Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
ayman Maher, Mechanical Construction Manager

ayman Maher

Mechanical Construction Manager·Hassan Allam Technologies, Cairo, Egypt.

Egypt

Bachelor's degree, Mechanical power engineering

Work experience

Total years of experience: 21 years, 6 months

Mechanical Construction Manager

May 2019 - Present

Hassan Allam Technologies, Cairo, Egypt.

Cairo, Egypt

May 2019 - Present

 Suez Canal Authority Stadium, Ismailiyah 2020-2021
 HVAC, VRF / Firefighting sprinkler system, FM-200, CO2 systems
 Water supply and drainage, / central boilers / Underground main feeding utilities (water, fire, drainage, storm drainage)
 Stadium capacity 20, 000 seats
***** Reviving Humanity Memorial Project, Sharm El Sheikh 2019-2020
 Recreational facilities, with built up area 300, 000 M². / 25 KM of underground Drainage, Firefighting, water supply, irrigation, chilled water & water features tie in networks. / Pumping stations for all mentioned systems, chillers, Fire hydrants, manholes, ICs, Sump bets, concrete water tanks, /Water features complete with pump rooms,

Company industry:
Construction & Building
Job role:
Construction and Building

Mechanical site chief

February 2014 - March 2019

Saudi Arabian Baytur

Mecca, Saudi Arabia

February 2014 - March 2019

Mechanical site chief reporting to M.E.P. Manager:

Job description (HVAC, Plumbing, Firefighting)

• JODP : Jabal Omar Development Project (Phase-2 - Zone S3/S4) (Sheraton / Westin
5 stars Hotels) KSA, Makah

High rise 34stories (200, 000M ²) building with common 10 stories podium & four 24 stories towers Building cooling capacity is ( 10000 TR ) served by district cooling plant through 10 plate heat exchangers, AHUs, APUs, FCUs, Pumps .
Fresh air through Heat Recovery units, Exhaust fans, Parking ventilation, Kitchen hoods
Sprinkler system, F M-200, Domestic water, drainage systems, BMS.

Company industry:
Construction & Building
Job role:
Engineering

Senior Mechanical site Engineer

March 2010 - January 2014

saudi Diyar

Riyadh, Saudi Arabia

March 2010 - January 2014

Senior Mechanical Site Supervision Engineer / reporting to the project Resident Engineer:
Job description (HVAC, Plumbing, Firefighting)

1. Reviewing shop drawings as per design, Reviewing the submitted materials as per project specs and codes
2. Reviewing the pre-construction phase documents such as builders work, structural coordination drawings with beams and hollow core slabs, Block work drawings, slab embedded drainage
3. Coordinate between the heights in drawings and the actual constructed ceiling heights to avoid any discrepancies in the false ceiling heights, mechanical coordination drawings
4. Checking any materials received at site as per approved suppliers and country of origin, witnessing mechanical installations, coordination and testing
5. As built drawing, testing & commissioning, snag list preparation and follow up.



• King Saud University Endowment Project Riyadh, (KSUE) Hilton Residential suites.(SDC / Drake & Scull )

15 stories building with one basement & three floors parking, Building cooling capacity around 1400 TR served by district cooling plant through two plate heat exchangers for usual operation and
Gust Suits are covered by FCUs, Fresh air covered by central roof top AHUs, dedicated AHUs for Public areas,
Car parking exhaust systems covered by jet fans & main fans.
Water supply network consisting of underground and roof top filtered water tanks with transfer and booster pump sets
Three RO plants, boilers, clean steam generators also containing medical gas system consisting of MCA, MV, AGSS plants, n20, o2 manifolds, medical gases piping .All building covered by sprinklers system, FM200( Electrical rooms ) & fire alarms .

• King Saud University Endowment Project Riyadh, (KSUE) 100 Bed Hospital (Inter Health Canada).

9 stories building with one basement & three floors parking, Building cooling capacity around 1100 TR served by district cooling plant through two plate heat exchangers for usual operation and two emergency chillers of 450 TR capacities for critical areas .Patient areas are covered by FCUs, Fresh air covered by central roof top AHUs, dedicated AHUs for OTs, Radiology, kitchen and laundry.
Water supply network consisting of underground and roof top filtered water tanks with transfer and booster pump sets
Three RO plants, boilers, clean steam generators also containing medical gas system consisting of MCA, MV, AGSS plants, n20, o2 manifolds, medical gases piping .All building covered by sprinklers system & fire alarms .


• King Saud University Endowment Project Riyadh, (KSUE) Office Building (Al-Aamody building).

16 stories building with one basement 3 floors parking, cooling capacity 1500 TR served by district cooling plant. Through a two plate heat exchangers and set secondary pumps,
Office areas are covered by FCUs, Fresh air supplied by central AHUs at rooftop, dedicated ventilation/smoke fans for parking. Smoke evacuation fans covering all the building. All the equipment and the fire alarm panel are connected to the BMS.

• HRH ARQA Palace Firefighting system renovation

A multi buildings and palaces compound main task was to check and test the existing sprinklers system and fire alarm system, main fire alarm panels, repeaters, BMS system ( sequence of operation during fire events ), FM-200 (Room and trenches integrity test smoke and heat detectors where tested in substations, smoke evacuation fans


• King Abdullah Financial district (KAFD) - Skywalk project - (Saudi Diyar Consultants).

