Quantity Surveyor
Ahmad Yousef Al-Tarawneh
Total years of experience :8 years, 7 Months
1 Follow up all construction activities and ensure compliance with specs and drawings.
2 Preperation of shop drawings (Cross Sections, Pipe and Box Culverts Retaning Walls )
3 Preparation of daily, weekly, & monthly reports as per actual progress.
4 Quantities Take-off from the drawings and specification.
5 Preparing Bill of Quantities and summary sheets for the project
6 .As Built Drawings
1 Follow up all construction activities and ensure compliance with specs and drawings.
2 Preperation of shop drawings (Cross Sections, Pipe and Box Culverts Retaning Walls )
3 Preparation of daily, weekly, & monthly reports as per actual progress.
4 Quantities Take-off from the drawings and specification.
5 Preparing Bill of Quantities and summary sheets for the project
6 .As Built Drawings
1- Design Road by civil 3D
2- Calculate Quantity for road works.
3- GIS digitizing, analysis and network
The my work is designing Alignment & and create profile of natural ground for pipes of water & after excavation we are take level and after installation the pipes we take invert level of pile and make other profile to see if the pipe within slope gravity tolerance .