armin riahi, Maintenance Manager

armin riahi

Maintenance Manager

Peka chemie

Lieu
Iran - Tehran
Éducation
Master, Chemical Engineering
Expérience
14 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 2 Mois

Maintenance Manager à Peka chemie
  • Iran
  • Je travaille ici depuis juillet 2023
Maintenance manager à Golnan Puratos
  • Iran - Tehran
  • septembre 2021 à juillet 2023

Maintenance Manager at Golnan Puratos
Responsibilities:
• Allocate workload and supervise upkeep staff
• Monitor equipment inventory and place orders when necessary
• Monitor electrical and hydraulic systems of facilities to ensure functionality
• Plan and oversee all repair and installation activities
• Maintain maintenance logs and report on daily activities
• Ensure that designated buildings, plant and facilities are fit for purpose and to provide
proactive support/solutions when required
• Ensure health and safety policies are complied with
Impact
• preventive maintenance program established
• waste water treatment modification
• AHU (air handling unit) modification
• Subzero industrial chiller modification

Senior Ammonia refrigeration technical manager à Mihan ice cream and dairy company
  • Iran - Tehran
  • janvier 2017 à septembre 2021

DUTIES AND RESPONSIBILITY:
1. installation ammonia plant, operation and maintenance (GEA compressor)
2. ice bank, cold storage, cooling tower, operation, servicing and maintenance
3. trouble shooting, repairing and maintenance of all doors in factory(sectional doors,
high speed doors and cold storage doors)
4. supervise 8 technician maintenance team and 2 supervisor
5. responsibility of external units servicing, lubricating og all moving parts, checking and
adjustment of the all drive belts and drainage line
6. responsibility of spiral cooler (SCANICO)
7.responsibility of yogurt incubator in yogurt production hall
8. responsibility of Freon unit located in R&D cold storage
9. in-depth knowledge of refrigeration systems
10. recycle and change refrigerant
11. complete preventative maintenance on refrigeration systems and their stations
12. retained careful and thorough maintenance and repair records
13.disassembled units, repaired broken components, and restored them to operating
condition
14.assessed the accuracy of HVAC and refrigeration PM procedures and gave feedback
to management
15. responsible for ensuring the safety, integrity and reliability of equipment
16. responsible for ensuring that all equipment is maintained completely
17. requirements of all machinery are being followed, ensure that each employee is
working sate and following company safety policies
18. manage 10 staff and 2 supervisor
19. preparing daily 20 cold storage temperature and condensers water consumption
report to chief engineer
20. coordinates the effort of electrical, mechanical, plumbing and/or other supporting
trades personnel in the installation of projects/renovations
21. ensure employee are properly trained, analyze and resolve problems or assist
workers in resolving problems. provide coaching and feedback to workers

Executive Chef à Parsan Zist Sharif
  • Iran - Tehran
  • janvier 2014 à janvier 2017

1. consulting, design and performance of environmental process and odor removal plant
for fish meal companies and waste water treatment of all kind of industrial factories.
2. consulting, design and performance any kind of falling film Evaporator devices to
increase fish meal factories efficiency.
3. factories automation to decrease humanity fault.
4. process consulting and providing solution to increase industrial factories efficiency.
5. consulting fish meal factories for more products efficiency
Projects:
1. Design, manufacturing and installation of odor reduction plant in FARAVARI fish Meal
Company.
2. Vaprotech Falling film evaporator setting up with 35 ton per hour capacity.
3. Automation of falling film evaporator in FARAVARI fish meal company
4. Design, manufacturing and installation of odor reduction plant with Absorption wet
scrubber process with 75% efficiency in FANOUS MAAHI fishmeal Company

Wastewater treatment project manager à Abzian Nil Pars
  • Iran - Tehran
  • mars 2013 à janvier 2014

Project manager
DUTIES AND RESPONSIBILITY:
1. Waste water treatment package supervising during package manufacturing
2. Installation and commissioning of waste water treatment package
3. Cooling tower Structure manufacturing supervising
Project:
1. Installation and Commissioning of waste water treatment packages at PADIDE KISH
Company located in Kish Island with 200 m3 per day capacity
2. Project manager for the construction and the installation of the cooling tower project in
SHAZAND petrochemical site
3. Installation and commissioning waste water treatment package of CHAAPENTESHAR
company
4. Installation and commissioning waste water treatment package of central bank
department of Iran company
5. Installation and commissioning waste water treatment package of BAHMANDIESEL
company
6. Installation and commissioning waste water treatment package of MAHAN airways
company

Pilot plant manufacturing engineer à Kimia Sanat Sharif
  • Iran - Tehran
  • avril 2010 à mars 2013

Pilot plant Designing, manufacturing & commissioning in factory and on client’s sites
Projects:
1. Design, Assembly and commissioning silver powder recycling of special mask plates
with 99.9% purity
2. Assembly and commissioning steam turbine pilot plant with RANKINE cycle
3. Design, Assembly and commissioning Elevated chamber with various temperature
between -40 to +90 °c
4. Design, Assembly and commissioning water treatment pilot plant such as electro
coagulation, Anion + Cation+ activated carbon + sand filter columns and magnet water
pilot plant
5. Assembly and commissioning co2 removal of TARASHT power plant exhaust flue gas
by contacting Amine in Hollow fiber membrane column and etc...

Éducation

Master, Chemical Engineering
  • à Islamic Azad University
  • février 2015

Master degree in chemical engineering

Specialties & Skills

Utilities
Maintenance Management
Coordination
Root Cause Analysis
Management
Coordinating skills
Preventive maintenance
Reverse osmosis plant
Ammonia refrigeration maintenance
Water and wastewater treatment
Industrial utility
Preventive maintenance planer
Maintenance management
Root cause analysis
Powder Mill
Chiller maintenance
Commissioning
Steam boiler operation
Team work

Langues

Anglais
Moyen

Formation et Diplômes

heating package installation and training course (Formation)
Institut de formation:
Iran Technical & Vocational Training
Date de la formation:
August 2021
Durée:
30 heures
industrial chiller maintenance training course (Certificat)
Date de la formation:
August 2021