Asif Shahzad, Assistant Engineer Electrical

Asif Shahzad

Assistant Engineer Electrical

Arzoo Textile Mill ltd Faisalabad

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Electrical Engineering
Expérience
13 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 10 Mois

Assistant Engineer Electrical à Arzoo Textile Mill ltd Faisalabad
  • Pakistan - Faisalabad
  • Je travaille ici depuis juin 2012

Working as a Assistant Electrical Engineer in processing department. There are rotary machines of Zimmer and Flat Bed of Rajhani Siemens based machines and inverters.

T & C Engineer à Alstom Transport
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis juin 2014

Responsibilities

 Testing and Commissioning Engineer RSG
 Magnetic and Selective Testing SD, ID & FD loops on tracks
 TLC testing and synchronizing of TLC with track SD, ID & FD loops
 Documentation work for RSG Reports
 Inspections of TLC with SYSTRA
 Installation of DCS Cabinets, antennas on Track
 Cable Laying for DCS
 Continuity and magger testing of power cables
 Terminations and earthing of cabinets
 Short circuit test
 Boundary wall CCTV installation
 Power and Optical Fiber cable Laying
 Assembling of CCTV
 Assembling of power boxes of CCTV
 Installation of Power boxes and splicing boxes inside manhole
 Splicing of optical fiber cable
 Optical Fiber Test
 CAT-7 connectors installation
 Fluke testing of CAT-7
 Terminations on both ends for CCTV on camera and inside power boxes
 Bosch CCTV camera Installation on pole
 Cable pulling from telecom cabinet to camera
 CAT-7 connectors installation
 Testing of CAT-7

Assistant Engineer QA/QC à Descon Engineering Limited
  • Pakistan
  • Je travaille ici depuis février 2013

Working on Inspection of Conduiting, Panels Installation and Grouting, Termination of control and power cables of MV/LV, Continuity and Insulation Testing of MV/LV/HT and Control Cables, Cable Laying, Cable Tray Installation. Raising RIT and Inspection Plan.
· Comprehensive Understanding of Installation of LV/MV/MCC/UPS, DCS panels.
· Comprehensive Understanding of Installation of Current Transformers, Capacitive Voltage Transformers, Voltage Transformers, Circuit Breaker, Surge Arrester, Insulators of 220KVA Switch Yard.
· Comprehensive Understanding of Transformers Installation and Testing like Dielectric Test, Voltage Ratio.
· Comprehensive Understanding of Installation of Fire Alarm, Public Address CCTV and LAN system.
· Comprehensive Understanding of Earth Working.
Expertise
· Inspection of Panels Installation and Grouting
· Inspection of Installaion and termination of Breakers
· Inspection of Installation and termination of Transformers, CT, CVT and Disconnectors
· Inspection of Transformers testing and Commissioning
· Inspection of Motors Installation and termination and Comissioning
· Inspection of Motors IR test
· Inspection of Instrument Installation TT, PT, DIT
· Inspection of Cable Conduting
· Inspection of Torquing
· Inspection of Cable Laying LV/MV
· Inspection of Fire Alarm, CCTV and LAN system
· Inspection of Lightening System
· Preparing RIT
· Insulation and Continuity Testing and Loop Testing
 Drawings review and verifying BOM quantities
 Installation of main transformer of GTG, STG (199MVA, 211MVA).
 Installation of LV, MV switchgears and its coupling with bus bars.
 Installation of grounding system of plant.
 Installation of Cathodic protection system of pipe lines and tanks.
 Installation of Diesel generator having capacity of 1000KVA.
 Cable laying of power and instrument.
 Installation of lighting poles and its fixtures.
 Installation of PA and CCTV system.
 Insulation testing of power and instrument cables.
 Perform all activities as per international standards and design requirement.
 Perform the activity of oil testing (Dehydration test)of transformer.
 Installation of Air craft lights on Main stack and By pass stack.
 Installation of LCS and welding sockets.
 Loop Check from DCS to Marshaling cabinet and Marshaling cabinet to field.
 Three Elements Cascade Loop.
 Sizing of the Final Control Element.
 Pressure, Level, Temperature, Flow and PH Control Loop.
 Calibration of the Temperature, Pressure and Vacuum Gauges (Using Jofra and Druck Calibrator)
 Calibration of the Transmitters Foxboro, Honeywell (smart) and Rosemount by using Smart Communicator (SFC 282) and Field Calibrator 375 as per Standard.
 All control system and different field and different area such as, oil field & chemical field.
 Calibrated the Differential Pressure Transmitter Honeywell series 2000, Rosemount 1151, 3151, etc. Foxboro Temperature Transmitter (Honeywell). Level Transmitter (Fisher 2390). Visage the PLC (Omron CE200), DCS (TDS 2000) in Industrial spotlight other than Controller of Honeywell, Ascon 20, ABB.
 Calibration of PH Controller (Honeywell), Magnetic Flow Meter, Variable area Flow meter.
 Calibration of Temperature Sensors like Thermocouple and RTD. of Rosemount series.
 Work on Pressure Switches (Dan Foss), Level Interface Probe (Agar) and Level Switch (Magnatrol) etc.
 Calibration of the Control Valve (Fisher, Honeywell & Mesonielen).
 Worked on Digital Gas Detectors (Detronics)
 Comprehensive understanding of installation of CT, PT, CIRCUIT BREAKER, SURGE ARRESTER, DICS INSULATORS at 220KV Switchyard
 Insulation Tester (Megger)
 Earth resistance Tester
 Phase sequence Meter (Megger)
 Transformer oil Tester(Megger)
 Multimeter (Fluke)
 HI-POT Tester (Megger)
 HART Communicator Micro Processor Base Rosemount, Model: 275 & 375 Aplisense.

