Armin David, Senior Engineer

Armin David

Senior Engineer

SIEMENS Ltd

البلد
الهند - جورجاون
التعليم
بكالوريوس, Electrical Engineering
الخبرات
17 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 0 أشهر

Senior Engineer في SIEMENS Ltd
  • الهند - جورجاون
  • أشغل هذه الوظيفة منذ يوليو 2011

Project worked:
1) 400/132/66/33/11kV GIS S/S - Qatar Projects Phase 13 expansion .
2) 400/132/66/11kV GIS S/S - Qatar Projects Phase 12 expansion.
3) 220/132/66/11kV GIS S/S - Qatar Projects Phase 11 expansion.
4)132/66/11kV GIS S/S - Qatar Projects Phase 10 expansion.

Job responsibilities:
1) Checking and review of layout drawing for approval.
2) Grounding design calculations using SES CDEG software.
3) Key SLD, LVAC and LVDC SLD preparation.
4) Battery, Charger, UPS and LV Cable sizing document.
5) Transformer adequacy check using ETAP software.
6) CT/ PT adequacy check document.
7) Transformer adequacy check using ETAP software.
8) Power & control cable schedule and Routing in excel sheet along with cable tray sufficiency check.
9) LVAC and LVDC breaker coordination curves along with breaker setting for Protection Coordination.

Achievements:
1) Received Puraskaar reward ‘Winner of the Quarter’ in Q3 of 2013-14 for optimized battery size resulting in saving of 190, 000 Euros for phase-11 Qatar project.

Executive Engineer في ABB Ltd
  • الهند - فريد اباد
  • يونيو 2007 إلى يونيو 2011

Projects Worked:
1) 400/220kV GIS S/S - Chamera project (customer - PGCIL).
2) 33/11kV Indoor S/S - Delhi University project (customer - NDPL).
3) 220/132/33kV S/S - Chormar, Dudhianwali, Kurangawali & Khairkan (customer - HVPNL).

Job Responsibilities:
1) Substation Key SLD, LV SLD, Plan and Section layouts.
2) Electrical clearance and Erection key diagram.
3) Indoor and outdoor Earthing layout.
4) Conductor sag tension calculation document.
5) Indoor and outdoor Cable Trench layout along with Panel arrangement.
6) Indoor and outdoor Lighting calculation and layout.
7) Direct Surge Lightning Protection (DSLP) calculation document and layout.
8) Equipment Ordering Datasheet, Selection & Quantity estimation - The major electrical equipment handled are Power Transformers, Reactor, Circuit Breakers, Instrument Transformers, Isolators, Surge Arrester, Bus Post Insulator, D.G. Set, Battery & Battery Chargers.
9) Review of vendor and civil consultant drawings for approval.
10) Vendor offer evaluation - Technical.
11) Technical Coordination between the client requirements and vendor specifications.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في National Institute of Technology, Hamirpur
  • مايو 2007
الثانوية العامة أو ما يعادلها, Science
  • في Delhi Public School
  • يناير 2002

الثانوية العامة أو ما يعادلها, General
  • في Delhi Public School
  • يونيو 2000

Specialties & Skills

Microsoft Office
Grounding
Electrical Engineer
Transmission
LAYOUT DESIGN
CABLING
AUTOCAD
AutoGrid Pro
CUSTOMER RELATIONS
MS Excel
CONSULTING

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
التاميلية
مبتدئ

التدريب و الشهادات

Power System grounding and Electromagnetic Interference (الشهادة)
تاريخ الدورة:
February 2017
CDEGS Level I Exam (الشهادة)
تاريخ الدورة:
February 2017

الهوايات

  • Cycling, Skating
    200km Brevet Randonneuring