Head of the Construction and Geotechnical Department at Civil, Marine & Coastal Engineering Office
Contractor Consultant for Gharably Integrated Engineering Company
Total years of experience :11 years, 4 Months
NEOM SINDALAH ISLAND-BREAKWATER
Project details
The project is a steel platform that serves as a supply road to transport the building materials needed for the SINDALAH Island project, which is the first of its kind in the Kingdom of Saudi Arabia. It also works as a floating breakwater to disperse the energy of waves coming from the Red Sea so that it does not affect tourism activity.
The structural system of the platform is a steel structure represented by metal pipes connected to a group of intersecting steel beams and connected through special connections designed specifically for this unique project.
Office scope in the project:
• Redesign the platform
• Design of the connections
• Quality control and supervising
Leading the designing review team, shop drawing team, and team as the contractor’s technical manager
NEOM Jetty to Ras Gasbah
The project scope includes:
The detailed design and construction of a new piled jetty (access trestle and loading platform) and its associated mooring equipment and fenders to allow the loading/unloading of vehicles and barges with materials for the construction of Shushah Island. The loading platform will also be used to load and unload staff via a passenger ferry. The subsequent demolition of the structure after 10 years of use.
Office scope in the project:
• Redesign the platform
• Design of the connections
• Quality control and supervising
• Prepare method of statements
• Prepare a steel shop drawing by TEKLA STRUCTURE
Leading the designing review team, shop drawing team, and team as the contractor’s technical manager
ABO-QIR PORT EXPANSION
Project details
1. 8800 m length rubble mound breakwater.
2. 160 million cubic meter of reclamation soil.
3. 6250 m length composite section Quay wall of tubular and sheet pile front wall with relieving platform backyard
4. 600 m length concrete blocks Quay wall
As the project type is “design and built” my role started early on with concept design of the project, then after the getting the result of soil type from bore holes, coming up with consent of design principle, and submitting those documents with the project designer (COWI), reviewing all the design stages and documents with our designing team, then submitting the design primarily to the engineer and reviewing their comments. As for construction I led the team for the project’s shop drawings, and managed the quality control team on site and arranged all interactions between designing team, quality control team and construction team assuring the best construction method.
CONSTRUCTION OF FORTY WEST (SWARY)
Project details
• Project land area 58105 m2
• Shoring system
Technical office work
• Design review for the project component
• Shop Drawing for the project component
(Foundation & SOG & Retuning wall and
Columns &Beams and slabs)
• Planning, analysis, design and supervising
For shoring system
Scope of work
The project required geotechnical studies to confirm the viability of the design, as the contractor’s technical manager, I led a team of geotechnical engineers to prepare the soil studies and produce the final report with recommendations of necessary design variations, then held meetings with the project’s engineer clarifying the variations and supervising on making the required geotechnical models and construction models, discussing the cost impact of the variations with the employer, as for the construction stage I led the shop drawing team and arranged with the construction team the method of construction and managed the quality control team on site.
Terminals (55-62) Berths in Alexandria Port-Egypt GIECO Company
• Supervised Reclamation Works and Soil improvement (PVD, VIBRO COMPACTION(VC), RAPID IMPACT COMPACTION(RIC))
• Supervised Quay wall Substructure (Diaphragm Walls, bored pile, and Barrette)
• Supervised Quay wall Superstructure (slab, TR Beam, front beam, and back beam)
• Supervised installation accessories (Bollard, fender)
• Supervised installation of crane accessories (tie down stow pin and rail)
Quality Control Engineer at Construction 3-JULY Naval Base GIECO Company
• Supervised Sporting Buildings, Hotels, and Villas, Watch Towe, Cinema)
• Supervised Finishing Works (Block works, Isolation, Plastering Works.)
• Supervised High-Level Finishing (Timberworks, Aluminium Works, Cladding, and Curtain Wall).