Azat Rifat, Sr. Resident Engineer

Azat Rifat

Sr. Resident Engineer

AECOM Middle East

Lieu
Irak - Bagdad
Éducation
Baccalauréat, Mechanical Engineering
Expérience
39 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :39 years, 7 Mois

Sr. Resident Engineer à AECOM Middle East
  • Émirats Arabes Unis - Dubaï
  • septembre 2016 à février 2020

DS-150/2 Jebel Ali Sewage Treatment Plant Phase II,

Dubai Municipality, Dubai, UAE, Dec. 2016 to Feb.

2020

(Sr. Resident Engineer)

I was a sr. resident engineer on the construction supervision team overseeing the delivery of this new sewage treatment plant in Jebel Ali with a capacity of 375 MLD, peak flow of 600MLD, and a budget of 1.6 billion AED. I was DM’s prime point of contact for the construction supervision aspects of the project, including progress reporting, safety, financial recommendations, quality control and design modifications. I built a trusted relationship with the management team and with the client's counterpart staff. Also, established an appropriate working relationship with the contractors. On site, I placed an emphasis on safe construction practices (Target Zero) and on maintaining a high quality of construction. I used effective project management and controls systems to regularly report on progress to the client.

Infrastructure and MEP Manager à ACE Consulting Engineers
  • Émirats Arabes Unis - Al Ain
  • avril 2013 à décembre 2016

Emirati Housing Development (EHD) Jebel Hafeet,

Musanada, Al Ain, Abu Dhabi, UAE, Apr. 2013 to Dec. 2016

(Infrastructure and MEP Manager)

I was the acting Infrastructure and MEP manager on the construction supervision team for the delivery of this AED 5.6 billion project comprising 3000 precast Emirati villas over 450 hectares. Also, directly oversaw all the delivery of the public amenities, electrical substations, and all the infrastructure: sewerage, stormwater, potable water, fire alarm/fighting, irrigation, telecommunication, streetlighting, power (MV & LV), FO works, and distribution substations. He was approved for the following competencies by AADC:

• RE, Principal Resident Engineer for the Electrical Power Network

• Electro-Mechanical & Instrumentation Engineer for the Potable Water Network

Sr. Mechanical Engineer à ACE Consulting Engineers
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2011 à avril 2013

Madinat Zayed and Ghayathi Sewage Treatment Plants, Abu Dhabi Sewerage Services Company (ADSSC), Abu Dhabi, UAE, Apr. 2011 to Apr. 2013 (Sr. Mechanical Engineer)

I was the senior mechanical engineer on the construction supervision team overseeing the upgrade to the sewage treatment plant in Madinat Zayed to 37 MLD. The project included new inlet head works, aeration tanks, clarifiers, sludge drying beds, sodium hypochlorite generation, pump room, and more than 7 km of TSE HDPE line, valve chambers, pipe works (DI, GRP, HDPE, UPVC & GI pipes), electrical room, and diesel generator.

Project Manager (Package Manager) à Hayel Saeed Anaa'm Group
  • Yémen - Aden
  • août 2001 à avril 2011

Turnkey Grain Silo & Flour Mills, Yemen Company for Flour Mills & Silos (YCFMS), Yemen (Project Manager), Aug. 2001 - April 2011

I was the project manager for the construction of one the biggest storage grain silos systems in the Middle East, located in Aden, Yemen. The silo has a capacity of 3 × 20, 000 ton (Prado, Spain) with the associated conveying system monitored and controlled via SCADA system. I also delivered a 750 ton/day flour mill and grain silos of 10, 000 and 5, 000 Ton capacity and associated conveying system in Hodeida, Yemen.

Construction Engineer à The Engineering Contracting Company
  • Irak - Bagdad
  • novembre 1998 à août 2001

The Engineering Contracting Company
Refurbishment of Al-Rustimiyah Sewage Treatment Plant Stages 1, 2, & 3, Baghdad, Iraq, Nov. 1998 to Aug. 2001

(Construction Engineer)

Al-Rustimiyah Wastewater Treatment is a Conventional Sewage Treatment Plant serves the East Bank of the Tigris River in Baghdad Capital of Iraq. It was designed to serve a total population equivalent of 1, 500, 000 and produce an average final effluent quality to meet the Iraqi National Standards.

Mechanical Engineer à Mechanical Training Center
  • Irak - Bagdad
  • août 1980 à novembre 1998

Mechanical Training Center
Design & Build Infrastructure Projects, Mechanical

Training Centre, Alexandria, Iraq, Aug.1980 to

Nov.1998

(Mechanical Engineer)

• Design & Built of Waste Water lift station and force main in Alexandria-Iraq serving 200 units residential complex.
• Design & Built of 100m3/h pumping station for potable water in Alexandria-Iraq Training Center and residence complex, (under supervision of WRT-Germany).

• Installation of Potable Water Compact Treatment Unit in Al-Mahmudia - Iraq (Aqua compact unit-German make) including sedimentation, activated carbon containers and pumps, Chlorine dosing, instrumentation and control panel container serving 250 residential units.

• Installation of Central Air Conditioning System including AHU’s, Duct work, Pumps, Cooling Towers and pipe-work, Hot water Boilers in Mechanical Training Center in Alexandria-Iraq (under supervision of LTG-Austria).

• Installation of workshop equipment including Hydraulic Works.

Éducation

Baccalauréat, Mechanical Engineering
  • à University Of Baghdad
  • septembre 1978

Specialties & Skills

Hydraulic Design
Construction Consulting
Project Management
team management
MS Projects
Bentley Hammer
MS Office
Bentley WaterGEMS
AutoCAD
project execution
project work
problem solving
time management
team leadership
teamwork

Langues

Arabe
Langue Maternelle
Anglais
Expert

Adhésions

Member, Iraqi Engineers Union
  • Consultant
  • September 1978

Formation et Diplômes

Diploma- Air Conditioning and Refrigeration Distance Education (Certificat)
Date de la formation:
December 2003
CPM001 Project Management Body of Knowledge-5th Edition (Certificat)
Date de la formation:
April 2014

Loisirs

  • Swimming, Tennis, Basketball & Table Tennis