
  • يوليو 2011 إلى أكتوبر 2017

• Review and Approved Material Submittal, Shop Drawings, Method Statement, O&M Manual, and Material Delivery on Site.
• Monitor electrical works installation against design to ensure compliance and best practice.
• Response to request for information and clarification on the Project design and specification.
• Responsible for the construction effort through the supervision of electrical personnel of the subcontractor and site electrical engineers in assigned area of project.
• Coordinates subcontractor activities to ensure orderly and efficient completion of work.
• Provide support to H&S Officers on the site and reports temporary and permanent electrical installation works which are not safe and non-compliant.
• Supports the Resident Engineer/Project Manager to ensure timely completion against schedule and makes recommendations to increase resources to improve performance, where required.
• Provides inspection of completed work packages and recommendation of sign-off to the Resident Engineer/Project Manager.
• Builds and maintains a positive working relationship with the subcontractors and project stakeholders.
• Witnesses testing of all electrical installations including Transformers, Battery Charger, MV HV SWBs, Generators, DBs, Grounding, etc.
• Ensures subcontractors compliance with HSE and QA/QC Plans.
• Develops and ensures implementation/compliance with Project Quality Plan (PQP), Project Quality related procedures for document control, change control, material control/inspection and testing and material inspection and test plan.

Commissionig Engineer-Electrical في Al-Habtoor Leighton Group -Qatar
  • قطر - الدوحة
  • يناير 2011 إلى مايو 2011

• Execute the inspection, testing and commissioning of all Electrical equipments/systems in Package C2 includes Genset, UPS, CBS (Central Battery System), ATS, Transformers, Switchgear, MCC, Lifts, Dumbwaiters, etc.
• Preparation of Method Statement as per client requirement for the testing and commissioning of Electrical equipments/systems.
• Review of Approved Material Submittal, Method Statement, O&M Manual and Material Delivery on Site.
• Preparation and submission of Request for Inspection and Testing (RFIT) for all Electrical equipments/systems.
• Monitoring of submitted RFIT on KEO’s( Client Representative) approval or action required.
• Coordinates with KEO’s for the testing and commissioning activities.
• Assist/supervise/follow up supplier or vendor representative during the course of their scope for the testing and commissioning on the supplied equipments in accordance with approved method statements.
• Assist other disciplines for the interface testing of BMS.
• Conduct safety inspection on the energized Electrical equipments and ensure that they are in optimum operating condition.
• Update MEP Manager on the testing and commissioning activities as well as on the planned schedules to meet the required milestones.
• Assist in the As-built mark-up of Electrical drawing as per actual site installation especially with Electrical Switchboards/Panels.
Highlights:

Field Electrical Engineer في Worley Parsons Pte. Limited
  • سنغافورة
  • سبتمبر 2009 إلى أبريل 2010

• Supervision of project electrical construction works, which includes, installations, inspection and testing.
• Testing and Pre-commissioning of 132KV GIS Areva Swgr. and 33KV GIS Siemens Swgrs. Power Transformers 300MVA 230/132KV-143MVA 132/33KV, Gutor DC Chargers and UPS, Ametek Annunciator &other Substation auxilliaries.
• Ensure that contractors comply with all aspects of the Worksite HSE Plan and policy; site regulations, permit to work and Client requirements.
• Maintain daily supervisory surveillance checks and records ensuring that contractor’s management and supervision are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets.
• Ensure the electrical works complied with project specifications, company procedures, method statements, quality assurance and control documents.
• Ensure proper change control by issuing Field Instructions for all changes, reviewing Technical Queries to ensure responses are appropriate and practical, and reviewing Advanced Revision notices prior to issue to contractors to ensure correct use of construction resources.
• Provides input for contract change orders, submittal responses, and RFI responses.
• Ensure contractors dimensional control methods for checking that the works are properly set out. Supervise specialist for its testing activities on Electrical equipments as per approved SAT procedures.
• Ensure practical security and protection of the works and that all contractors’ provisions for temporary plant are fit for purpose.
• Ensure that all construction materials, embedded items, special fixtures are approved for use and that they are stored, protected and available to workplace locations as required.
• Ensure that work is carried out in accordance with the agreed method statements.
• Ensures the development and maintenance of AS-Built drawing records
• Conduct surveillance on Electrical works and Testing, and issued NCR, Quality observation report, corrective action report if required to assure high quality standard on the workmanship are maintained.
• Interacts closely with Contractor’s field personnel to resolve field issues.
• Assures that the work conforms to approved Engineering drawings in all areas and initiates action to prevent, stop or correct the occurrence of quality control deficiencies, defective work, or deficient reports.
• Prepare and verify implementation of all field engineering procedures.
• Liaise with subcontractor QC and Client Rep. for the completion of the Test package and other QC documents.
Highlights:
• Completion of SAT for the Substations and its interfaces to be ready for Energization.

