  • My current job since November 2020

panning the overall annual maintenance shutdown activities for the 6783 MW Shoaiba thermal power plant and South Jeddah thermal power plants along with the Major overhauling and maintenance of supercritical boiler, furnace and turbine along with its auxiliaries with SEC T&I department.

Senior Operation and Maintenance Manager at Fluid Technology International
  • Pakistan - Karachi
  • My current job since February 2019

Working as an O&M Manager for the Existing and new Desalination / RO Plants installed on boot basis operations across the region
Job Description:
• Providing Technical and operational expertise during the operations of the existing RO and Desalination plants
• Involved the budgeting and proposal submissions of new bids / Tenders
• Evaluation of Bids and BOQ`s to prepare technical documentation.
• Performing and Scheduling Corrective and Preventive Maintenance and deputing teams accordingly for various areas
• Inventory control and spares availability for the existing plants to avoid lead maintenance time

Project Manager (Field Services) at National Project Managers
  • Saudi Arabia - Riyadh
  • November 2016 to January 2019

Working as a Principal Engineer (Field Services) with emphasis on promoting and maintaining the technical adequacy, uniformity & quality of the project designs in the primary areas of power & desalination plants developing & managing core teams to evaluate customer requirements and produce technical responses to formal requests for proposals from current and potential customers
•Provides technical management consultancy, refurbishment and maintenance of power plants/utilities by:
•Technical Proposal and Bid Submission along with site management and resource allocation for ongoing projects
•Repair and maintenance activities for boilers / HRSG, auxiliaries, pumps and balance of plant (BOP) equipment
•Power & Desalination plant Equipment troubleshooting & overhauling Services including (ST/GT/Demin Plant/MSF)
•Provide professional field support to the Construction Department, as necessary, during construction phases.
•Performing Installation, Commissioning, Fabrication & NDT activities
•Maintaining products & suppliers database and monitor prices & availability in local market
•Performing technical clarification /Specification and negotiations with identified suppliers
•Turnaround and Shutdown activities for power block & auxiliary block
•Specialized services for Equipment (Boroscopic) & valves (bench test) maintenance
•Mechanical Diagnostic Services (Vibration analysis, condition Monitoring & Risk based Inspections)
•Preparing man-hour estimates, material takeoffs, technical correspondence, reports and studies

Technical Site Manager at BEAUDREY & Cie
  • United Arab Emirates - Dubai
  • August 2015 to October 2016

Currently working as a Technical Site Manager in Beaudrey Middle East form the Design, Technical Evolution, Equipment sizing up to Proposal submission for the respective RFQ for Middle Water and Utility projects, the addatioal Scope includes O&M, Commission and fter sales for all the on-going Middle east Projects.
•Murafiq Power Station (Yanbu-KSA)
oSupporting EPC (Bilfinger) for the technical Evaluation on Debris Filter Selection.
oPreparing the Proposal and equipment sizing for the Brine heater and Evaporator (Continous Tube Cleaning)Skid.
oCoordination with the Site and EPC team during installation and Commissioning Phase
•Al-Hiid Power Station (Bahrain)
oPM Inspections / Troubleshooting for the 12 No. Dual FlowTravelling Band Screens, 12 No.s Trash racks and Stoplog gates.
oAftersales and site coordinatation for spare parts and retrofit job performed at site.
•South Jeddah Thermal Poower Plant (Jeddah-KSA)
oCommissioining of 12No. (Out to In Drum Screens with its wash water System.
oTroubleshooting and commissioning for 2 No.s Mobile Trash rack
oPrepration of IQP for the installed Equipments.
oFLQ reports for the technical failure during workshop testing.
•Shuqaiq-II Thermal Power Plant (Shuqaiq, KSA)
oSupervision of the Installation, prepartion of IQP
oTechnical Evulation for the Drum Screens, Trash Rack ans Stop log guides.
•EGA/ DUBAL (Dubai-UAE)
oSizing and Proposal for DN1500 W-type Debris filter.
oSupervison for the Retrofitting of old filter with a new.
oHandling all the Spare and after sales for the Project
•Maaden Phosphate Company (Maaden, KSA)
oSite / Equipment Audit for 8 No. Travelling band Screens, 2 No.s Mobile Trash rack and Stop log gates.
oSupporting Engineering for Modifications and advacements

Plant Maintenance & Commissioning Engineer at Arabian Bemco
  • Saudi Arabia - Khobar
  • February 2012 to July 2015

