Araby Ezzelregal , PMP, PMI-RMP, Director of Projects & Executive Committee member

Araby Ezzelregal , PMP, PMI-RMP

Director of Projects & Executive Committee member

Alghanim International

Lieu
Koweït - Al Ahmadi
Éducation
Baccalauréat, Mechanical Engineering
Expérience
35 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :35 years, 10 Mois

Director of Projects & Executive Committee member à Alghanim International
  • Koweït - Al Ahmadi
  • Je travaille ici depuis décembre 2015

• Manage major Oil & Gas projects (over 500 M$).
• Utilized exemplary negotiation skills to obtain manufacturing service agreements and assure quality standards.
• Defined clear targets and objectives and communicated to other team members.
• Reduced workflow inconsistencies by recruiting and hiring capable staff members.
• Evaluate suppliers by assessing quality, timeliness, and compliance of deliveries to maintain tight cost controls and maximize business operational efficiency.
• Manage scope changees

Manager of Projects à HOT Engineering & Construction Co.
  • Koweït - Al Ahmadi
  • Je travaille ici depuis février 2001

WARA pressure maintenance project which include:
-Fabrication and erection of 800, 000 Inch Dia. Of different material
-Steel structure (pipe rack, pipe support) 3200 Ton
-Equipment installation and alignment (pumps, compressors, chemical injection package, different vessel and drums).
-About 25, 000 M3of concrete for Control building, substation, VSD building, tank foundations and tank bund wall, pipe rack foundations, pipe sleepers, duct bank, cable trench.
CLIENT: KOC
PMC : WORLEY PARSONS

Manager of Projects à HOT Engineering & Construction Co.
  • Koweït - Al Ahmadi
  • juin 2011 à septembre 2012

Installation of low supphur fuel oil (LSFO), FG and GAS Oil Pipelines from MAA to Sybiya and Doha Power stations-pipeline work -Portion 245 KM length (48" & 24")
CLIENT: KOC
PMC: FLUOR

Manager Of Projects à HOT Engineering & Construction co
  • Koweït - Al Ahmadi
  • janvier 2010 à juin 2011

Manager Of Projects (Oil & Gas)
Managing, coordinating &Controlling projects and participating in reviewing Oil and Gas proposals.

Project manager à HOT Engineering & Construction Co.
  • Koweït - Al Ahmadi
  • octobre 2007 à décembre 2009

From Oct.2007 to December 2009
Project manager
Replacement of 9 crude oil filling lines which includes
Installation, construction, pre-commissioning, taking over, assistance in commissioning and performance tests, and remedy of defects, of the following new Facilities (50 KM of pipelines different sizes 30", 34", 36"&48"): Installation of crude oil filling pipelines between the CMM and the North Tank Farm (NTF)
-Installation of crude oil filling pipelines between the CMM and South Tank Farm (STF)
-Installation of new pipelines between ADM and CMM (X1 and Y1) and STF FM to the CMM (P) and NTF to CMM (NK1)
- Demolition and removal of various redundant filling pipelines, piping and associated redundant facilities, which shall begin once the new Facilities are fully operational

Construction Manager à HOT Engineering & Construction co
  • Koweït - Al Ahmadi
  • janvier 2003 à décembre 2006

CLIENT: KOC
2003- 2006
Construction Manager
VSM Driven crude transit pumps at 11 GC's-South-East Kuwait (Major Projects) which includes:
• The scope of the project is to provide new crude oil pumping facilities at eleven Gathering Centers in South East Kuwait for Kuwait oil Company, namely Gathering Centers 1, 2, 3, 4, 7, 8, 9, 10, 19, 21&22.
• The new pumping facilities consist each of a new crude oil booster pump with a fixed speed electric motor drive and a new main oil line pump with a variable speed motor drive.
• All the piping, cable works, and associated instrumentation &controls are also provided.
• The tie-in to the new pumping facilities is taken from the existing suction line and the tie-ins for new main oil line pump discharge line is tied into the existing pump discharge line with modifications as required.
• All the tie-ins for process, utilities, instrumentation and control, etc., that are required for the new pumping facilities are taken from the existing facilities.

Project Manager à HOT Engineering & Construction Co.
  • Koweït
  • janvier 2001 à janvier 2003

CLIENT: KOC
PMC: FLUOR

2001 - 2003
Project Manager
• Upgrading of existing brackish water network in Magwa area for Kuwait oil company in south east fields at Gathering Centers 9, 10, 20&22 which includes underground piping works 36 KM and connections to 9 tanks -FRP&CS material-and 18 main road crossing
• Restoration works to enable operating CDU-3 for next 15 years in MAA refinery for Kuwait national petroleum company. The scope of the project is to replace 26 nos. of pumps and related piping, foundations, power and control cables&their motor control stations including erection, testing precommissioning and commissioning assistance.