Electrical PMC Supervisor في Chiyoda-Technip Joint Venture
  • قطر - الدوحة
  • أبريل 2007 إلى مايو 2009

• Responsible for the ABB MNS LV Switchgear Vendor for the modification works on LV modules control circuit wiring change to suit DCS start and permissive to start requirement.
As well as other modifications as per project and client requirements.
• Responsible for the inspection and checking of interpanel wiring as well as switchgear modules outgoing connection.
• Supervision for the testing and pre-commissioning of AREVA & Siemens, ABB Switchgears, Testing of GE Multilin Relay, Siemens Siprotec Line Differential Relay, ABB REF 542 and Siemens LVMCC Simocode, ABB Insum HMI.
• Responsible for GUTOR UPS, Battery Charger (Redundant Supply) commissioning works, including battery charging and discharging.
• Responsible for the pre-commissioning/commissioning activities of all Electrical Equipments in respect of safety, quality schedules and cost.
• Ensures that sub-contractors follow procedures and works to approved method statements, schedules and requirements.
• Signing and authorizing work permits if required.
• Responsible for the preparation of vendor schedule of works, monitoring and evaluating their progress.
• Responsible for the review and implementation of Project ITP’s and Specifications.
• Witness point and supervision for the box-up of all major Electrical equipments in the Sub-station to be ready for energization.
• Supervise the motor solo run test activities of LV and MV motors.
• Interface testing with ELICS, ( SCADA), DCS.
• Liaise with subcontractor QC for the completion of Inspection Test Records.
• Prepare punch list.
Highlights:
• Mechanical Completion Certificate issued by the Client Repesentative.

Resident Engineer/ Electrical Engineer في SNC -Lavalin Gulf Contractors L.L.C.
  • الإمارات العربية المتحدة - أبو ظبي
  • ديسمبر 2005 إلى فبراير 2007

• Responsible for the review of project specifications and material submittals.
• Supervise the performance of sub-contractors to ensure the respect of work’s standards, specifications, schedule and budget.
• Technical supervision of Site Inspectors.
• Responsible for the management of field technical documentation systems and staff.
• Responsible for the quantity surveys of construction works as per sub-contractor progress/accomplishment.
• Formulating, surveillance, monitoring, supervising and implementing overall Subcontractor construction Inspection Test Plan -Electrical Works.
• Establishing proper compilation of all Inspection Quality control documentations.
• Spearheading all sub-contractor construction works and inspection quality control activities thus ensuring the plan schedule are strictly met.
• Ensuring operational readiness of all equipments as per project scope for its commissioning phase.
• Witness all the testing activities as per project requirements i.e. start-up and commissioning.
• Review and update project drawings - Red marking if required.

Highlights:
• Enhanced and establishing quality procedures and standards on subcontractor installations works thereby decreasing punch list items after completion of construction phase.

