Control Engineer
PGESCo
Total years of experience :8 years, 4 Months
El Ain El Sokhna Supercritical Thermal Power Plant.
• Abu Qir Thermal Power Plant.
• Cairo West Thermal Power Plant.
Job Description:
1. Responsible Engineer for the Steam Turbine, Electrical & Instrumentation packages.
2. Issuing & updating the packages specifications & instruments data sheets.
3. DCS package bids evaluation, Steam turbine package bids evaluation.
4. Logic diagrams design & development.
5. Preparing I/O list, instruments index.
6. Issuing Instruments location plans.
7. Issuing level setting diagrams.
8. Issuing Instruments Installation details (IID's) & making sure that the contractors
drawings comply with the IID's.
9. Reviewing vendor drawings & documents to ensure conformance to contract
specifications and international codes and standards.
10. A member in PGESCo.'s Instrumentation Committee.
11. Participated in Abu Qir plant instrumentation readiness review & Issuing readiness
report.
12. Participated in El Ain El Sokhna OTS (Operator Training Simulator) Pre-FAT & FAT.
13. Assisting & supporting the procurement team in price negotiations & order finalization
with different vendors.