Senior Mechanical Site Supervision Engineer / reporting to the project Resident Engineer:
Job description (HVAC, Plumbing, Firefighting)
1. Reviewing shop drawings as per design, Reviewing the submitted materials as per project specs and codes
2. Reviewing the pre-construction phase documents such as builders work, structural coordination drawings with beams and hollow core slabs, Block work drawings, slab embedded drainage
3. Coordinate between the heights in drawings and the actual constructed ceiling heights to avoid any discrepancies in the false ceiling heights, mechanical coordination drawings
4. Checking any materials received at site as per approved suppliers and country of origin, witnessing mechanical installations, coordination and testing
5. As built drawing, testing & commissioning, snag list preparation and follow up.
• King Saud University Endowment Project Riyadh, (KSUE) Hilton Residential suites.(SDC / Drake & Scull )
15 stories building with one basement & three floors parking, Building cooling capacity around 1400 TR served by district cooling plant through two plate heat exchangers for usual operation and
Gust Suits are covered by FCUs, Fresh air covered by central roof top AHUs, dedicated AHUs for Public areas,
Car parking exhaust systems covered by jet fans & main fans.
Water supply network consisting of underground and roof top filtered water tanks with transfer and booster pump sets
Three RO plants, boilers, clean steam generators also containing medical gas system consisting of MCA, MV, AGSS plants, n20, o2 manifolds, medical gases piping .All building covered by sprinklers system, FM200( Electrical rooms ) & fire alarms .
• King Saud University Endowment Project Riyadh, (KSUE) 100 Bed Hospital (Inter Health Canada).
9 stories building with one basement & three floors parking, Building cooling capacity around 1100 TR served by district cooling plant through two plate heat exchangers for usual operation and two emergency chillers of 450 TR capacities for critical areas .Patient areas are covered by FCUs, Fresh air covered by central roof top AHUs, dedicated AHUs for OTs, Radiology, kitchen and laundry.
Water supply network consisting of underground and roof top filtered water tanks with transfer and booster pump sets
Three RO plants, boilers, clean steam generators also containing medical gas system consisting of MCA, MV, AGSS plants, n20, o2 manifolds, medical gases piping .All building covered by sprinklers system & fire alarms .
• King Saud University Endowment Project Riyadh, (KSUE) Office Building (Al-Aamody building).
16 stories building with one basement 3 floors parking, cooling capacity 1500 TR served by district cooling plant. Through a two plate heat exchangers and set secondary pumps,
Office areas are covered by FCUs, Fresh air supplied by central AHUs at rooftop, dedicated ventilation/smoke fans for parking. Smoke evacuation fans covering all the building. All the equipment and the fire alarm panel are connected to the BMS.
• HRH ARQA Palace Firefighting system renovation
A multi buildings and palaces compound main task was to check and test the existing sprinklers system and fire alarm system, main fire alarm panels, repeaters, BMS system ( sequence of operation during fire events ), FM-200 (Room and trenches integrity test smoke and heat detectors where tested in substations, smoke evacuation fans
• King Abdullah Financial district (KAFD) - Skywalk project - (Saudi Diyar Consultants).
The project involves construction of skywalk footbridges ventilated bridges with a floor width of four to six meters. A visual connection from the Skywalks to the streets and plazas of the city which will help pedestrians to find their way on the elevated bridges
- Company industry:
- Business Consultancy Services
- Job role:
-
Civil Engineering