Project Engineer
MBC
Total years of experience :17 years, 8 Months
Handling projects independently in different countries. (Dubai, Egypt, KSA, Bruit, and Jordan etc.)
Coordination with different sub contactors for the maintenance activities.
Preparing scope of work for upcoming projects.
Drawings preparation and project plan for the upcoming projects.
Responsible for all technical & facility upgrading work.
Responsible for remote offices operation & maintenance.
Design and implementation of MEP fit out works for offices.
Preparing the power upgrade design as per new requirements.
Responsible for design and implementation of the projects.
Preparing complete power backup package for the on air system. Maintain the backup power supply (UPS & Generator) for system.
A/C design and up gradation for data center of MBC.
Implementation of chiller management project
Implementation of FM-200 system installation in data center & libraries.
Prepare incident report and send it to management for technical issues.
Preparing weekly and monthly project progress report for every month and send it to line manager.
Attend management meetings regarding the technical issues
Manage store and maintenance team activities.
Successfully completed implementation of MBC Maser channel at Egypt Media City.
Successfully complete the MBC-Maser News channel and Al-Arabiya channel Power upgrading projects.
Responsible for the technical and facility department.
Over all incharge for Maintenance Department (Electrical & Mechanical).
Responsible for Operation and Maintenance of Printing Press Plant and Commercial Building. The whole plant is automation and PLC control.
Troubleshooting and Fault detection.
Prepare schedule for the Daily, Weekly, Monthly and Annual Maintenance for the Plant and entire MEP work.
Maintenance for AHU, FAHU, FCU’s, Chill Water system, Heat Exchanger and different types of water treatment pumps.
Operation and Maintenance of 16 No’s of printing Towers each tower has 2 units (CROMOMAN).
Operation and Maintenance of Paper Reel Units and UTR (Universal Transfer Release) System (FERAG).
Operation and Maintenance of Paper Dryer Units.
Operation and maintenance of the Folder Units (MANROLAND)
Euro Binding Units (HEIDELBERG) fully control with PLC system.
MDB and its related SMDB’s testing and commissioning.
Configuration of the PLC’s.
If unit has some error related to the PLC or Sensor, through software I have to find out problem and get a production.
Daily report to the Technical Manager
Inspection Installation of Latest State Of The Art Electricity Metering Project Contract with Abu Dhabi Water and Electrical Authority (ADWEA) and End User of the Project are Abu Dhabi Distribution (AADC) and Al-Ain Distribution Company (AADC).
Installation of Automatic Meter Reading (AMR) System.
Testing and Commissioning of Automatic Meter Reading (AMR) System.
Inspection for Installation of Electrical AMR metering system for Single Phase, Three Phase DC and Three Phase CT meters.
Inspection of Materials which is use in this Project.
Supervise the Site Acceptance Test (SAT) for all the types of ACTARIS and Elster Meters.
Send reports to Client for faulty meters.
Supervision for Flashing of faulty meters.
Supervision for Quality of Works and Material.
Inspection for Snags Works.
Daily report to Project Manager.
Electrical and coordination incharge of Marina Mall Extension contract with M/s National Investment Corporation.
Responsibilities, apart from standard MEP works, include specialist works consisting of design & building of a Ski Slope, Snow Production System, Ice Rink and Climate Control with a Central Control Glycol System feeding Ice Rink, Ski Slope, Glycol Coolers and Fresh Air handling Units.
Coordination with Consultant and Client for the approval of Shop Drawings, Materials and works which is done according to the shop drawing at site.
Quantity take-off from the drawings and preparation of BOQ.
Familiar with the Technical Documentation Controlling.
Familiar with the Low Current System.
Drawings modification according to the consultant comments.
Installation, testing & commissioning of Electrical (LV) Switch Gear System which is in our scope.
Follow up ADDC inspection and Drawing approval for Electrical System.
Follow up the approval and installation of KW meters in the substation for each SMDB.(ADDC)
Follow up the Civil Defence approval and inspection for Fire Alarm System.
Coordination with supplier for the materials submittals and supply of materials.
Operation and Maintenance of all the Snow Production System, Ice Rink and Climate Control.
Operation and Maintenance of all the Electrical (LV) Switch Gear System.
Prepare Electrical and LV System As Built Drawings.
Project completed and is under commissioning.
In the mean time, I was appointed as an Electrical Engineer at Carrefour Project in Bawadi Mall Al-Ain.
Approval of the shop drawings from the consultant and review their comments.
Complete the works according to the shop drawing at site.
Arranged inspection of consultant for the completed works.
Installation, testing & commissioning of Electrical (LV) Switch Gear System which is in our scope.
Operation and Maintenance of all the Electrical (LV) Switch Gear System.
Supervision of installation of new BSC (Basic Switching Center) Site by the contractors (Alcatel & Motorola).
Supervision of installation and commissioning of Fiber Optic system by the contractors (Alcatel & Motorola).
Supervise Alcatel connectivity BSC to BTS.
Maintenance of Auto Transfer System.(ATS).
Attending the faults in ATS, BTS, Microwave, Rectifier and Microwave Dish.
Involve for final testing and loping after switching BTS Motorola To Acatel (Optical Fiber System).
Inchrage 122 BTS Sites in Central 2 region Jhang Pakistan.
Executive MBA in Project Management
Bachelor Technology In Electrical Engineering.
Diploma of Associate Engineer in Electrical.