The project involves construction of skywalk footbridges ventilated bridges with a floor width of four to six meters. A visual connection from the Skywalks to the streets and plazas of the city which will help pedestrians to find their way on the elevated bridges

Company industry:
Business Consultancy Services
Job role:
Civil Engineering

Mechanical Site Engineer

December 2007 - February 2010

STS Altafuf

Jeddah, Saudi Arabia

December 2007 - February 2010

Job description (HVAC, Plumbing, Firefighting)
1. Study the project specifications and approvals, Material take off as per site condition and approved submittals, prioritizing areas for work according to civil casting schedules.
2. Estimation of the required manpower and equipment, storage facilities
3. Organize the work priorities as per the planning schedule.
4. coordination of mechanical work with all other disciplines in site and proceed with installation
5. follow procurement/suppliers for material delivery dates and any required data or documents e.g. pump test curves, CFD analysis, control sequence requirements
6. do pre test for the installed application before inspected by the consultant
7. submit the inspection request to the consultant,
8. preparation for commissioning process (pre-design phase, design phase, construction phase, occupancy and operation phase )


• Bay la sun-KAEC, KSA.

Bay La Sun Development is located on the western edge of the King Abdulla Economic City master plan in Saudi Arabia. The overall master plan includes commercial, resort and residential districts. 130, 805 m².The chilled water supplied from a district cooling plant. Common underground car parking is mechanically ventilated (jet fans), AC is covered by the means of chilled water AHUs, FCUs, water supply with the mean of underground and roof top tanks, drainage and waste water all collected to main lifting station to the main water treatment plant


• Jeddah Gate, Jeddah, KSA.

Scope of work was laying establishment Infrastructure for 3 KM as the following:
1. MV cables, lighting poles.
2. Storm drainage and MHs & curb inlets.
3. Water supply piping and main underground water tanks.
4. Irrigation piping and main underground irrigation tank.
5. Firefighting system complete with all underground piping, fire hydrants, PRVs.
6. Drainage systems complete with piping, MHs.

• Eidaby 50-bed hospital Jazan, KSA.

Two stories hospital, covered by DX-AHUs containing medical gases system, kitchen, and laundry

Company industry:
Construction & Building
Job role:
Civil Engineering

Mechanical Site Engineer

September 2006 - August 2007

IPEC

Cairo, Egypt

September 2006 - August 2007

2006 - 2007: IPEC Cairo, Egypt (Mechanical Site Engineer / Reporting to the General manger ) :

• National telecommunication institute smart village, Egypt : HVAC, Firefighting.

• Service complex smart village Egypt: HVAC, Firefighting.

• Al-Ahly bank kenna branch: HVAC-(Design and build).

Company industry:
General Engineering Consultancy
Job role:
Civil Engineering

Mechanical Design Engineer

August 2004 - August 2006

ECH. Egyptian Consulting House

Cairo, Egypt

August 2004 - August 2006

(Mechanical Design Engineer/ Reporting to the Head of Department):

• Safwa Towers Makah, KSA. : HVAC

7000 TR Chilled water system, 32 storey High rise project on Haram, Mekkah, KSA.
Comprising of twenty two floors of hotel rooms, 7 floors of commercial, praying halls, food courts, mechanical floor
And car parking.
Responsibilities/Tasks: Team Leader for acknowledging the owner requirements setting the preliminary design, dividing the building into zones and spaces the proceeding with the cooling load estimation using HAP, Selection For required equipment, determine the ventilation requirements & exhaust system, duct and pipe size design, air outlets distribution, selecting the appropriate control method based on the activity on each zone .
Stair case pressurization fans, elevator shafts pressurization smoke evacuation fans.

• Sheraton, Al Maddinah, KSA: HVAC.

3000 TR Chilled water system,
Responsibilities/Tasks: Design of Hvac. System

• CIB Nile Hilton branch, Cairo: HVAC.
180 TR DX air systems,
Responsibilities/Tasks: Design of Hvac. System

Company industry:
General Engineering Consultancy
Job role:
Engineering

Education

Faculty of engineering

June 2006

June 2006

Bachelor's degree, Mechanical power engineering

Egypt

BCs. Degree of mechanical Power Engineering (2006), Cairo University

Skills

Inspection
Expert
Inspection
Expert
Commissioning
Expert
Commissioning
Expert
Preparation
Expert
Preparation
Expert
Materials
Expert
Materials
Expert
Operation
Expert
Operation
Expert
Hourly analysis program
Expert
Hourly analysis program
Expert
REVIT Program
Beginner
REVIT Program
Beginner
Autocad Program
Expert
Autocad Program
Expert
Inspection
Expert
Inspection
Expert
Commissioning
Expert
Commissioning
Expert
Preparation
Expert
Preparation
Expert
Materials
Expert
Materials
Expert
Operation
Expert
Operation
Expert

Languages

Arabic
Expert
English
Expert

Memberships

Project mangment institute

member

January 2025

Training and Certifications

Certifications
PMI_PMP
done
Carrier Egypt
Mar 2005 - Mar 2005