Project Manager à Kharafi National
  • Koweït
  • septembre 1997 à janvier 2001

Project Manager
• Natural gas distribution network in 6 October City, Egypt which include distribution, external and internal installation & conversion, for domestic and industrial areas
Snr. Engineer

• Central sea water injection pipeline, North Kuwait for Kuwait oil company, which includes underground piping works approx 105 KM, two plants piping at Subiya and Rawdatain & 32 Nos. wellhead connections.
CLIENT: KOC
PMC: WORLEYPARSONS

• Improvements to vapour de-hydration units at booster stations 130, 140, 150 & 170 with Kharafi national and its JV Costain oil, gas and process of UK for Kuwait oil company.

Construction Manager à PETROJET
  • Egypte - Alexandrie
  • août 1989 à septembre 1997

Construction Manager

• Aburdes-Wadi Ferran crude oil pipeline 12" Dia 32 KM length (U/G) for Petroleum Pipelines Co. (PPC)
• Improvements to pump stations and connections between pumps and 10 tanks for Petroleum Pipelines Co. (PPC)
• Dahshour - Elkoriamat gas pipeline 22" Dia 95 KM length (U/G) for Petroleum Pipelines Co. (PPC)
Construction Engineer
• Zafarana-Elkoriamat gas pipeline 18" Dia-165 KM length (U/G) for Petroleum Pipelines Co. (PPC)
• Extension of Suez refinery for Nasr Petroleum Co. (NPC)
• Duplicate of 16" Dia. gas pipeline 190 KM length (U/G) for Petroleum Pipelines Co. (PPC)
• Fabrication and installation of distillation and gas recovery units of Suez refinery for Nasr Petroleum Co. (NPC) with production capacity of 2.5 Million tons / Year.
• Ainelsokhna-Abueldarag (16" & 26") pipeline - 35 KM length (U/G) for Petroleum Pipelines Co. (PPC)
• Rasgara-Petreco pipeline 10" Dia. 105 KM. Length (U/G) for Petrobel Co.
• BED. 3 development and gas treatment plant for BAPET Co.

Mechanical Engineer à Ministry of DEFENSE
  • Egypte - Le Caire
  • janvier 1988 à janvier 1989

1988 - 1989
Ministry of DEFENSE, EGYPT
Mechanical Engineer

• Pre-fabricated buildings factory during Military service

Éducation

Baccalauréat, Mechanical Engineering
  • à Zagazig University
  • mai 1987

Zagazig University, Faculty of Engineering, B.Sc. in Mechanical Engineering, 1987.

Baccalauréat, Design And Mechanical Engineering
  • à Zagazig University, Egypt
  • mai 1987
Baccalauréat, Design And Mechanical Engineering
  • à Zagazig University
  • mai 1987
Baccalauréat, Design And Mechanical Engineering
  • à Zagazig University
  • mai 1987
Baccalauréat, Mechanical Engineering
  • à Zagazig University
  • mai 1987
Baccalauréat, Mechanical Engineering
  • à Zagazig University
  • mai 1987

Specialties & Skills

Gathering
Installation
Crude Oil
Commissioning
Manager of Projects
FABRICATION
GAS PIPELINE
PETROLEUM
PIPELINE
Manager of Projects
PROPOSALS
REFINERY
Staff Management • Flexible and Adaptable• Project Management• Teamwork• Multitasking abilities•

Langues

Anglais
Expert

Adhésions

PMI
  • PMP, PMI/RMP
  • December 2011
Project Management Institute (PMI)
  • Member
  • March 2012

Formation et Diplômes

Incompressible flow (Formation)
Institut de formation:
AUC
Date de la formation:
October 1991
Project Management Professional PMP (Certificat)
Date de la formation:
March 2012
Valide jusqu'à:
March 2018
Cathodic protection and industrial measurements (Formation)
Institut de formation:
American University in Cairo (AUC)
Date de la formation:
January 1991
Risk Management Professional (PMI-RMP) (Certificat)
Date de la formation:
September 2014
Valide jusqu'à:
August 2017
Design and construction of pipeline (Formation)
Institut de formation:
AUC
Date de la formation:
January 1991
Valve selection and installation (Formation)
Institut de formation:
AUC (American University in Cairo)
Date de la formation:
January 1991

Loisirs

  • Reading,swimming & football