FOC implementation Consultant (B2B project)
Ooredoo
Total years of experience :13 years, 3 Months
Managing OFC project for Long Haul, Metro & cooperate customer (Fttx)
Coordinate with business & service delivery team
Finalized all new route with planning team & customer.
Manage all fiber testing / acceptance & follow up permissions.
Update reports / tracker & Validate document to handover.
ORANGE MSTP Project - NG-SDH, DWDM & Metro Fiber Network
Planning, Implementation, commissioning & Rollout of Optical networks.
Commission of U2000 server & clients.
Commission & configuration of Metro / Long Haul RINGS of OSN3500.
Configure Ring MSP & SNCP.
Planned & implement Cut over for shift all traffic from ZTE MW to Huawei.
OSN Software & base BIOS up gradation.
Commission of BITS.
SCPT Transmission backbone fiber MS Project
Manage SCPT optical fiber Metro & Long Haul network.
Country wide any fibe issue perform trouble shooting.
Manage all power issue & on site activates.
Perform configuration for SCPT customer (Tigo, Orange, Airtel, Vodacom & MTN)
Manage Sitcom NOC 24/7 & manage all trouble shooting activities country wide.
Manage server (Light soft) & clients.
Configuration all type of traffic & protections.
Manage & plan new optical fiber networks & expansions.
In case of fiber cut send teams & manage trouble shooting.
Coordinate with power team to fix power issue.
Prepare all networks report (daily, weekly, Monthly) conduct meeting with customer
Add two Lambda’s in Wateen DWDM Long Haul Network.
Commissioning of two new Lambda’s in Wateen DWDM long haul network on BWS1600G equipment.
Performed activities at NOC for adjust optical power & commission of new links.
Reconfigure MSP ring & prepare LLD.
Total no of sites are 18 (OSN7500 & BWS 1600G)
2 - Commissioning of STM-64 link from Shikarpur to Chamman.
Commission STM-64 link from Shikarput to Chamman for Afghan Tel connectivity.
Tuning of optical power E2E & create MSP.
Total no of Nodes are 6 (OSN3500)
3 - Commission STM-16 link from Quetta to Taftan.
Commissioning of STM-16 link from Quetta to Taftan.
Debugging of Optical power E2E all links & create MSP.
Total no of Nodes are 10 (OSN3500)
4 - Warid MSC Shifting Project from LHR02 to LHR03.
Commission of OSN7500 & BWS 1600G nodes in new MSC.
Shift Transmission equipment from old MSC to new MSC also performs cut over Metro & Long Haul DWDM rings (For three lambda traffic).
Traffic Shifting (STM-1, STM-4 & GBE link level) & Upgrade T2000 license.
5 - PTCL 0560 Ufone Mobile Backhaul Project.
Implement & commission Core / Access rings of Ufone in Lahore, Faisalabad, Gujrawala & Sialkot city.
Conduct PAT & performed cut over from Micro wave to fiber media.
Total no of Nodes are 47 (OSN550 & OSN3500)
Hands on experience on HUAWEI Optix OSN 1500, 2500, 3500, 7500, 9500 &
CISCO ONS 15454 SDH / DWDM equipments.
Worked on T2000 NMS for Huawei nodes & CTC for Cisco nodes.
Performed MDT, TCN, Re-homing, Migration & manage BMC REMEDY.
Provisioning & maintaining of optical / electrical transport service i.e. FE, GE link & E1, E3, STM-1, STM-4, STM-16 & STM-64 as per Database.
Configure protections i.e. 1+1 liner MSP, Ring MSP & SNCP.
For service affecting alarms send SMS from SMS portal & open TT on MOS 7100.
Support customer for integration & cutover BSC, MSC, re-routing & Ethernet VLAN traffic management.
DCN network monitoring & maintaining.
Prepare ADM inventory & TX / RX optical power reports on weekly basic and suggest MDT / TCN for problem fixing.
Prepare performance report on weekly basic & forward to customer.
Upload new SDH with project team & configure new fiber link.
Provide media connectivity for all new 2G / 3G sites & performed loop testing.
Escalate optical fiber cable faults to Mobily OSP team & perform trouble shooting.
Hands-on experience on SIEMENS SMA-1, SMA-4 SDH equipments.
Configured SIEMENS TNMS (Uni-gate & OSI stack) centralized transmission management system for NTC Metro Network Lahore.
Synchronized PERN Project SDH (UET, PU, LUMS, GCU, PUICT, COMSAT, LCW) with existing Metro SDH network.
Coordinate with field engineer for testing & trouble shooting of E1 / STM-1 with BERT.
Performed trouble shooting with all GSM operators in case of media failure (Ufone, Mobilink, Warid & Telenor).
Provide media connectivity with all transit & IGW switches.
Save SDH back up file on weekly basic & upload in case of any SDH failure.
Provide media connectivity to all new NTC MSU & RDLU
Conduct MDT for shifting traffic of RDLU from DRS to SDH media.
Performed PAT with Vendors / sub-con for newly installed SDH Metro & PERN sites.
Planned & implement fiber network for OFS Junction sub division, Lahore.
Implement fiber network for PERN-1 Project in center region & coordinate with PTCL.
Prepare all fiber links diagram.
conduct survey for new optical fiber cable links ( Metro, Long Haul & PERN project)
Perform testing & trouble shooting of optical fiber links.
Good knowledge of optical fiber cable types & specification.
Conduct PAT with PTCL, NTC, vendors & sub con for newly laid optical fiber links.
Manage splicing team for Metro / Long Haul & after splicing verify with OTDR.
Major in Electrical Power