SAP Technical Consultant / SME
ATOS Saudia
Total years of experience :14 years, 4 Months
Team Size 15 Project :
Team Size 07 Project : SAP-ABAP/4 Onsite
Technical Team
Module : ABAP/4
Environment
SAP R/3 ECC 6.0
release
Software Languages: ABAP / 4.
Database: Oracle.
Tools: Office XP.
O/s: HP-UX, Win XP
Hardware
Project Description
The SCC Group has an unequalled track-record of providing total system
solutions in energy and telecommunications for over three decades. Their
spectrum of services, range from design and engineering to manufacturing,
installation, testing and commissioning.
Contribution
HEDGING
• Created Customized SAP Screens with a separate Z-transaction for Metal
Fixing Notification (Hedging) using Module Pool Programming for
Create, Change and Display Modes.
• Checked, Enhanced and Migrated ABAP Programs from SAP 4.6c to
ECC6.0
• Changed the Smart-Form ZPPR1005 for Cable Plant GR Tag Printing
and added / modified Bar Code, Date, Standard Text, Material Description
on request from SAP Korea.
• BDC to extend WM views for finished product material using BAPI
BAPI_MATERIAL_SAVEDATA.
Page 14
• Developed QM BDC for Transaction QP01, as such to select the Assigned
operation one by one and Assign the MIC’s, Inspection Method and
Sampling Procedure to each operation
• Created PP BDC to create New Work Centre’s for transaction CR01.
• Changed CO Standard SAP Screen TM01 labels by customizing the
corresponding data-elements and SAP screen level settings of the Fields
by using transaction CMOD.
• Changed the method EXIT_RPCIPE00_001 of Classical BADI
ZHR_OFF_PAYROLL BADI as per HR advice.
5. Project Name: BENAA SAP Implementation.
Client Al Moajil Group, Dammam, Saudi Arabia.
Role Onsite,
Team Size 07 Project : SAP-ABAP/4 Onsite
.
B. Tech ( Bachelor of Engineering & Technology )
,