Senior Mechanical Project Engineer
HSA Group
Total years of experience :16 years, 9 Months
Projects Handled:
Rass Isaa Industrial Company, February 2015
Key deliverables:
• Managing projects from conception, pre-production through to completion.
• Providing technical support to the project team, design review of all mechanical drawings, monitoring and supporting drafting section for preparation of drawings.
• Providing all mechanical design calculations of heat load for HVAC, calculation of compressed air chilled water, cooling duct, steam, all piping, plumbing pipes sizing.
• Detailed verification and approval of materials submittals, detailed review of shop drawings submitted by MEP contractor.
• Supervising and progress monitoring of the project in accordance with IFC specifications, detailed construction documentation, respond to RFI’s, reviewing of builders work and co-ordination drawings and various other site construction co-ordinations with all trades involved.
• Verifying monthly bills of contractor’s against the actual percent of work executed at site.
• Managing project budgets and keeping costs down.
• Preparation of snag list, pre-commissioning inspections, review of testing & commissioning activities, review of As Built Drawings, operation and maintenance manuals.
• Responsible for issuing material request, follow up Letter of Orders and ensuring all the materials are available for site installation.
• Ensuring that all engineering work is carried out in accordance with statutory requirements, laws, rules, regulations and other contractual requirements. With due regards to safety, operability and maintainability.
National Dairy & Food Company - Hodeida, June 2013
Key deliverables:
• Responsible for monitoring, coordinate and supervise MEP site activities and contractors, sub-contractors on a day-to-day basis and ensure that all project phases are achieved within time frame.
• Ensuring that all project goals are achieved as the required quality and budget in safe environment comply with HSE requirements.
• Preparing comparison reports between tender documents and IFC documents by materials quantities, specification and scope of work to commercial department.
• Assisting planning department and procurement department to define the engineering materials required to execute the project and provide the technical support required to select the proper materials and review the technical submittal of materials and ensure its compliance with project specifications.
• Assist Project Manager and Superintendent with subcontract and schedule administration.
• Prepare and manage procurement tracking logs to correlate with the project schedule and the demands of the project.
• Keeps up-to-date on submittals, RFIs and responses, project changes & work progress, especially the items that could delay project or cause a loss, if installed incorrectly.
• Ensuring that all works are executed according to the latest approved revision of drawings and instruction of authorized authorities.
• Monitoring all contractors and Sub-contractor’s performance.
• Analysing and resolving field problems.
• Preparing report to management
• Maintain an awareness of all potential risks i.e. (day to day objectives, progress of the works and deletion etc...)
Projects Handled:
Heat Recovery from Exhaust Diesel Engines Project at Hi-Pack, August 2011
Key deliverables:
• Evaluate and understands project requirements to plan material handling systems, design and select components.
• Assist in the creation of equipment and systems proposals by providing engineering analysis and design expertise.
• Design systems layout and specific components on Catia V5 and 2D AutoCAD software.
• Preparing specifications, user’s manuals, and fully document engineering designs.
• Coordinate and monitor all aspects of production, including selection of manufacturing methods, assist procurement with parts ordering and supplier selection.
• Coordinate designs and manufacturing of outside engineering resources.
• Provide technical support to the project engineers and process resource.
• Planning and executing all the mechanical installation and commissioning of the system as per the agreed timelines, cost and as per the Schindler Safety and Quality standards.
• Co-ordinates with management, Logistics team for material, engineering team for troubleshooting and Service team for smooth handover to ensure total customer satisfaction.
Projects Handled:
27MW Coal Based Thermal Power Plant Project at Yemen Company For Sugar Refinery, June 2009
Key deliverables:
• Provide technical data and consulting services and works with their engineers to ensure the mechanical, electrical, and structural design will support the power plant being installed.
• Plans the mechanical installation of the power plant, from staffing requirements to tools, supplies, etc…
• Involved in the Procurement of all mechanical equipment’s like BTG package, BOP package, pumps, air compressor’s, cooling tower, water treatment plant (DM Plant), effluent treatment Plant, DG EOT Cranes, DG SETS, plant consumables, ash handling and coal handling plant etc…
• Manage and supervise all the mechanical installation.
• Provides technical support to field engineers, technicians and troubleshooting, repairing and debugging complex electro/mechanical equipment.
• Design and manage all process piping and piping installations.
• Ensured that all work was done in accordance to Local building codes and factory manuals.
• Maintains the soft and hard copy of project folders as requested by the project manager.
• Performed regular checks and ensured that all safety regulations were followed.
• Quality Assurance/Quality Control: Assists superintendent in verifying that all materials installed coincide with the approved submittals.
• Analysing and resolving field problems.
• Performs SWPPP and LEED inspections for the project.
• Preparing daily, weekly and monthly reports to management
50MW Coal Based Thermal Power Plant Project at National Cement Company, April 2008
Key deliverables:
• Provide technical data and technical support to the project team.
• Managed and interpreted all technical drawings.
• Supervised mechanical design of facility, inspected layout, equipment arrangement and plant utilities.
• Evaluate structural design of buildings and access platforms.
• Preparation of manpower and equipment deployment schedules.
• Supervise and support the project team during all installation.
• Designed all process piping and supervise piping installations.
• Ensured that all work was done in accordance to Local building codes and factory manuals.
• Ensuring design and installation meets internal and client specifications and statutory requirements.
• Ensuring all engineering and construction drawings are up-to-date.
• Performed regular checks and ensured that all safety regulations were followed.
• Ensures that the project site and construction activities are being constantly documented in writing and especially in photos.
• Analysing and resolving field problems.
• Preparing daily, weekly and monthly reports to management
• Performs SWPPP and LEED inspections for the project.
Professional Program in Mechanical Design and Analysis.
Bachelor of Technology in Mechanical Engineering, Grade: A+