Ayman Sou'b, Construction Director

Ayman Sou'b

Construction Director

Royal Commission of AlUla

Lieu
Arabie Saoudite - Médine
Éducation
Baccalauréat, Civil Engineering
Expérience
30 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :30 years, 8 Mois

Construction Director à Royal Commission of AlUla
  • Arabie Saoudite - Ula
  • Je travaille ici depuis juin 2022
Construction Director à AECOM Arabia
  • Arabie Saoudite - Ula
  • avril 2021 à avril 2022

Construction Director for Ashar valley multiple projects.

Senior Project Manager à AECOM Arabia Ltd.
  • Arabie Saoudite - Jeddah
  • mai 2018 à avril 2021

Managing Construction of new Cargo Terminals at King Abdulaziz International Airport

Senior Project Manager à Arab Potash Company
  • Jordanie - Karak
  • février 2018 à avril 2018

Leading and managing different projects

Project Manager à AECOM ARABIA
  • Arabie Saoudite
  • août 2016 à décembre 2017

Provide Construction Management Services for a mega schools project

Package Construction Manager à AECOM Arabia
  • Arabie Saoudite - Riyad
  • décembre 2014 à juillet 2016

Package Construction Manager / King Abdullah Bin Abdulaziz Public Education Project


Assigned as a Package (26 School Projects) Construction Manager under the King Abdullah Bin Abdulaziz Public Education Project. The role of PCM is to represent the client (Tatweer Building Co.) in construction of these projects and managing the Contractors and Consultant; in addition we build capability and transfer knowledge to Client, Contractors and Consultant.

Construction Task Manager and Deputy Chief of Party à CDM International Inc.
  • Jordanie - Amman
  • mars 2008 à novembre 2014

I have been involved in the construction management for a several projects funded by USAID under the "Water/Wastewater Infrastructure Project" and "Pollution Prevention for Environmental Health Protection Project". I have served as overall Construction Task Manger for a$30, 000, 000+ program to improve watet supply system in amman city and Sewer coverage in the Qairawan Watershed in Jerash city. The main construction elements include:

Construction of Amman water syatem improvement. Consisting of Ductile Iron Pipes installation 8.50 kilometers, Flow Control Valves, Pressure Reducing Valves, and rehabilitation of 66 exixting PRVs.

Construction of Suf Trunk Sewer Line 8.50 kilometers, consisting different type of pipes as HDPE Profile Wall 460mm, 315mm, 400mm and 500mm uPVC Pipe, 150mm & 200mm Concrete Pipe, construction of 900mm & 1000mm diameter Precast and Cast in Siue Manholes, reiforced concrete encasement. in addition to rock fill mattress, demolition and decommissioning of existing manholes. Contract Value is USD $3, 851, 920.00

 Sanitary sewer connections of over 200 households.

 More than 20 separate sewer extension projects totaling more than 5 kilometers.

 Refurbishment of the Jerash Slaughterhouse including upgrades to the building wastewater handling, interior, exterior, plumbing, and electrical.

 Suf Trunk Line replacemnet design.

 Installation of on site wastewater disposal systems.

Responsibilities include:

 Overseeing pre-design studies including geotechnical site surveys.
 Preparing construction cost estimates.
 Preparing bid documents for above mentioned projects.
 Participation in different committees to evaluate bids and quotes.
 Supervising construction activities, for above mentioned projects.
 Following record tracking for above mentioned projects.
 Tracking reports and project schedules and monitoring invoices and payments.

Project Enginner à OPERE PUBBLICHE s.p.a. (Italian Contractor)
  • Jordanie - Amman
  • novembre 2006 à mars 2008

While with Opere Publiche S.P.A., I was a project Engineer for the construction of a 10, 000, 000.00 EURO Waste Water Treatment Plant, serving the Al-Talbieh Town (located 20 Km south the capital Amman). My responsibilities include:
 Project engineer: responsible for constructing the buildings, structures, tanks, roads, landscaping and infrastructures according to the technical specifications and shop drawings.

 Providing the sub-contractors with the daily, weekly, and monthly reports necessary to execute the work with schedule.

 Supervise the approved and as built quantities, and checking the invoices submitted to the consultant.

 Checking the shop drawings and monitoring the material needed in the project.

 Preparing the check request to be submitted to the consultant.

Project Engineer and Client representative à Almulla Engineering & Technical Services L.L.C.
  • Émirats Arabes Unis - Dubaï
  • juin 2006 à novembre 2006

 Client representative for Construction of Staff Accommodation consisting of basement-ground and 10 floors building located in Dubai.

 Client representative for maintenance and rehabilitation of labor camp located in Dubai.

 Project Engineer for construction of 128 Ware Houses located in Dubai.

Project Manager and Client Representative à UAE Armed Forces – Directorate of Military Works
  • Émirats Arabes Unis - Abu Dhabi
  • juin 2004 à juin 2006