Project Engineer في M.S.Al-Suwaidi Industrial Services Co. Ltd.
  • المملكة العربية السعودية - الجبيل
  • أكتوبر 2002 إلى نوفمبر 2005

• Project Management and Implementation.
• Assist with management of external and internal third party interfaces.
• Interfacing with sub-contractors and vendors for Equipments’ inspections and its recommended construction installations.
• Prepare all pre-commissioning procedures and schedules of all electrical equipments i.e.
MV Switchgears, MCC’s, switchracks, pad mounted Distribution Transformers, LV motors, UPS, Fire Alarm System and other equipments installed in the project.
• Responsible for the commissioning of electrical Equipments, includes underground pipe cathodic Protection using sacrificial anode (Magnesium Anode).
• Implementation of Inspection and Test Plan-QC/QA as per Saudi Aramco Standards and Procedures and other relevant International Codes&Standards applicable to the project.
• Coordination with other Engineering Disciplines-Civil, Mechanical, Electrical & Instrumentation for proper work implementation as per IFC and Project Specifications.
• Attend weekly coordination/review meeting for the project work accomplishments and problems arises for work execution which includes Safety, QA/QC activities, materials
updates and submittals.
• Liaised to coordinate activities with Saudi Aramco PMT on the closing out of YES and No Punch lists items.

Unit Engineer في Saudi Electric Company
  • المملكة العربية السعودية - جازان
  • يوليو 1999 إلى يوليو 2001

• Over-all in charge of all operation and maintenance of 33/.230KV Distribution Network and Operation of Electrical Power Sub-Station (Gas Insulated Switchgear GIS 132/33KV) includes transformer inspection, load check, augmentation and maintenance etc. in area of jurisdiction.
• Preparing/Making proposal and site survey of High Tension 33KV, Low Tension .230KV Extension Works, includes load computations, voltage drop calculations, and meter capacity requirements for all types of consumers- government establishments, commercial, industrial and residential.
• Making Weekly/Monthly Report on the operation and maintenance work of Distribution Network as reflected from the proposed projected planning for the year and new extension project initiated from the network.
• Supervise contractor to implement correct and approved company’s specifications for the extension works initiated from the network.
• Project Management and implementation.

Emergency /Communication Engineer في Electricity Corporation
  • المملكة العربية السعودية - الجوف
  • مارس 1985 إلى مارس 1997

• Inspection for the operation and maintenance of primary and secondary distribution network (H.V. & L.V. 13.8/.230 KV with 132 KV Transmission Lines.
• Survey of consumer loads, meter installations and trouble-shooting of consumer complaints on power system.
• Testing of KW-Hr. meter with connected loads.
• Supervise line construction of HV & LV Distribution Network.
• Operation of 132/33/13.8 KV GIS Sub-Station.
• Operation, maintenance and testing of PLC (Power Line Carrier) RTU (Remote Terminal Unit) and SCADA.
• Operation 3MW &10 MW Power Plants.
• Exposure in the Generation, Transmission and Distribution of Electrical Power System.

Electrical Engineer في Hoshanco Construction Division
  • المملكة العربية السعودية - الرياض
  • أكتوبر 1981 إلى أكتوبر 1983

• Supervise and inspection of Electrical Installations:
a. Low and High Voltage Cabling Works-Underground System.
b. Building Electrical Installations as per approved construction drawings and specifications.
c. Fire-Alarm System Installations-Design and Commissioning using SIEMENS type plug-in modules for SRS 2, SRS 6, and SRS 20.
• Implementation of QA/QC activities on all Electrical Works.
• Monitoring/quantity survey of sub-contractor work accomplishments and ensuring plan schedule are strictly met.
• Assisting in the preparation of BID Documents.
• Assigned as Maintenance Electrical Engineer-King Khalid Military Academy, KKMA, Riyadh K.S.A.

الخلفية التعليمية

بكالوريوس, Electrical and Systems Engineering
  • في Mapua Institute of Technology
  • مايو 1980

Specialties & Skills

Electrical Engineering
Project Management
Communication Skills
Project Management, Construction, Inspection and Commissioning

اللغات

الانجليزية
متمرّس

العضويات

Institute of Integrated Electrical Engineers
  • Life Member
  • January 2001

التدريب و الشهادات

Certificate of Completion (الشهادة)
تاريخ الدورة:
July 2012
صالحة لغاية:
August 2012