Senior civil engineer
Parsons - Qatar
مجموع سنوات الخبرة :12 years, 6 أشهر
Qatari Diar /
Lusail city building permitting, development and planning department
• Current is (DSTPS) -Design and build Doha South Terminal Pump Station and Regional Odor Control Facility as QCE Structural Engineer and Zublin Strabag as main contractor under Stantec supervision, ASHGAAL as a Client
• AlMozoon Towers 4 (5-Star hotels) TOWERS owned by GRECO (5B+G+46- 40-35-26) in Al-Dafna (full time since October 2016- Started While reaching Cutoff level of piles heads)
• AlBeema Offices (2b +G +3) building @energy city (Enabling Works) (full time).
• Place Vendome (Huge 260000 sqm foot print Mall (2B +G+4) and 3 Hotels (2B+G+12) & Entertainment City project) (full time Started since start of enabling works until finishing structural package- since July 2014) in Lusail-Qatar
• Villaggio Mall (Land lord Area & Retails renovation (Luxury Retails: Gucci, D&G, CD, Louis Vuiton, Billionaire, Mui Mui..etc, and Retails at Sport Street :Adidas, reebok, Mango, Zara.. etc) and rehabilathion to QCDD and NFPA requirements, Fire affected area renovations, New Extension construction Project) (full time).
• Land Mark Mall land lord area full QCDD assessment to all existing corridors and Services (full time).
• AlManaa Square (2 residential and 2 commercial 2b+G+7 towers) (Reliever).
• Lexus Showroom (enabling works) (Reliever).
• 24 villa compound (M.S.H.) project (Reliever).
• Les roses (130) villa project (Reliever).
• Offices building in Fereej bin Imran (2b+G +3) (Reliever).
• General Duties :
Performing Work Inspection Requests as per shop drawing and according to IFC drawings, Specs, Project documentations and prevailing codes.
Reviewing shop drawings and material/document submittals.
Reviewing site daily reports issued by the contractor.
Facilitates the contractor implementations of work by leading his steps to avoid defects/obstacles thru approved Method statements
Providing senior with up to date progress Report and states on site.
Reviewing Quantities and progress monthly implemented by the contractor.
Reviewing Method statements according to QCS, Projects Specs and prevailing Codes
Guiding contractor thru compliance to Local building regulations and prevailing Codes (ACI315, ACI318, QCS 2014, NFPA and QCDD Requirements).
Issuing site observations reports and non-conformance reports if needed while daily site monitoring.
project hotel (hilton standards) sinyar tower 2 G+1G+ 52 floor
governmental secondary school for boys : school with multiple services
training @ world trade center Qatar tower 4 basments + 50 floors