Followed and supervised the following projects:
 Construction of 100 Villas at Green Mubazzara-Alain City (25, 000, 000.00 DHS)
Refurbishment and renovation of Abu Dhabi Naval Base Buildings(4, 000, 000.00 DHS)
 Refurbishment and Renovation for Coastal Guards Head Quarter Buildings, Free Harbor and Sadder Harbor - Abu Dhabi (5, 000, 000.00 DHS)
 Reconstruction of Abu Dhabi Naval Base Floating Jetties (2, 500, 000.00 DHS
 Rehabilitation of Helicopters Landing Area for Naval Air Group at Buteen Air Base - Abu Dhabi (500, 000.00 DHS)
 Refurbishment of Naval Air Group Buildings & Hangers at Buteen Air Base - Abu - Dhabi. Total budget was 500, 000.00 DHS.
 Refurbishment and Renovation for Ships & Boats Lift Facility (Syncrolift) at Coastal Guards Head Quarter - Abu Dhabi. Total budget was 6, 500, 000.00 DHS.
 Modification for Syncrolift Facility and Construction of Control Room at Crown Guards - Abu Dhabi. Total budget was 3, 100, 000.00 DHS.
 Construction of Control Room and Concrete Repair for Shooting Yard at Crown Guards - Abu Dhabi. Total budget was 500, 000.00 DHS.
 Construction of Boundary Wall and Buildings Renovation at Coastal Guards Head Quarter - Abu Dhabi. Total budget was 200, 000.00 DHS.
 Construction of Guard Room at Sadder Harbor - Abu Dhabi. Total budget was 200, 000.00 DHS.
 Construction of Concrete Jetty for Coastal Guard at Zayed Harbor - Abu Dhabi. Total budget was 100, 000.00 DHS.
 Construction of Services and Diesel Pumps Room at Coastal Guards Head Quarter - Abu Dhabi. Total budget was 500, 000.00 DHS.
 Preparing Tender Documents and Floating Tenders for Military Police Camp - Abu Dhabi. Total Estimated budget was 5, 000, 000.00 DHS.
 Preparing Tender Documents and Floating Tenders for Maintenance and Renovation Works of three hangers and related buildings for use the Military Language Institute - Abu Dhabi. Total Estimated budget was 3, 500, 000.00 DHS.

Commercial Region Director à Greater Zarqa Municipality
  • Jordanie - Zarqa
  • août 2003 à juin 2004

Managing 265 employees having different job categories (Engineers, Surveyors, Quantity Surveyors, Inspectors, Technical Writers…….etc.), in seven main regions. The Commercial region considered the biggest one.

 Issuing Commercial and Buildings Licenses.
 Inspection for illegal construction works.
 Supervising ongoing projects related to region.
 Running health and food inspection programs.
 Preparing Environmental Impact studies.

Senior Civil Engineer / Resiedent Engineer à JACOBS Engineering Inc. (American Company)
  • Jordanie
  • mai 2002 à août 2003

Aug 2002 to Aug 2003 Resident Engineer,

 Construction of Magnesia Oxide Product Handling, Storage and Dispatch at Aqaba - Jordan. Total budget was 2, 000, 000.00 JOD.
 The project consisted of construction of two 30 meter height each Silos, by using Slip Forming Technology, and other related facilities such as Control and Store Buildings, Dispatch Pits, Conveyor Belt Steel Structure, Retaining Walls, Roads and all MEP works.

May 2002 to Aug 2003 Senior Civil Engineer,

 Construction of Magnesia Oxide Plant (Late Stages) at Ghore Safi - Dead Sea - Jordan. Total budget was 120, 000, 000.00 JOD.
 Prepared the punch list for entire project.
 Supervising Field Orders and other uncompleted civil works.

Resident Engineer à Greater Zarqa Municipality
  • Jordanie - Zarqa
  • juin 1995 à mai 2002

I have supervised the following projects:

 Hot Asphalt Layers for selected streets and roads. Total budget was 1, 000, 000.00 JOD.
 Construction of Five Storey Commercial & Offices Building. Total budget was 350, 000.00 JOD.
 Construction of Multi Storey Commercial Complex. Total budget was 2, 000, 000.00 JOD.
 Construction of 24 Stores at Central Vegetables Municipal Market. Total budget was 600, 000.00 JOD.
 Development for Prince Ali Round About, works included earth fill, earth cut, construction of roads, parking areas; construction of the round about. Total budget was 150, 000.00 JOD.
 Construction of Army Road Tunnel. Total budget was 1, 000, 000.00 JOD.
 Zarqa Tunnel Detours, Total Amount is 100, 000.00 JOD.
 Construction of Road with Box Culvert. Total budget was 150, 000.00 JOD.
 Construction of Retaining Wall and Riprap. Total budget was 50, 000.00 JOD.
I have Joined several committees, representing Zarqa Municipality to study construction of Rapid Train Railway between Amman and Zarqa Cities, Tender was BOT project.

District & Inspection Directorate Manager à Greater Zarqa Municipality
  • Jordanie - Zarqa
  • novembre 1994 à juin 1995

 Managed staff of for inspection of all projects and contracts related to Zarqa Municipality.

 Inspection for tender stages, other departments works.

Maintenance Directorate Manager Assistant à Greater Zarqa Municipality
  • Jordanie - Zarqa
  • octobre 1994 à novembre 1994

 Supervised and managed all projects and formalities related to the directorate.

Intent Engineer à Ministry of Public Work and Housing
  • Jordanie - Amman
  • janvier 1994 à octobre 1994

 Construction of Zarqa Comprehensive Medical Center. Total budget was 2, 000, 000.00 JOD.

Site Engineer à Sami Quo'ar Engineering Office
  • Jordanie - Amman
  • juillet 1993 à décembre 1993

 Construction of Semi Villa located in Amman. Total budget was 150, 000.00 JOD.

Éducation

Baccalauréat, Civil Engineering
  • à N.E.D. University of Engineering and Technology
  • février 1993

Grade A

Specialties & Skills

Civil Engineering
Maintenance Engineering
Team Leader
Presentation

Langues

Anglais
Expert

Adhésions

Jordan Engineers Association
  • Active Member
  • July 1992