Azhagar Periyanan, PROJECT ENGINEER ELECTRICAL

Azhagar Periyanan

PROJECT ENGINEER ELECTRICAL

AE ARMA ELEKTROPANC

Lieu
Émirats Arabes Unis
Éducation
Baccalauréat, Electrical & Electronics Engineering
Expérience
17 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 3 Mois

PROJECT ENGINEER ELECTRICAL à AE ARMA ELEKTROPANC
  • Émirats Arabes Unis
  • Je travaille ici depuis juillet 2016

Engineering and Design
To Scrutinize the Contract Design Drawings & Specification, then to raise Clarification Request to consultants in order to understand their design requirements thoroughly, which will help us timely approval of both shop drawings and Material Submittals.
Prepare and Review Shop drawings, Material submissions & Technical design calculations as per the requirement in Contract drawings, BOQ & Technical specification and get approval from the Consultants and Statutory authorities.
LV System Equipment and Component Sizing: Sizing Transformer, Bus duct, Breaker, PFC, VFD and starters, Cable, Battery panel and UPS.
Load Schedule prepation and load Estimation at different operating conditions.
Engineering calculations: Lux Level Calculation using Dialux, Short circuit, load flow and Co-ordination study by using ETAP and SIMARIS software, Voltage drop calculation by using excel spread sheet.
Comparison Studies based on suppliers Quotations.
Delegating Draftsmen for quantity take offs, cross checking quantities.
Co-ordination with internal other services Engineering Teams:-to collect load requirement details for the effective design of the LV network feeding their services.
Co-ordination with Panel board Manufacturer for Correct and timely cost effective production of panel by providing engineering data accordingly.
Making Pre-Qualification documents, both standards as well project specific questionnaires.
Negotiations with suppliers on both technical and commercial aspects of product.
Carry out technical assignment for material and equipment’s being procured to the company.



Installation supervision
Transformer, MDB, SMDB, DB, DC Back up Panels, UPS panels and Bus Duct, and LV Containment in Substations.
MCC panels, Drives, Equipments and LV Containment installation in plant rooms.
Complete, Facade lighting, Landscaping lighting and indoor lighting, General power and Emergency Lighting system installation.
Low Current system installation-BMS, Fire Alarm, CCTV, Tele/data, Access Control System, WMS, PA, AV System.
Effectively Managing material and manpower for Timely completion
Preparation of material requirement list and managing material movement to site from central stores.
Organizing meeting with consultants and suppliers for special systems installation.
Coordination with other services for proper installation.
Coordination with consultants and clients for inspection and Approval.
Preparation of as-built drawings and load schedules.
Testing and Commissioning supervision
Leading a team of testing Engineers and technicians.
Day to day SAT testing planning and arranging resources for conducting tests.
Preparation of data schedule required for Final commissioning.
Coordination with consultants and clients for SAT testing witness.
Managing Testing and commissioning records approval by consultants.
Final system handover.

ELECTRICAL ENGINEER à JUMBO ENGINEERING
  • Émirats Arabes Unis - Dubaï
  • avril 2014 à juin 2015

Projects Handled:

Rasasi Perfumes factory - G+M Office block, factory & warehouse

Polymer Additive Plant - G+1 Office block, factory & warehouse

IKEA Distribution Center - G+M Office block & warehouse


Review of complete electrical system design.

Co-ordinate with authorities, DEWA, Etisalat, Du and JAFZA.

Evaluating tender documents, drawings, & schedules Floating

Comparison Studies based on suppliers Quotations.

Negotiations with suppliers on both technical and commercial aspects of product.

Delegating Draftsmen for quantity take offs, cross checking quantities.

Co-ordinate engineering departments on all aspects during the development of works and confirming the design with requirements

Material submissions & Technical design calculations as per the requirement in Contract drawings, BOQ & Technical specification and get approval from the Consultants and Statutory authorities.

Carry out technical assignment for material and equipment’s being procured .Scheduling & planning the work according to Site clearance and work front.

