أيمن أحمد, Acting as engineering manager

أيمن أحمد

Acting as engineering manager

MUP

البلد
مصر - القاهرة
التعليم
بكالوريوس, Electronic and Communication Engineering
الخبرات
11 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 9 أشهر

Acting as engineering manager في MUP
  • مصر - القاهرة
  • يناير 2015 إلى مايو 2015

• Plan, organize and directs engineering team to meet company objectives for operation and improvement of existing production lines.
• Oversees key projects, processes and performance reports, data and analysis. Plans documentation system.
• Selects, develops, trains and supervises staff.
• Develops, determines and implements policies, procedures and programs.
• Selects correct design concepts and fundamental technology used for new products or improvement for existing ones.
• Reviews and analyzes proposals submitted to determine if benefits derived and possible applications justify expenditures.
• Approves and submits proposals considered feasible to management for consideration and allocation of funds or allocates funds from the department budget.
• Working with the production and quality managers by reviewing and monitoring quality and process improvements.
• Recommends budgets to management, including staff use, technology, facility and equipment requirements or improvements.
• Negotiates contracts with consulting firms and outsourced contractors to perform research or other applicable studies or support.
• Directs appropriate support for manufacturing and quality functions within the organization.
• Ensure safety policies and regulations are implemented and followed by my team and other teams.

Senior maintenance and packaging engineer في Eli Lilly & Co
  • مصر - القاهرة
  • أكتوبر 2009 إلى ديسمبر 2014

- Senior maintenance and packaging engineer at Eli Lilly & Co. Egypt, 2009 - present with the following responsibilities: • Installation production instruments.
• Performing different qualifications for installed instruments (IQ/OQ/PQ/MQ)
• Troubleshooting and maintenance of different production equipments.
• Suggesting and performing of the preventive maintenance planes.
• Purchasing and managing of spare parts inventory.
• Calibration of different systems according calibration schedules according to manufacturer instructions to ensure compliance with cGMP
• Writing monthly report about all the instruments and giving advices to decrease the system unplanned downtime.
• A member of risk assessment team responsible for evaluation of engineering related current and future risks on the production processes.
• Creating work related SOPs, Change Control, Deviation / incident reports, technical reports and the following up of CAPA in coordination with the QA department.
• Effective communication with QC, QA and microbiology departments in order to comply GMP regulations.
• Analysis and interpretation of the process results from the engineering point of view.
• A project leader for packaging line upgrade responsible for the following: 1. Contacting the suppliers to get different offers for the needed equipments.
2. Comparing different offers technically and financially.
3. Selecting the best offers and negotiating for better delivery conditions.
4. Ensure proper cash flow for the project.
5. Arrange weekly meeting to ensure to track all activities and ensure that the project timelines are being met.
6. Follow up and coordinate installation activities for the new equipments.
7. Arrange and supervise training and handover activities to production team.
8. Evaluation of equipment performance after installation.
9. Follow up and prepare PM planes for the new equipments

Free lancer installation and maintenance engineer في Spectrum Co
  • مصر - القاهرة
  • يناير 2006 إلى يناير 2010

- Free lancer installation and maintenance engineer in Spectrum Co. for research system (agent of Jasco Europe in Egypt), 2006 - 2010 with the following responsibilities: • Installing of some scientific equipments sold by the company.
• Maintenance of some sold scientific equipments.
• Writing technical reports about these equipments.
• Training the customers in order to use efficiently different equipment.

Technical support unit head at Rhein في Minaphram Biogenetics
  • مصر - القاهرة
  • يناير 2006 إلى أكتوبر 2009

- Technical support unit head at Rhein-Minaphram Biogenetics, 2006 - 2009 with the following responsibilities: • Installation of biotechnology production instruments including bioreactors, chromatography systems and Filtration systems.
• Performing different qualifications either prospectively or retrospectively for installed instruments (IQ/OQ/PQ/MQ)
• Troubleshooting and maintenance of different biotechnology production instruments.
• Suggesting and performing of the preventive maintenance planes.
• Purchasing and managing of spare parts inventory.
• Calibration of different systems according calibration schedules according to manufacturer instructions to ensure compliance with cGMP
• Writing weekly report about all the instruments and giving advices to decrease the system failure time.
• A member of risk assessment team responsible for evaluation of engineering related current and future risks on the production processes.
• Participating in process validation and cleaning validation, sampling plan, sampling, reviewing results and introducing suggestions and recommendations.
• Creating work related SOPs, Change Control, Deviation / incident reports, technical reports and the following up of CAPA in coordination with the QA department.
• Effective communication with QC, QA and microbiology departments in order to comply GMP regulations.
• Analysis and interpretation of the process results from the engineering point of view.

Installation and maintenance engineer في Spectrum Co
  • مصر - القاهرة
  • سبتمبر 2003 إلى ديسمبر 2005

- Installation and maintenance engineer in Spectrum Co. for research system (agent for Jasco Europe in Egypt), 1997 - 2005 with the following responsibilities: • Introduction of different systems to the customer and able to suggest solutions that fitted customer needs.
• Installing different scientific equipments sold by the company.
• Maintenance of different scientific equipments sold by the company.
• Performing different qualifications for supplied instruments (IQ/OQ/PQ/MQ) whenever requested by customers.
• Writing technical reports about each equipment.

الخلفية التعليمية

بكالوريوس, Electronic and Communication Engineering
  • في Zagazig University
  • يناير 2003

Bachelor of Science in Electronic and Communication Engineering. Faculty of engineering, Zagazig University, 2003. Graduation project: Excellent.

Specialties & Skills

Project Management
Commisioning
Maintenance Management
Pharmaceuticals
Electrical Maintenance
BUYING/PROCUREMENT
CALIBRATION
CHANGE CONTROL
ENGINEER
IQ/OQ/PQ
MAINTENANCE
SOLUTIONS
TRAINING
WRITING TECHNICAL

اللغات

العربية
متمرّس
الانجليزية
متمرّس