Lead PCS Engineer
KGNT LLP
مجموع سنوات الخبرة :11 years, 2 أشهر
Prepared documentation for State Review for the feasibility study;
Reviewed project documentation for compatibility and deviation from the local Kazakhstani standards
Prepared documents for the project:
Loop Diagram
Cable Schedule
Instrument Datasheets
MTO
BOM and others
Responsible for developing project deliverables
Coordinated and cooperated with other disciples to provide efficient solutions
On March 1st 2021 Air Liquide became the owner of six units of (Nitrogen and Hydrogen) in Atyrau Refinery Plant.
Investigated interlocks after take over on Yokogawa DCS (Centum VP) and ESD (Prosafe-RS)
Conducted analysis of architecture and infrastructure of industrial automation systems (SCADA/DCS) in terms of cyber security;
Wrote communication procedure between Instrumentation and F&G constructor, and Air Liquide;
Provided support to MOC (management of change) in design, implementation, Operate and Maintain;
Planning and scheduling daily and weekly works for the contractor
Creating PR on the spares for the critical valves and instrumentation;
Created the list of critical valves and instruments according to the process requirements;
Collaborated on the MOC for DCS migration planning;
Responsible for the successful turn-around of the Unit 3212 such as calibration and troubleshooting (instrumentation part)
Developed preventative maintenance plan for the upcoming year.
• Created layout drawings of instrumentation and electrical cable
• Created instrument layout including F&G
• Prepared instrument datasheet, cable schedule. Cable datasheet (electrical and instrument)
• Created cable racking layout
• Development of (АТХ - project section on automation of production technology) according to GOST 21.408-2013 in AutoCad for Pig Laucher and Pig Receiver for Gas Pipeline in
• Development of SCADA (visualisation in WinCC v7.4), including faceplates in C programming language
• Development of PLC control logic in Tia Portal v15 for SIEMENS S7-1200 controller
• Created Alarms, Trends, user policies according to customer specifications;
• Commissioning of the system
• Prepared documents for tender
• Calculated number of equipment needed for project including cables (electrical, instrumental)
• Responsible for trouble-free operation of the I/A System (Foxboro DCS) in OPF Karabartan including network switches (Enterasys & Hirschmann which are resposible for operation of Safety Lan and process network) whitch is a part of Safety Instrument System (SIS)
• Troubleshooted fiber optic network
• Wrote and modified scripts in Python, VBS, VBA to install software, update antivirus databases, retrieve data from Matricon
• Modification of the access control list, server administration, network administration, system recovery and backup
• Managed and maintained Windows Servers 2008 R2/2012
• Knowledgeable and able to use of the HSE rules and procedures in H2S operational environment
• Oversee quality system implementation and daily operations
• Conceptualize production improvements including equipment fixtures and tooling
• Wired up test panel for FAT
• Reviewed, modified and troubleshooted vbs scripts in order to deliver process reports in format that Control Room Supervisor requested
• Attended ICND1 and ICND2 courses in Almaty (Cisco CCNA) Pearson VUE Certified Center
• Working on after sales support services and providing technical back up
• Assisting customers to select the right instrumentation/automation equipment and software such as proper field devices (design and configuration, such as material that will be resistant to corrosive elements)
• Troubleshooting and inspection of the instrumentation equipment such as flowmeters, level transducers in the event of malefaction
• Troubleshooting Profibus network for errors
• Providing pre-sales technical assistance and product education
• Provide advice on technical solutions and benefits
• Consulted clients including project institutes in Aktau regarding company products and features they provide.
• Pre commissioning and commissioning of cement plant
• Took an active part in the FAT test
• Inspected and tested control signals
• Installed new control instruments
• Inspected and troubleshooted: level sensors, pressure sensors, belt misalignment switches, pull cord switches, frequency converters, electrical connections, control valves
• Tested working project of Siemens PCS 7 for interlocks using LAD, STL and CFC languages
Worked at OPZ and IB-MOA sites or maintenance of HVAC systems including Flame Scanners, Pressure detectors, Thermometers, Flow sensors and others and automating the process of control.
• Troubleshooted and repaired PC hardware and peripherals, network problems such routers and switchers
• Fixed network problems, reimaging computer software’s, printer services, troubleshooted school equipment
• Assisted to provide services to professors and students with their daily needs such as printing, password reset, provided temporarily printing passes, fixed computers and projectors
• Quickly became familiar with VMware vSphere ESX product and features to run concurrently Linux and Windows Server
• Consulted about products availability and function to fit the company needs
• Designs, installs, configures, and maintains operating system servers in support of business requirements
• Administered Windows Active Directory
• Monitored and tuned the system to achieve optimum performance levels
• Worked in group of 5 people to create an innovative mobile applications
• Collected and analyzed data on customer demographics, preferences, needs, and buying habits to identify potential markets and factors affecting product demand
• Measured and assessed customer and employee satisfaction.
The program gives students an in-depth skill base in networking tools and problem solving practices. Students learn how to troubleshoot software and hardware problems by using proper software and hardware tools such as voltmeters, wireshark, network analyzer and other tools. They also learn how to configure cisco routers and switchers, how to use CLI to to create routers and switchers configurations.