Worked with Arabian Bemco / DOOSAN Heavy Industries JV at Qurayyah combined Cycle Power Plant of 4000 MW cap. Managed from the concept of design to the commercial start up including Supervising the completion of all technical scopes of work with respect to the design scope, specifications, drawings and data sheets necessary for the project. Administered the daily job assignment of work force in accordance with the Planned and equipment breakdown schedules.
• Monitored daily condition of critical rotating equipment and maintained the spare machinery for contingency.
• Verification/Technical review of design in line with project requirements, International codes and standards
• Pre-Qualification of intended bidders (EPCC) for projects.
• Technical and Commercial evaluation of bids for Projects.
• Respond bidders’ technical & commercial queries in light of ITB
• Prepare Project Schedule In MS Project.
• Prepare PFDs, UFDs & P&IDs Regarding Simulation using Auto Cad / CadWorx P&ID.
• Making Process, Equipment & Instrument Data Sheets
• Sizing, Selection & Procurement of Equipment (Static & Rotary) & Instruments (Pneumatic, Electric & Electro -pneumatic)
• Line & Valve Sizing of the project.
• Communicate with Piping, Static Equipment, E&I Deptt, & Procurement Deptt. for Smooth completion of the project
• Deciding ESD, Blowdown, Startup, and Shutdown & Maintenance Philosophy.
• Project Progress & Budget Monitoring with Client
• Plan for FAT, Shipment & SAT
• Prepare plan for Execution, Erection, Pre-commissioning, Commissioning, Rigging and Site Risk Assessment
• Prepare Technical write-ups, Mechanical, Fabrication QA/QC Pre-commissioning Commissioning and Handover Documents
• Prepare the Manufacturing Record Book to submit the Client for their Operation Help.
• Trouble shooting & Calibration of Instruments & Control Valves.

Project Engineer at ENAR PETROLEUM REFINING FACILITY
  • Pakistan - Karachi
  • January 2011 to December 2011

• Sustains and improves reliability, plant operation, maintenance, and systems documentation for a petroleum refining facility.
• Follow the Overall maintenance shedule for the plant including the rotary and stationary equipments.
• Preventive maintenance sheduling to over come the long term maintaince issues for shutdown and turnaround.
• Manages the plant’s operations, maintenance, projects, and departments including spare parts, inventory, budget, and compliance with environmental and safety regulations.
• Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses, and achieve standard and acceptable production rates.
• Introduced and developed an approach to maintenance incorporating principles of TPM (Total Productive maintenance), RCM (reliability centered maintenance), and the Kaizen philosophy, and then created plans, programs, and strategies for personnel and equipment improvement.
• Development and implementation of scheduled maintenance programs and lubrication plans, overhauls, outages, inspections, procedures, checklist.
• Development and implementation of data collection systems and programs, fault trees, root cause analysis, lubrication and viberation analysis of the equipments with the implementation of personnel training, including SOPs, checklists.
• Assure permit to work & job safety analysis is detailed per job.

Education

Master's degree, project management
  • at National University of Science & Technology (NUST)
  • December 2012

-Project initialization,Project scope & Charter. -Project Proposal and feasibility. -Project Selection Method. -Project Planning. -Project Quality Management. -Strategic planning in projects. -Project Communication Management. -Project scheduling and controlling techniques (PERT/CPM) -Risk Management. -Cost & Time Management. -Project Monitoring,Evolution & EVMS -Project Close up

Bachelor's degree, Mechanical Engineer
  • at Quaid-E-Awam UET
  • December 2010
High school or equivalent, Pre-Engineering
  • at ADAMJEE GOVT SCIENCE COLLAGE,KARACHI
  • December 2006

pre-engineering securing 72% marks with distinction in thermodynamics and physics

Specialties & Skills

Plant Commissioning
Plant Maintenance
Preventive Maintenance
Facility Operations
System Maintenance
Project Managment
Auto-CAD 2D\\3D
Primeavera P6/P3
NEBOSH-IGC
Planning
valves. maintenance.

Languages

English
Expert
Urdu
Expert
Armenian
Expert
Arabic
Intermediate

Memberships

ASME international
  • SDOB Member
  • January 2008
SAE
  • mEMBER
  • October 2009
Saudi Engineering Council
  • Professional Member
  • March 2013

Training and Certifications

NEBOSH-IGC 1/2/3 (Certificate)
Date Attended:
March 2016
Valid Until:
January 9999
D-11 STG Operation (Certificate)
Date Attended:
March 2013
Valid Until:
April 2013
D-11 STG Operation (Certificate)
Date Attended:
March 2013
Valid Until:
April 2013