أسد ياسين, FOC implementation Consultant (B2B project)

أسد ياسين

FOC implementation Consultant (B2B project)

Ooredoo

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Electrical Power
الخبرات
13 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 3 أشهر

FOC implementation Consultant (B2B project) في Ooredoo
  • عمان - مسقط
  • أكتوبر 2015 إلى نوفمبر 2015

 Managing OFC project for Long Haul, Metro & cooperate customer (Fttx)
 Coordinate with business & service delivery team
 Finalized all new route with planning team & customer.
 Manage all fiber testing / acceptance & follow up permissions.
 Update reports / tracker & Validate document to handover.

Senior Transmission Consultant (worked as TD) في Huawei
  • جمهورية الكونغو الديمقراطية
  • ديسمبر 2013 إلى يوليو 2015

ORANGE MSTP Project - NG-SDH, DWDM & Metro Fiber Network
 Planning, Implementation, commissioning & Rollout of Optical networks.
 Commission of U2000 server & clients.
 Commission & configuration of Metro / Long Haul RINGS of OSN3500.
 Configure Ring MSP & SNCP.
 Planned & implement Cut over for shift all traffic from ZTE MW to Huawei.
 OSN Software & base BIOS up gradation.
 Commission of BITS.
SCPT Transmission backbone fiber MS Project
 Manage SCPT optical fiber Metro & Long Haul network.
 Country wide any fibe issue perform trouble shooting.
 Manage all power issue & on site activates.
 Perform configuration for SCPT customer (Tigo, Orange, Airtel, Vodacom & MTN)

Optical Transport Network Consultant في STM
  • تشاد
  • أكتوبر 2012 إلى مارس 2013

 Manage Sitcom NOC 24/7 & manage all trouble shooting activities country wide.
 Manage server (Light soft) & clients.
 Configuration all type of traffic & protections.
 Manage & plan new optical fiber networks & expansions.
 In case of fiber cut send teams & manage trouble shooting.
 Coordinate with power team to fix power issue.
 Prepare all networks report (daily, weekly, Monthly) conduct meeting with customer

Optix Transmission Engineer (Planning & Implementation) في Huawei Technology
  • باكستان - لاهور
  • سبتمبر 2011 إلى أغسطس 2012

Add two Lambda’s in Wateen DWDM Long Haul Network.

 Commissioning of two new Lambda’s in Wateen DWDM long haul network on BWS1600G equipment.
 Performed activities at NOC for adjust optical power & commission of new links.
 Reconfigure MSP ring & prepare LLD.
 Total no of sites are 18 (OSN7500 & BWS 1600G)
2 - Commissioning of STM-64 link from Shikarpur to Chamman.

 Commission STM-64 link from Shikarput to Chamman for Afghan Tel connectivity.
 Tuning of optical power E2E & create MSP.
 Total no of Nodes are 6 (OSN3500)
3 - Commission STM-16 link from Quetta to Taftan.

 Commissioning of STM-16 link from Quetta to Taftan.
 Debugging of Optical power E2E all links & create MSP.
 Total no of Nodes are 10 (OSN3500)
4 - Warid MSC Shifting Project from LHR02 to LHR03.

 Commission of OSN7500 & BWS 1600G nodes in new MSC.
 Shift Transmission equipment from old MSC to new MSC also performs cut over Metro & Long Haul DWDM rings (For three lambda traffic).
 Traffic Shifting (STM-1, STM-4 & GBE link level) & Upgrade T2000 license.

5 - PTCL 0560 Ufone Mobile Backhaul Project.

 Implement & commission Core / Access rings of Ufone in Lahore, Faisalabad, Gujrawala & Sialkot city.
 Conduct PAT & performed cut over from Micro wave to fiber media.
 Total no of Nodes are 47 (OSN550 & OSN3500)

Front Office Transmission NOC Engineer في Mobily Etisalat
  • المملكة العربية السعودية - الرياض
  • يوليو 2008 إلى أكتوبر 2010

 Hands on experience on HUAWEI Optix OSN 1500, 2500, 3500, 7500, 9500 &
CISCO ONS 15454 SDH / DWDM equipments.
 Worked on T2000 NMS for Huawei nodes & CTC for Cisco nodes.
 Performed MDT, TCN, Re-homing, Migration & manage BMC REMEDY.
 Provisioning & maintaining of optical / electrical transport service i.e. FE, GE link & E1, E3, STM-1, STM-4, STM-16 & STM-64 as per Database.
 Configure protections i.e. 1+1 liner MSP, Ring MSP & SNCP.
 For service affecting alarms send SMS from SMS portal & open TT on MOS 7100.
 Support customer for integration & cutover BSC, MSC, re-routing & Ethernet VLAN traffic management.
 DCN network monitoring & maintaining.
 Prepare ADM inventory & TX / RX optical power reports on weekly basic and suggest MDT / TCN for problem fixing.
 Prepare performance report on weekly basic & forward to customer.
 Upload new SDH with project team & configure new fiber link.
 Provide media connectivity for all new 2G / 3G sites & performed loop testing.
 Escalate optical fiber cable faults to Mobily OSP team & perform trouble shooting.

Transmission Engineer (Operation & Maintenance) في National Telecomunication Corporation.
  • باكستان - لاهور
  • أبريل 2003 إلى أكتوبر 2007

 Hands-on experience on SIEMENS SMA-1, SMA-4 SDH equipments.
 Configured SIEMENS TNMS (Uni-gate & OSI stack) centralized transmission management system for NTC Metro Network Lahore.
 Synchronized PERN Project SDH (UET, PU, LUMS, GCU, PUICT, COMSAT, LCW) with existing Metro SDH network.
 Coordinate with field engineer for testing & trouble shooting of E1 / STM-1 with BERT.
 Performed trouble shooting with all GSM operators in case of media failure (Ufone, Mobilink, Warid & Telenor).
 Provide media connectivity with all transit & IGW switches.
 Save SDH back up file on weekly basic & upload in case of any SDH failure.
 Provide media connectivity to all new NTC MSU & RDLU
 Conduct MDT for shifting traffic of RDLU from DRS to SDH media.
 Performed PAT with Vendors / sub-con for newly installed SDH Metro & PERN sites.

OSP Engineering (Optical Fiber Cable Networks) في National Telecommunication corporation
  • باكستان - لاهور
  • أبريل 2000 إلى مارس 2003

 Planned & implement fiber network for OFS Junction sub division, Lahore.
 Implement fiber network for PERN-1 Project in center region & coordinate with PTCL.
 Prepare all fiber links diagram.
 conduct survey for new optical fiber cable links ( Metro, Long Haul & PERN project)
 Perform testing & trouble shooting of optical fiber links.
 Good knowledge of optical fiber cable types & specification.
 Conduct PAT with PTCL, NTC, vendors & sub con for newly laid optical fiber links.
 Manage splicing team for Metro / Long Haul & after splicing verify with OTDR.

الخلفية التعليمية

بكالوريوس, Electrical Power
  • في UET Lahore
  • فبراير 2000

Major in Electrical Power

Specialties & Skills

Projects Coordination
Transmission Engineer

اللغات

الانجليزية
متمرّس