Trainee Engineer à jdw sugar mills ltd.rahim yar khan pakistan
  • Pakistan
  • novembre 2010 à mai 2012

Trainee in engineer at power house of 28Mw. 2turbines of peter brotherhood and generators of Reliance Electric of 3mw and 4 turbines of Shinko japan and Alternators of Toyo Denki of rated capacity 5mw and 6mw.Total Generation is 28MW from which 7MW is supplied to Wapda through 11KV feeders.

Training à Thermal Power Complex Faisalabad GENCO III, Faisalabad
  • Pakistan - Faisalabad
  • juin 2010 à septembre 2010

3 months training about operation and maintenance of Frame 5. Mark 1 Gas Turbine and associated switch gear training center 200 MW Gas Turbine Power Station Faisalabad. Conducting Water and Power Development Authority (WAPDA), Pakistan.

Éducation

Baccalauréat, Electrical Engineering
  • à The University Of Faisalabad, Faisalabad
  • septembre 2010

Major subjects Power Electronics,Industrial Process Control,Satellite Communication,Engineering Economics and Management, Mobile Communication,Control System,Numerical Analysis,Linear Algebra and Multivariable Calculus,Measurement and Instrumentation,Network Analysis I & II,Ac Machines and Drives

Etudes secondaires ou équivalent, Pre-engineering
  • à Board of Intermediate and Secondary Education Bahawalpur, Bahawalpur
  • août 2006
Etudes secondaires ou équivalent, Science
  • à Board of Intermediate and Secondary Education Bahawalpur, Bahawalpur
  • mai 2004

Specialties & Skills

Power Plants
Power Plant Operations
Transformer
Transmission
Autocad

Langues

Anglais
Expert
Urdu
Expert

Formation et Diplômes

Internship (Certificat)
Date de la formation:
June 2010
Valide jusqu'à:
September 2010

Loisirs

  • ENGINEERING SEARCHES
    Engineering Research work to generate an power with sunlight greater then GTPS system