Deputy Director, Hydro Development
WAPDA
Total years of experience :18 years, 2 Months
• Preparation/Review of Feasibility studies for Hydel Power Projects.
• Preparation & Evaluation of EOI (Expression of Interests) and of RFP (Request for Proposal) of the Consultants.
• Evaluation of Prequalification, Technical & Commercial Bids of Contractors.
• Preparation of Tender Documents in coordination with the Consultants.
• Preparation of PC-I (Financial Analysis, Economic Analysis, Unit Cost Analysis, Justification of Project, Manpower Requirement, Cost Estimates etc.) and its follow-up till approval from Planning Commission and Ministry of Water and Power
• Verification of consultants invoices in-line with contract provision.
• Co-ordination with Foreign Donor Agencies for Financing of WAPDA Hydel Projects.
• Co-ordination with Sectary office for N.O.C for visit of foreign delegations and missions to Pakistan.
• Facilitate General Manager (Hydel) Development for smooth day to day running of office.
• Verification of House Acquisition cases of WAPDA Hydel, Lahore.
• Liaison with management of WAPDA Hydel Power Stations for matters relating technical and official issues.
Supervise the maintenance team
Execute maintenance plans
Plan maintenance schedules
Budgetary
Evaluations Report of Bid
Technical Report Writing
Trouble shooting
Operation and Maintenance of transport fleet
Engineer system modification to minimize outages
Maintenance of station auxiliaries like fire Protection System, lifts/Elevators, station drainage system
Mechanical Maintenance of Substation auxiliaries
Framing of Safety guide lines
Training of staff
Inventory control
Procurement of spares
Conducting official Inquiries
• Field engineering & design coordination activities for heat exchanger & seals
• supervision and monitoring maintenance
• management,
• technical review of vendor / supplier’s items,
• preparation of material requisition
• preparation of bidding documents
• preparation of evaluation reports
• Managing, Daily, Monthly and Annual maintenances
• Job safety analysis
• Fault rectification and trouble shooting
• Job evaluation, Indenting work permits and plan maintenances
• Budget Preparation and Budgetary Control
• Indenting local and foreign spares through inventory and forecasting analysis
• Maintaining machine log and maintenance documents
• Preparation of Monthly and Annual Maintenance Reports
• Technical liaison with local manufacturers for indigenous manufacturing of foreign spare parts
• Administrate O&M of Gundaf irrigation tunnel, Gadoon.
• Any other responsibility specially assigned
Achievements:
Resigned of Shaft Seal Carbon Segment and enhanced life by 3.4 times and reduced outages
Eliminating literal movement of 50 Tons counter-weights and lattice disc of Inlet valve.
• Power generation through Diesel Engine
• Complete Over hauling of Diesel Engines
• Over hauling of rotary and reciprocating pumps and compressors
• Over hauling of fuel pumps and injectors/atomizers
• Over hauling of centrifugal separators
• Turbocharger assembling and disassembling
• Hydraulic Tightening
• Valve and guide repair and seat adjustment
• Exposure to heat recovery system, R.O filtration and H.F.O storage
• Engine Trouble shooting and Plant/Heat rate analysis
3rd Position in the Bachelors of Mechanical Engineering Examination, Mehran University of Engineering & Technology, Jamshoro, Pakistan One month Internship at Tapal Energy, Karachi, Pakistan 1st Position in the Pre-promotion Junior Management Course at WAPDA Administrative Staff Collage, Islamabad 1st Position in WAPDA Pre-promotion Departmental Examination 2nd Position in the Pre-promotion Sector Specific Course at Hydel Training Centre, Mangla 3rd Position in the Technical Induction Course, WEA, Faisalabad