Electrical Project Engineer في AYTB
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ يناير 2015

AYTB- AL YUSR INDUSTRIAL CONTRACTING CO. LTD, SAUDI ARABIA January -2015 to-Present Project Engineer (E/I)

Planning, Controlling and Monitoring the execution of all electrical/instruments works of the project, and ensure that the project is done in accordance with all the approved construction drawings, contract documents, specifications and all applicable standards

Electrical Engineer في Attock Oil Refinery Limited
  • باكستان - روالبندي
  • يناير 2012 إلى يناير 2015

 Preparation of maintenance work orders, Preventive/Periodic Maintenance planning and
execution and allocate resources based on priorities and take part in start-up and shutdown
during annual turnaround and thereby ensure safe and successful operations of the facility
 Troubleshooting and maintenance of Grid Station (132KV), Power Plant (7.5MW) equipments and
associated Protective Relays, Standby Generators, Power Transformers, testing of protection
interlock scheme.
 Providing technical support for Routine maintenance, Commissioning and Troubleshooting of HT
& LT Panels, Switchgears equipment, Distribution panel, Auto change over switches, Motors,
wiring of DOL & star-delta starters etc.
 Operation and testing experience of alternator, relays, breakers, current transformer and
potential transformers
 Selection & sizing of various LT & HT electrical equipment includes transformer, DG, Switchgear,
circuit breaker, bus bar, battery & UPS system, PF correction capacitor sizing.
 Performing various calculation including load calculation, short circuit calculation, motor starting,
voltage drop calculation, LT & HT cable sizing calculation for various motor load & non motor load
in process plant
 Preparation of material (Requisition for Quotation), technical comparatives & technical bid
evaluation report
 Review / check, electrical drawing, wiring diagrams, schematic / working drawings, As-Built
drawing, test reports, warranty certificate
 Accountable to create a safe working environment, manage risks, reduce exposure to hazardous
OBJECTIVE
To seek a challenging role which will contribute to my professional growth and development, work in
a dynamic environment with great potentials and adhere to the goals of the firm with enthusiasm,
dedication, active spirit, internally motivated on every task assigned, hard-working and trustworthy.
Page 2 of 3
liability and ensure implementation of QHSE policy
Key Achievements
 Successfully completed Project of Boiler House Substation Relocation
 Successfully completed project for Emergency Supply from Power Plant to Grid Station
 Operations & Maintenance of (11/6.6/0.415KV) Distribution System, (11/6.6KV) Switch Gear &
132KV grid-station
 Maintains good housekeeping of the workplace
 Conducted various safety campaigns like Safety Suggestion Week and Road Safety Week, on
regular periods for better engagements
ARL UP-GRADATION PROJECT
Hyundai Engineering Co. Ltd.
Role: Project Engineer
Project: Design, Selection & Installation of electrical system and equipment for Power Plant, Pre
Flash Revamp, NHT Revamp, Reformer Revamp, Isomerization Plant, DHDS Plant, H2 Plant, Amine
Units, Cooling Water System, Stream Generation System, Hydrogen Unit
 Preparation of Purchase requisition for material required for site clearance, Preparation of
procedures for execution of jobs and arrangement of shutdown for subject area
 Detailed study, Review and verification of document/ drawing transmittal for Basis of Electrical
System, 11/6.6KV Switchgear & MCC, 415V Switchgear & MCC, Power Transformer,
Earthing/Grounding System, electrical requirement for package, Bus duck, 11/6.6/0.415
distribution system
 Installation, testing and commissioning of 11/0.415 KV Sub-Station including Sub-Station
Earthing, Transformer Installation, Aux supply, protection and control, elementary drawings,
physical layout and design, underground cable sizing and design.
 Interface with and coordinate civil and structural engineering resources and aspects of the
substation and switchyard projects.
 Planning, Estimation, Costing, Budget Analysis and Preparation, Statusing & Reporting progress
of the project. Providing technical and economical justification for the project definition and
project execution

Assistant Engineer في Roomi power Plant
  • باكستان - ملتان
  • أبريل 2009 إلى ديسمبر 2011

Operation, maintenance, equipment inspection, performance testing and analysis of gas engines
415V(1.1MW) & 11KV (1.9MW).
 Investigation of the electrical power systems of the plants, including the generators& its
auxiliaries, power transformers, motors, switchgear, control and protection systems.
 Maintenance and Monitoring of 2MVA 11/0.430 KV Transformers
 Installation, Commissioning and trouble shooting of Motor starter, MCC & Control panels,
Variable Frequency Drives, Synchronizing panel, 11KV VCB, 415V ACB (Siemens make), MCB,
ELCB, 11KV Relay control panel.
 Installation, Overhaul all and Preventive maintenance of motors, : VCB, ACB, MCCB, MCB etc.
 Monitoring instruments to maintain voltage, Control and maintain auxiliary equipment, such as
pumps, fans, compressors, condensers, heaters, and filters, to supply water, fuel, lubricants, air,
and auxiliary power.
 Inspect records, compile operational data, log book entries, and communicate with other plant
personnel, in order to assess equipment operating status.
Maintenance of Engines
 Testing and Inspection of Alternators
 Valve lash and Valve recession
 Testing of Ignition Transformers and Spark Plugs
Participated in complete erection of the plant and installation of Gas Engines
CATERPILLAR(U.S.A) Gas Engines G3516B (1.1MW), G3520C (400V) & G3520C (11000V) (1.95
MW) Including; Installation and testing of power cables, Installation of step up transformers
(2000KVA), Testing and commissioning of ACB, VCB (ABB, MISTUBISHI), Installation of H.T and L.T
control panels (Fico, Bilal Engineering & Terberg), Installation of Cooling System (Liang Chi, China )

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في BZU Multan
  • أكتوبر 2009

Specialties & Skills

operations
Troubleshooting
Power Quality
Variable Frequency Drives
AutoCAD (drawing for Electrical Plans), ETAP(simulation package for LV, HV & MV for load calculation
AutoCAD, ETAP, MATLAB, Maximo, PROTEUS, PSpice, Microsoft Project MSOffice (Word/Excel/Power Point)

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس
العربية
مبتدئ
البنجابية
متمرّس

العضويات

Pakistan Engineering Counsil
  • Registered Engineer
  • March 2012