Managing the site as well as interacting with Other Contractor, Consultant, and Client

Design Engineer - Electrical à ETA MNE DIVISION
  • Émirats Arabes Unis - Dubaï
  • août 2008 à février 2014

Projects Handled:

The Jumeirah beach Facility center in JBR -1 Basement Carparking + 80 Retail Shops + 1 Cinema

Dubai International Airport Expansion (Phase II) for Concourse 3

Liberty House - 40 storey Commercial and residential high rise building located in DIFC Dubai


Engineering and Design

To Scrutinize the Contract Design Drawings & Specification, then to raise Clarification Request to consultants in order to understand their design requirements thoroughly, which will help us timely Approval of both shop drawings and Material Submittals.

preparing Material submittals and Method statements complying with the specification and design requirements in order to get the consultant’s approval.

LV System Equipment and Component Sizing: Sizing Transformer, Bus duct, Breaker, PFC, VFD and starters, Cable, Battery panel and UPS.

Engineering calculations: Lux Level Calculation using Dialux, Short circuit, load flow and Co-ordination study by using ETAP and SIMARIS software, Voltage drop calculation by using excel spread sheet.

Co-ordination with internal other services Engineering Teams:-to collect load requirement details for the effective design of the LV network feeding their services.

Co-ordination with Panel board Manufacturer for Correct and timely cost effective production of panel by providing engineering data accordingly.

Preparation of shop drawings by incorporating all Clararification requests, approved engineering calculation document submittals, approved material submittals and mockup approval comments.


Erection supervision

Transformer, MDB, SMDB, DB, DC Back up Panels, UPS panels and Bus Duct, and Lv Containment in Substations.

MCC panels, Drives, Equipments and Lv Containment installation in plant rooms.

Complete, Facade lighting, Landscaping lighting and indoor lighting,
General power and Emergency Lighting system installation.

Effectively Managing material and manpower for Timely completion

Preparation of material requirement list and managing material movement to site from central stores.

Organizing meeting with consultants and suppliers for special systems installation.

Coordination with other services for proper installation.

Coordination with consultants and clients for inspection and Approval.

Preparation of as-built drawings and load schedules.

Testing and Commissioning supervision
Leading a team of testing Engineers and technicians.

Day to day SAT testing planning and arranging resources for conducting tests.

Preparation of data schedule required for Final commissioning.

Coordination with consultants and clients for SAT testing witness.

Managing Testing and commissioning records approval by consultants.

Final system handover.

Site Engineer - Electrical à Bin Madayah contracting
  • Émirats Arabes Unis - Sharjah
  • août 2005 à février 2008

Projects Handled:

G+3P+10 Residential Building -10 Storey residential building With ground + 3 additional parking level.

Three villas for local Arabs in the capacity of G+1 and G+2.

Éducation

Baccalauréat, Electrical & Electronics Engineering
  • à Mepco schelenk Engineering College / Madurai kamaraj University, tamil nadu ,India
  • mai 2004

It is a 4 year Engineer Course. It covers both mainly Electrical Engineering and basic electronic Engineering. Electrical Engineering Subjects are : Circuit theory, electrical machines,Power system analysis,instrumentation and control systems.

Specialties & Skills

Estimating
Design Review
Installation Management
Testing
Commissioning
LV System Design, Installation,Testing and commissioning, Procurement,material submittal,
Method statement,site execution, man power handling,Planning Schedule, Preparation of Shop Drawing,
DEWA Submission,consultant, client,main contractor coordination,De snagging, handing Over
Voltage drop, Lux Level, Co-ordination study, SIMARIS, ETAP,Dialux
Sizing of Transformer, Cable Breaker, Drives,Capacitor Bank,UPS,Battery Panel,
Auto cad , simaris , ETAP , MS OFFICE

Langues

Anglais
Expert
Hindi
Expert
Malayala
Moyen
Tamil
Expert

Formation et Diplômes

Industrial Auto mation (Formation)
Institut de formation:
Remo institute of technology