Senior Electrical Engineer &Acting MEP Project Manager
M/s. Delta Al Emarate Building Contracting LLC, Dubai.
Total des années d'expérience :22 years, 8 Mois
The projects that shared it for execute : -
** Full Package of the Project I Love Florence Tower (Commercial &Residential B+G+3P+34+R.F) - Main
Contract Works, Plot No. BB.A02.016, Business Bay, Dubai, UAE, Consultant: M/s. LACASA Architects and
Engineering, Client: - M/S Dar A; Arkan Properties LLC.
*Full Package of the 413 Villas at Cluster “Centaury” (VP7) and 35 Villas at Cluster “Acuna” in Phase 2 of
the “AKOYA Oxygen” Master Development located on Plot No. 9160101, Al Yufrah 2, Dubai, UAE, (Plot
numbers as per attached list) @ Akoya Oxygen, Consultant: M/s. ACE International consultant Engineering,
Client: - M/S Front Line investment Management Co. DAMAC .
* Full Package of the (G+3) Primary School Building on Plot no. 424-4461, Eid Musallah on Plot no. 424-4462 and the Public Parking Area on Plot No. 424-4467 at Al Warqa’a Fourth, Dubai - with LACASA design Consultant &M/s. Sustainable Architectural & Engineering Consultants
, Client: - M/s. The School of Research Science .
The projects that shared it for execute: -
1- G+9 GOLF Apartments (3 clusters) Akoya by Damac. At Dubai - Motor City with AECOM
Consultant &ATK Consultant, Client: - Damac .
2- Clubhouse -Trump international Golf club - At Dubai - Motor City with Dynamic Engineering
Consultant, Client: - Damac .
3- Falcon City of Wonders Project for Construction of Hyper market, Medical center, Mosque, nursery At Dubai - Falcon City.
4- Residential Building, G.F + 5 Parking + 32 Floors Typical (MAG-230), At Dubai - City of
ARABIA with Design Engineering Consultant, Client: - MAG Group.
The projects that shared it for execute: -
1- Infrastructure, Roads, Landscaping & External Works Contract No. MW-OU-081-2010, Abu Dhabi Air Base - United Arab Emirates (3 Nos. Of Electrical Substations) .
2- Construction of 22 nos. of buildings for General Command of the Military Works, Contract No. MW-OU-057-2010.
3- Supply & Installation of 11kV Cable Works for Bawabat Al Sharq Commercial & Residential
Complex- Phase 1 (Villas & Blocks)
& Phase 2 (Villas /School /Temporary Chillers).
With M/S Banyias development & investment Co. .
The projects that shared it for execute:-
1- ADCO Contract NO: 7470.01/EC 10750, CONSTRUCTION WORKS FOR NEB TIE-INS AND CLUSTER MODIFICATIONS
2- ADCO Contract No. 7489.01/EC 10752, Enhancement of Corrosion Injection at ASR Gas Production Wells at BAB.
3- ADCO Contract No. 7489.01/EC 90141, Construction Work for 12 Gas Producer Tie-ins and Flow Line Segregation for Units 6 & 7 Wells at BAB.
4- ADWEA Contract No. G3923 - Supply and Installation of the Automated Meter Reading (AMR) Technology System in Abu Dhabi & Al Ain Area ( Responsible for Al Ain Area ).
- 5- ADWEA Contract No. G4204 - Amplight Expansion project for ADDC and AADC (Responsible for Al Ain Area).
The projects that shared it for execute: -_
1- Commercial and Office building plot no. (214-657) Al Garhoud, Dubai.
2B+G.F+ 10 Floors Building (13 M.Watts) with AWQAF and Minors Affairs
Foundation Client& BU Haleeba (BHC) cont.co. Main Contractor.
2- Commercial Residential Villas plot no. (251-4697 ) Mirdif, Dubai
G. + 1 Floors (30 Nos.) With AWQAF and Minors Affairs Foundation Client &CONDOR cont.co. Main Contractor.
3-Commercial Residential building for GERMAN SPORTS TOWER plot no. (682-1293) NAD AL SHIBBA (DUBAI SPORTS CITY)
B. +Gr. +14 Floors Building with PAXINO INTERNATIONAL (FZE) Client,
MAJED HILAL Cont. co. Main Contractor.
_ Project Responsibilities and Authorities:-
* Preparing and designing the Shop Drawings, Arranging the submittals for all the materials which we need in the projects & getting approval from the Clint, consultant & Authorized government Dept., Establishment & Handing over for all electrical works & low current systems and Systems , Maintenance during Maintenance period.
*Authorized as Electrical engineer from all Government Dept. like as Abu Dhabi Distribution Company, Al Ain Distribution Company, Abu Dhabi Municipality & Town Planning Dept.Consultants, Private Department, Dealing with them.
The projects that shared it for execute:-
1- Residential & Commercial for Seven to Twelve Floors Building & Villas Complex for Private Clients with Mass Consultant, Construction Engineering Consultants , Architectural & Engineering Consultants & Al Batten Engineering Consultant & &Ahmed Salem Suwaidan cont.co. , Al Shuwehat General Cont. co. Main Contractor.
2- National Bank of Abu Dhabi (E25, Plot 31) Eight Floors Building with Arab Consultant Architects Engineering, Gulf Number Cont. Main Contractor.
3- Mosque & Shopping Complex in (M16, M21, M32, and M37) Musafah Abu Dhabi
With Abu Dhabi Municipality & Town Planning Dept. Consultants, Gulf Pioneer General Cont.Co., Spark General Cont.Co. Main Contractor. .
4- SH.Mariam Palace (W50, Pot Palace)With Private Department for H.H Sheikh Zayed Bin Sultan Al Nahyan Works Department, Pact General Cont. Main Contractor.
5- Al ZAYTONA SCHOOL (ALMarfaa -Abu Dhabi) With Altorath Engineering Consultants, Gulf Pioneer Main Contractor. 6- Al Bashair Private School (Musafah Abu Dhabi ME12-Plot-11) with Architects Interior Designers Architectural Consultancy Project Manager, Lines & Dimensions Consultant . AL HUDA - Main Contractor .
7- Maintenance of Electrical equipments in an electrical power substation at AL Ain city near Al Noor Hospital.
The projects that shared it for execute:-
1- Road Infrastructure (Street light Electrical cable laying and intercommunication network cable laying, street light poles installation).
2- Building for MR.Ahmed Amer Egypt-Al Bhara Five Floors. 3- Operation & Maintenance of Plant Asphalt Mixing.
I have 20 years experience.